Product Data Definition
A Product Data Definition (PDD) document intended to provide a consistent methodology for the definition, creation, management and sharing of product information throughout the life
A Product Data Definition (PDD) document intended to provide a consistent methodology for the definition, creation, management and sharing of product information throughout the life
The document aimed to be used by manufacturers and consumers where information about a product, is collated in a standardised and structured way. The information
Responsible, during the design stages, for executing, managing and running clash detection of the federated Project Information Model (PIM), and federating and QA reviewing the
Responsible for ensuring that the BIM workflow has been established for the project and is adhered to by the team during the implementation stages of
a Project Committee (PC), which is created to develop one standard, after which it is disbanded. https://www.iso.org/glossary.html
In respect of asset lifetime PAS 1192-2:2013, describes one project delivery team, the term is connected with word ‘contract’ meaning one or many companies or
The Project Implementation Plan (PIP) it is a PAS 1192 term that should assist in establishing of the supply chain’s capability. In summary, it consists
Responsible for extraction, review, coordination and reporting of data within the native and federated models as well as associated project databases throughout the project stages
It is a term introduced in PAS 1192‑2: 2013 and ISO 19650 set of standards. It means any graphical or non-graphical information such as: Structured
Project Information Requirements (PIR) its a BS EN ISO 19650 term introduced to replace the PAS 1192 term Plain language questions (PLQ) PLQ and PIR
Project Information standards shall be covered within the BIM Execution Plan (BEP). Standards In line with BIM Goals and Uses to ensure continuity that information
During project setup phase It is essential to establish and analyse a timeline that guides the entire team in delivering the project on time. Thus
All parties appointed for the project are defined as members of the Project Team. Each function can be fulfilled by either an individual or multiple
algorithm that generates an interaction schema from an interaction framework, interaction framework schema, and templates file as input [1] 1 Online Browsing Platform (OBP) [WWW
inherent or acquired feature of an item[SOURCE: BS ISO 6707-1:2017, 3.7.1.3] NOTE Examples include thermal efficiency, heat flow, sound reduction index and acoustic power level.PAS
Prospective Fault Current (Ipf) is the value of overcurrent at a given point in a circuit resulting from a fault of negligible impedance between live
Information accepted by the nominated party, in which case it will be suitable for tender or construction (2D model output only). Such that the ‘Published’
having a definite objective and strong desire to achieve it In the context of BIM, it describes a people-centric transformation, regarding information as an asset