The importance of Information Requirements to a successful Asset Information Management (AIM) System
Introduction One of the challenges is the Appointing Party’s difficulties with the development of successful Operational Information Requirements in relation to asset management. Understanding the
Architecture, Engineering, Construction and Operation (AECO)
Architecture, Engineering, Construction and Operation usually expressed as acronym AECO is an extension of the Architecture, Engineering, Construction (AEC). Both terms are related to the
BS ISO 55002:2018
Asset management — Management systems Guidelines for the application of ISO 55001
Look Ahead Plan
A short interval plan, based on the pull/phase plan, that identifies all the activities to be performed in the next 6 (or other) weeks. The
Supporting Information
Supporting information shall be used where applicable and relevant to fully understand and evaluate information requirements or acceptance criteria. Supporting information includes but is not
metadata
ELI5-S1: BIM Basics E6: Metadata explained Understanding Metadata in Building Information Modeling (BIM) Metadata provides critical information about an item’s content, making it easier to
delivery phase
part of the life cycle (3.2.10), during which an asset (3.2.8) is designed, constructed and commissioned [cited from ISO 19650-1:2018(en), 3.2.11] ISO 19650-2:2018 Standard dedicated to the delivery phase
TN system
A system having one or more points of the source of energy directly earthed, the exposedconductive-parts of the installation being connected to that point by
information container
ELI5-S1 BIM Basics E12_Information Container explained A persistent set of information retrievable from within a file, system, or application storage hierarchy. [1] named persistent set
BS EN ISO 19650-2:2018
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) — Information management using building information modelling Part 2:
AD Hoc Group (AHG)
AD HOC GROUP (AHG) Group set up within a committee to look into a particular problem and report back to the parent committee at a meeting.
Post-COVID 19 pandemic Architecture Engineering and Construction (AEC) Industry
Introduction The COVID19 pandemic has impacted global health and the economy. This report explores the shift in Building Information Modelling (BIM) and associated technology, its
Assignment matrix
Responsibility matrix [ISO19650] In ISO 19650 there is a principle to develop responsibility matrices to cover information management activities and information delivery. Responsibility matrix [PAS1192]
DWG
DWG (“drawing format”) is a binary file format licensed by Autodesk and used for storing two and limited three-dimensional design data and metadata. It is
Waste
The opposite of value. There are eight basic types of waste: motion waiting transportation of goods over-processing under utilization overproduction inventory defects [1] [1] The
client
actor (3.2.1) responsible for initiating a project and approving the brief [cited from ISO 19650-1:2018(en), 3.2.5] The UK BIM Alliance, responding to the inconsistency between the current
Subcommittee (SC)
a Subcommittee (SC), which addresses a specialized area within a TC; https://www.iso.org/glossary.html
jet reaction
nozzle reactionforce acting in the opposite direction to the water stream leaving the nozzle BS 4422 2005 “Jet reaction,” also known as “nozzle reaction,” is
Information delivery cycle
It is a term introduced first in PAS 1192 and updated in ISO 19650 framework, it depicts the process of specifying and delivery of project
Budget
The tender response for designing, constructing and operating the existing building and the additional extension shall include the project budget’s bid documentation. The budget must