Search filters
Search in title
Search in content
Exact matches only
Filter by Categories
Select all
Academy
AI
Automation
Blog
BPMN
Classification and Standardisation
Common Data Environment (CDE)
Dictionary
Digital Twin
Electrical
Fire
How To
Level of
Management
Organization of information
Procurement
Requirements
Standards
State
Sustainability
Uncategorized

CONTENTS

TN system

A system having one or more points of the source of energy directly earthed, the exposedconductive-parts of the installation being connected to that point by

Read More »

top management

person or group of people who directs and controls an organization at the highest level [cited from ISO 19650-5:2020(en), 3.14]

Read More »

Trigger Event

Trigger Events are the occurrences during the life of an asset that causes new or updated information to be required.There are two types of trigger

Read More »

trigger event

a planned or unplanned event that changes an asset (3.2.8) or it’s status during its life cycle (3.2.10), which results in information exchange (3.3.7) [cited from ISO 19650-1:2018(en), 3.2.13]

Read More »

TT system

A system having one point of the source of energy directly earthed, the exposedconductive-parts of the installation being connected to earth electrodes electrically independent of

Read More »

Two Stage Open Book

A procurement method introduced by Constructing Excellence and the Cabinet Office where a client invites prospective integrated teams to bid for a project based on their ability

Read More »

ubiquitous access

The modern era of IT has turned to ubiquitous access to all organizations and users. The vision is  to provide one “universal access,” i.e. access

Read More »

UK BIM Framework

The UK BIM Framework was developed by the UK BIM Alliance, BSI, and the Centre for Digital Built Britain associated with the Construction Industry Council

Read More »

UML diagram

provides the data structure for data templates using objects, collections and relationships between them. The multiplicities in the UML diagram specify the range of allowablecardinality

Read More »

Unified Cloud Platform (UCP)

A unified cloud platform (UCP) has been introduced to facilitate the integration of multiple cloud services into a single cloud environment. The UCP is essentially

Read More »

Unified Modelling Language (UML)

language to provide system (3.13) architects, software engineers, and software developers with toolsfor analysis, design, and implementation of software-based systems as well as for modelling

Read More »

unit

standard measurements of physical quantities that require a clear definition to be useful. The International Bureau of Weights and Measures (BIPM) is responsible for ensuring

Read More »
image illustrating Visual Alarm Devices (VADs)
Blog
Jarek Wityk

VADs

Overview Visual Alarm Devices (VADs) Welcome to our guide on Visual Alarm Devices (VADs). Sourced from leading standards and guidelines, including the CoP-0001 Loss Prevention

Read More »

validation

confirmation, through the provision of objective evidence, that the requirements for a specific intendeduse or application have been fulfilled [SOURCE: BS EN 17412‑1:2020] For example,

Read More »

Value

What the customer wants from the process, and will pay for. [1] [1] The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and Horizontal Construction.

Read More »

Value Stream

Includes all the processes and activities used to design, produce and deliver the product or service to the Customer.[1] [1] The Massachusetts Port Authority, 2015.

Read More »

Value Stream Mapping

A diagram of every step involved in the material and information flows needed to bring a product from request to delivery. [1] [1] The Massachusetts

Read More »
Dictionary
Jarek Wityk

VEAM connector

VEAM connectors refer to a specific type of electrical bayonet type connectors known for their robustness and reliability in harsh environmental conditions. These connectors are

Read More »

Project Design (Building Services)