Back-up Protection

Circuit-breaker manufacturers publish tables showing combinations of pairs of circuitbreakers, one upstream,one downstream,where the downstream device can be used at a location where the prospective fault current (Ipf) is higher than its breaking capacity (Icu).


The Icu of the upstream devicemust equal or exceed Ipf at its point of installation.

Dictionary
Jarek Wityk

volume

ELI5-S1: BIM Basics E10: Volume Strategy (spatial) explained a term

Read More »

share this page

Leave a Reply

Your email address will not be published. Required fields are marked *