Explore The Ultimate BIM Knowledge Hub
Your one-stop resource for BIM management and integration expertise.
Revit Guides
Data Management
ELI5
Spacial Asset
A spacial asset can be defined as a specific location such as a zone, boundary, area, floor or room with a known location and extents.For most businesses, spacial assets usually
The Centre for Digital Built Britain
The Centre for Digital Built Britain (CDBB) CDBB is a partnership between the University of Cambridge and The Department for Business, Energy and Industrial Strategy (BEIS). It is the custodian
Builders work in connection (BWIC)
Coordination of Builders work in connection to services i.e. openings in walls or floors for MEP Services It is anticipated that as a minimum, all builders work openings of 50x50mm
Built Environment
All forms of buildings (residential, industrial, commercial, hospitals, schools), all economic infrastructure (above and below ground) and the urban space and landscape between and around buildings and infrastructure3, as well
buildingSMART Data Dictionary
PD 19650‑0:2019 In short, the BuildingSMART Data Dictionary is a library for everything to do with the building. NumberName is an int key and string value that can be stored
System of systems
A system of systems is a collection of many different systems, each with its own characteristics. [1] System theory assumes that certain underlying concepts and principles are applicable to different
data template
schema providing a data structure used to describe the properties of objects NOTE The relevant scope of the data template should be used together with the term “data template”. E.g.
Stage 2 Maturity
BIM at Maturity Stage 2 according to the ISO 19650 Framework is “the use of a shared digital representation of a built asset to facilitate design, construction and operation workflows
expert
person who, through knowledge or experience, has competence to give an opinion in the fields about which he/she is consulted[SOURCE: ISO 13302:2003, 3.10, modified — The domain “” has been
Nominal line voltage to earth (Uo)
Uo Nominal line voltage to earth. Assumed to be 230 V for grid connected systems.

Force Relinquish
Tip of the Day (TOD): How to Relinquish Locked Revit Models If you’ve ever been frustrated by locked Revit model elements when a team member is unavailable to relinquish them,

How to respond to request for proposal (RFP)
Introduction It can be said that the digitalization of construction began with designers moving from drawing boards to computers. [1] In Architecture, Engineering, Construction and Operation (ACEO), the focus has
actor
person, organization or organizational unit involved in a construction process [cited from ISO 19650-1:2018(en), 3.2.1]
Adiabatic
Adiabatic checks are required to determine whether conductorsmight be damaged by the thermal effects resulting from the level of calculated fault conditions.

Emergency Lighting in Toilet Cubicles
In any office building, ensuring the safety and well-being of employees and visitors is of paramount importance. Emergency lighting plays a vital role in providing illumination during power outages or
Project BIM Coordinator
Responsible, during the design stages, for executing, managing and running clash detection of the federated Project Information Model (PIM), and federating and QA reviewing the Asset Information Model (AIM) for

PAS 1192 vs ISO 19650 terms
Quick reference guide In here you can find a quick reference guide with PAS1192 and ISO 19650 terminology comparison. PAS references (superseded) ISO References (current) Pre-contract BEP Pre-appointment BEP Post-contract
Tier 1
In the construction industry, Tier 1 is a Contractor referred in ISO 19650 as the Lead appointed party, who provide goods or services directly to the ultimate client. The Tier
Competent person
Aperson who possesses sufficient technical knowledge, relevant practical skills and experience for the nature of the electrical work undertaken and is able at all times to prevent danger and,where appropriate,

Lead Appointed Party context of information exchange
ELI5-S2: BIM in Practice E5: Lead Appointing Party context of information exchange Understanding the Lead Appointed Party (T1) Context of Information Exchange in BIM Welcome to the fifth installment of
Ecocide
In environmental justice, ecocide is the criminalised activity of substantially harming or destroying ecosystems in their entirety or by harming individual species. At time of writing, 10 countries have criminalised
Information Protocol
The First Edition of the Building Information Model (BIM) Protocol published in 2013 identifies and puts into place specific obligations, liabilities and associated limitations on the use of the Building
BS 9999:2017
Fire safety in the design, management and use of buildings – Code of practice

Appointed Party context of information exchange
ELI5-S2: BIM in Practice E6: Appointed Party context of information exchange Understanding the Appointed Party (T2-T4) Context of Information Exchange in BIM Welcome to the final instalment of our ELI5-S2
Budget
The tender response for designing, constructing and operating the existing building and the additional extension shall include the project budget’s bid documentation. The budget must incorporate the total amount of
Gateway (Exclusive)
[XOR] When splitting, directs the sequence flow to one of the outgoing branches. When merging, it waits for one incoming branch to finish before starting the outgoing flow.[1] Symbol
Grouping rating factor (Cg)
Grouping rating factor used for calculatingminimum required cable size. For cables installed in air, values for this factor are given BS7671:2018,Tables4C1,4C4,4C6.For ground installations, values are given in Table4C2. Grouping a
risk register
means a risk register containing the risks associated with the timely delivery of information as may be identified in the Information Particulars and/or provided in accordance with the Information Standard.
enumerated type value
data type consisting of a set of named values called elements, members, enumeral, or enumerators ofthe type
Two Stage Open Book
A procurement method introduced by Constructing Excellence and the Cabinet Office where a client invites prospective integrated teams to bid for a project based on their ability to deliver an outline brief
promotor
algorithm that generates an interaction schema from an interaction framework, interaction framework schema, and templates file as input [1] 1 Online Browsing Platform (OBP) [WWW Document], n.d. URL https://www.iso.org/obp/ui#search (accessed

information delivery milestone
scheduled event for a predefined information exchange [cited from ISO 19650-2:2018(en), 3.1.3.2] Milestones act as signposts through the course of a project. An information delivery milestone is a point in
Project Committee (PC)
a Project Committee (PC), which is created to develop one standard, after which it is disbanded. https://www.iso.org/glossary.html
4D Modeling
4D Modelling also referred to as 4D BIM, when supported by existing planning techniques, can improve project delivery times and schedules. To make the gains possible, all project members must
digital built environment
The terminology such as digital built environment and smart asset management, often referred to as Digital Construction, encompasses multiple technologies and processes related to information or project management and the
Existing Conditions Modeling
A process of developing a 3D model of the existing conditions for an asset, or a specific area within a facility.The model can be developed based on laser scanning surveys
Team’s Capability and Capacity
The competence and understanding of BIM, of the consultants and delivery team partners to be involved in the project, shall be assessed and results included in Post-Contract BEP. The assessment
Architecture, Engineering and Construction (AEC) integration with Industry 4.0
The meaning of the term Industry 4.0 has not been concluded. There is a level of ambiguity of what it means for the construction industry[1] According to Jim Mansfield,
BS ISO 21500:2012
Guidance on project management ISO 21500 describes guidelines for managing projects and processes in project management, including standards, methods, and processes. The standard is intended to align with related international

Emergency Voice Communication System (EVCS)
An Emergency Voice Communication System (EVCS) or (EVC) is a fixed, monitored and maintained, bidirectional, full duplex voice communication system (Refuge system) designed to facilitate the orderly evacuation of disabled

Organisational Purpose
A sense of organisational purpose is an essential part of promoting organisational effectiveness, which motivates individuals to do work and create something or justify the existence of something. Cooperation
replacement request
A replacement request corresponds to the creation of the property and the deactivation of the property it replaces. After validation of the replacement request by the experts, the replaced property
Management of Sustainability in BIM
Introduction Sustainability in terms of Building Information Modelling (BIM) was defined as the sixth dimension of BIM by a large consulting firm as “what to do in terms of sustainability”[1]
Handover
After the project is completed, the Appointing Party expects to receive Asset Information Model (AIM) compliant with the Exchange Information Requirements (EIR). The aim is to support the life
Navisworks file format (NWF)
When saving to a “Navisworks file format (NWF), only a list with pointers to the files currently loaded is saved, along with the scene’s environment, the current view, clash results,
Lean Project Delivery System
An organized implementation of Lean Principles and Tools combined to allow a team to operate in unison.[1] [1] The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and Horizontal Construction.
Distribution board
An assembly containing protective devices associated with one or more outgoing circuits fed from an incoming circuit. In the ProDesign software,a distribution board (DB) may be single-phase or three-phase,and can

Quality Control
Quality control indicates an operational activity within the process, while quality assurance focuses on constructing confidence that quality requirements will be met. Quality is incorporated into production and verified during