Project Information Model (PIM)
It is a term introduced in PAS 1192‑2: 2013 and ISO 19650 set of standards. It means any graphical or non-graphical information such as: Structured
Cable k2s2
k2s2 its an Energy withstand of cable in A2s. For example,a cable with a withstand of 12 x 104 A2s, can sustain without permanentdamage,a fault
Lean construction
Lean Construction is the method of project management aiming to reduce waste on a project and improving the efficiency and quality of produced work [1].
BIM Execution Plan (BEP)
The purpose of the BIM Execution Plan (BEP) is to clearly define the actions required of each member of the project team in order to
Task Information Delivery Plan (TIDP)
schedule of information containers and delivery dates, for a specific task team [cited from ISO 19650-2:2018(en), 3.1.3.4] The Task Information Delivery Plan (TIDP) is defined
property
inherent or acquired feature of an item[SOURCE: BS ISO 6707-1:2017, 3.7.1.3] NOTE Examples include thermal efficiency, heat flow, sound reduction index and acoustic power level.PAS
How to Rotate Revit Face-Based Families in Any Direction with Tiltable Geometry Placeholders
Mastering 3-Axis Rotation: Transform Revit Face-Based Families with Tiltable Geometry
Last Planner®
The person or group that makes assignments to direct workers. Project Architect and ‘discipline lead’ are common names for last planners in design processes. ‘Superintendent’
energy let-through of a device (I2t)
I2t The energy let-through of a device in A2s. The total amount of energy let through by a protective device for a given level of
x-ref
The term “X-ref” is commonly used as an abbreviation for “External Reference” in various technical and engineering fields, including construction, Building Information Modeling (BIM), and
Waste
The opposite of value. There are eight basic types of waste: motion waiting transportation of goods over-processing under utilization overproduction inventory defects [1] [1] The
Intermediate Event (Message/Throwing)
A message intermediate event can be used to both send and receive messages. The event marker must be filled when used to “throw” the message
Technical Committee (TC)
a Technical Committee (TC), which develops standards in a certain sector or industry; https://www.iso.org/glossary.html
Crown Commercial Services (CCS)
The Crown Commercial Service (CCS) is an administrative agency and trading fund of the Cabinet Office of the UK Government, responsible for the supervision of
Dimensionality
A dimension of space, such as width, height, or length. can be zero-dimensional (location point), one-dimensional (e.g. line, curve, path), two-dimensional (e.g. surface, face), or
geometrical
This is an ISO 19650 term which replaces the PAS1192 term “graphical”. Geometrical is more appropriate to describe spatial positioning and relationships
Gateway (Parallel)
[And] When used to split the sequence flow, all outgoing branches are activated at the same time. When parallel branches are merged, it waits for
Organisational maturity
a measure of an organisation’s readiness and capability expressed through its people, workflows, information, technologies and the reliable measurement procedures that are in place [source: Understanding Organizational