Project Implementation Plan (PIP)
The Project Implementation Plan (PIP) it is a PAS 1192 term that should assist in establishing of the supply chain’s capability. In summary, it consists of the supplier’s: BIM assessment form(s), the supplier information technology assessment form(s) and the supplier resource assessment form(s). In ISO 19650 Framework does not include an equivalent combined term for […]
Master Information Delivery Plan (MIDP)
The Master Information Delivery Plan (MIDP) is the primary plan for the preparation of project information (from the supplier’s perspective), which is set out as being required in the Exchange Information Requirements (EIR). The MIDP is produced from the aggregation of all applicable delivery teamsTIDP’s. The MIDP lists information deliverables with dates (data drops – […]
Product Data Definition
A Product Data Definition (PDD) document intended to provide a consistent methodology for the definition, creation, management and sharing of product information throughout the life cycle of an asset, based on the purpose of that information and by whom the information is to be used, meant to be part of PAS 1192-7 aimed to provide […]
Archive
History of project information, such that any non-current published information in the published area should move into this area. New parties to the project will receive an invitation to join the CDE through the project Document Controller, once registered User Guides and System Protocols can be accessed via the navigation tree. [source] PDE 4301 Technical […]
federation strategy
ELI5-S1: BIM Basics E4: Federation Strategy Explained The purpose of the federation strategy and the Information Container (model) breakdown structure is to help plan the production of information by separate task teams to the appropriate Level of Information Need at each project stage. What does it mean? The way you do complex projects and systems […]
breakdown structure
decomposition of a defined scope into progressively more detailed levels
information
data that is relevant and useful
Contract Particulars
Contract Particulars refer to the document outlining the Framework Agreement’s specific core terms, which may include but are not limited to the Pricing Schedule, Authorised Officer, Contract Manager, Key Personnel, and Specification (as defined in the Call-Off Terms and Conditions), as well as any other contract-specific details included in the document. Any local authority or […]
information exchange
verb act of satisfying an information requirement (3.3.2) or part thereof [cited from ISO 19650-1:2018(en), 3.3.7]