verification
confirmation, through the provision of objective evidence, that specified requirements have beenfulfilled [SOURCE: BS EN 17412‑1:2020] Verification is the process of checking that the product/service
confirmation, through the provision of objective evidence, that specified requirements have beenfulfilled [SOURCE: BS EN 17412‑1:2020] Verification is the process of checking that the product/service
Virtual Design and Construction (VDC) is the use of design models and project information to apply construction processes in a virtual environment to reduce time,
ELI5-S1: BIM Basics E10: Volume Strategy (spatial) explained a term defined by BS 1192:2007 means a spatial subdivision of a project to allow multiple people
ELI5-S1: BIM Basics E10: Volume Strategy (spatial) explained Introduction Volume Strategy enables information management, spatial coordination, and concurrent engineering, ultimately fitting together like a complex
VISI acronym for Dutch standard for communication between partners in construction projects translates as Creating conditions for the implementation of ICT standardization for the construction
weakness that can be exploited to cause harm [cited from ISO 19650-5:2020(en), 3.15]
The opposite of value. There are eight basic types of waste: motion waiting transportation of goods over-processing under utilization overproduction inventory defects [1] [1] The
A supply-chain management term describing partially finished information awaiting completion. In other words, the Information model is not to be used by any other project party.
A division of standardised process and activities into named stages during the life of a system or facility. The process and activities extending from the
Project management focuses on project completion by the execution of various processes. Most of the workflows comprising repetitive tasks can be optimised by applying workflow
The term ‘workflow’ is used in ISO 19650 instead of the PAS 1192 term ‘process’.
Workflow management systems allow organisations to identify and control activities associated with a business process. Effective workflow management offers the opportunity to measure and analyse
WORKING GROUP (WG) Specialized group within a committee that is responsible for drafting a particular standard or set of deliverables. It is usually quite small, composed
A workset is a collection of elements in a work shared Revit project. The purpose of worksets is to enable multiple users to work on
A collection of content libraries and supporting files that define and embody a BIM standard. A workspace includes BIM libraries such as wall types, standard
The term “X-ref” is commonly used as an abbreviation for “External Reference” in various technical and engineering fields, including construction, Building Information Modeling (BIM), and
The term “Young Person” in the context of construction, Building Information Modeling (BIM), electrical engineering, or general engineering, typically refers to a younger individual, often
Z1 – That part of the earth fault loop impedance which comprises the impedance under earth fault conditions of the line conductor of the circuit
Z2 – That part of the earth fault loop impedance which comprises the impedance under earth fault conditions of the circuit protective conductor (cpc) of
That part of the earth fault loop impedance which is external to the circuit under consideration. For the supply cable it will be the impedance