TN system
A system having one or more points of the source of energy directly earthed, the exposedconductive-parts of the installation being connected to that point by
A system having one or more points of the source of energy directly earthed, the exposedconductive-parts of the installation being connected to that point by
person or group of people who directs and controls an organization at the highest level [cited from ISO 19650-5:2020(en), 3.14]
Trigger Events are the occurrences during the life of an asset that causes new or updated information to be required.There are two types of trigger
a planned or unplanned event that changes an asset (3.2.8) or it’s status during its life cycle (3.2.10), which results in information exchange (3.3.7) [cited from ISO 19650-1:2018(en), 3.2.13]
A system having one point of the source of energy directly earthed, the exposedconductive-parts of the installation being connected to earth electrodes electrically independent of
A procurement method introduced by Constructing Excellence and the Cabinet Office where a client invites prospective integrated teams to bid for a project based on their ability
The modern era of IT has turned to ubiquitous access to all organizations and users. The vision is to provide one “universal access,” i.e. access
The UK BIM Framework was developed by the UK BIM Alliance, BSI, and the Centre for Digital Built Britain associated with the Construction Industry Council
provides the data structure for data templates using objects, collections and relationships between them. The multiplicities in the UML diagram specify the range of allowablecardinality
A unified cloud platform (UCP) has been introduced to facilitate the integration of multiple cloud services into a single cloud environment. The UCP is essentially
language to provide system (3.13) architects, software engineers, and software developers with toolsfor analysis, design, and implementation of software-based systems as well as for modelling
An uninterruptible power supply (UPS) is used to maintain the supply to an essential service duringmains supply outages. On loss ofmains supply,a storage device in
standard measurements of physical quantities that require a clear definition to be useful. The International Bureau of Weights and Measures (BIPM) is responsible for ensuring
The United States Army Corps of Engineers is an engineer formation of the United States Army that has three primary mission areas: engineer regiment, military
Overview Visual Alarm Devices (VADs) Welcome to our guide on Visual Alarm Devices (VADs). Sourced from leading standards and guidelines, including the CoP-0001 Loss Prevention
confirmation, through the provision of objective evidence, that the requirements for a specific intendeduse or application have been fulfilled [SOURCE: BS EN 17412‑1:2020] For example,
What the customer wants from the process, and will pay for. [1] [1] The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and Horizontal Construction.
Includes all the processes and activities used to design, produce and deliver the product or service to the Customer.[1] [1] The Massachusetts Port Authority, 2015.
A diagram of every step involved in the material and information flows needed to bring a product from request to delivery. [1] [1] The Massachusetts
VEAM connectors refer to a specific type of electrical bayonet type connectors known for their robustness and reliability in harsh environmental conditions. These connectors are