BIM Levels

The transition from the BIM Levels to the concepts in the ISO 19650 series and the UK BIM Framework represents a shift in how we think about BIM maturity. However, for those accustomed to the BIM Levels, understanding how these levels correspond to the new framework can be helpful. Here’s a comparison to provide some […]
VADs

Overview Your Comprehensive Resource on Visual Alarm Devices (VADs) Welcome to our detailed guide on Visual Alarm Devices (VADs). Sourced from leading standards and guidelines, including the CoP-0001 Loss Prevention Code of Practice, Approved Document M vol 2, the BS5839 Guide, FIA Guidance, and Approved Document B – Fire Safety, this guide aims to deliver […]
Young Person

The term “Young Person” in the context of construction, Building Information Modeling (BIM), electrical engineering, or general engineering, typically refers to a younger individual, often a recent graduate or entry-level professional, working within these fields. Here’s a brief overview: In summary, Young Persons in construction, BIM, and engineering play a key role in driving innovation […]
x-ref

The term “X-ref” is commonly used as an abbreviation for “External Reference” in various technical and engineering fields, including construction, Building Information Modeling (BIM), and computer-aided design (CAD). Here’s a brief overview: In summary, X-refs are a fundamental component of modern design and construction processes, enabling efficient, collaborative, and integrated workflows across various specialities.
zone indicator

part of indicating equipment which visually indicates the zone of origin of a alarm of fire or faultwarning BS 4422 2005 Zone Indicator in Fire Alarm Systems The zone indicator is a crucial element in fire alarm systems, particularly in larger buildings or complexes where pinpointing the exact location of a fire or fault is […]
jet reaction

nozzle reactionforce acting in the opposite direction to the water stream leaving the nozzle BS 4422 2005 “Jet reaction,” also known as “nozzle reaction,” is a fundamental concept in fluid dynamics and is particularly important in the context of firefighting equipment. It refers to the force that acts in the opposite direction to the water […]
jet

extinguishing medium, usually water, leaving a nozzle as a continuous stream, water spray, or waterfog (mist) BS 4422 2005 Each of these methods has its own advantages and is chosen based on the nature of the fire, the environment, and the specific goals of the firefighting effort (such as direct extinguishing, creating firebreaks, or cooling). […]
Navigating Construction Projects with Incomplete Building Services Design: Real-world Solutions Wanted 🛠️

Here is my list of reasons why so often we have incomplete Building Services Design before the project starts construction: Incomplete Building Services Design (BSD) before the commencement of construction can arise from a myriad of factors, each with its own set of complexities. Here are several common reasons: Insufficient or Unrealistic Timelines: The specifics […]
How to Rotate Revit Face-Based Families in Any Direction with Tiltable Geometry Placeholders

Mastering 3-Axis Rotation: Transform Revit Face-Based Families with Tiltable Geometry
Exchange Information Requirements (EIR)

The Exchange Information Requirements (EIR) term introduced by BS EN 19650 replaces the PAS 1192 term Employer Information Requirements (EIR) on all projects where BS EN ISO 19650 compliance is required. As the AEC industry transitions from PAS 1192 to the BS EN 19650 Framework, the term Exchange Information Requirements (EIR) may cause some confusion. […]