BS ISO 8000-2:2020
Data quality Part 2: Vocabulary ISO 8000 is an emerging technology standard for organizations that want to improve business processes and control operating costs throughout
Data quality Part 2: Vocabulary ISO 8000 is an emerging technology standard for organizations that want to improve business processes and control operating costs throughout
Information technology—Process assessment Process measurement framework for assessment of process capability
The tender response for designing, constructing and operating the existing building and the additional extension shall include the project budget’s bid documentation. The budget must
Coordination of Builders work in connection to services i.e. openings in walls or floors for MEP Services It is anticipated that as a minimum, all
It is a UK green building certification system, launched in 1990 by the Building Research Establishment (BRE), similar to LEED. Both systems confirm the level
PD 19650‑0:2019 In short, the BuildingSMART Data Dictionary is a library for everything to do with the building. NumberName is an int key and string
individual or multiple buildings (e.g. a site or campus) or infrastructure (e.g. roads, railways, pipelines, dams, docks, etc.) built as part of a construction project
All forms of buildings (residential, industrial, commercial, hospitals, schools), all economic infrastructure (above and below ground) and the urban space and landscape between and around
Business goals drive organisational outcomes, helping to keep the focus on the company’s important short and long term priorities. The goals must be defined, understood,
Business Process Modelling Notation (BPMN) is a flow chart method for modelling the steps of a planned business process from beginning to end. It is
The parametric behaviour of an object describes whether its shape, position, and orientation are designed to be dependent on other information associated with the object
Post-appointment BEP confirms and defines the delivery team’s approach to information management in the appointed project. It is a BIM Execution Plan (BEP) which shall
This PAS 1192 term has been superseded by ISO 19650 term Post-appointment BEP. It is a BIM Execution Plan (BEP) which shall be re-submitted by
Pre-appointment BEPs communicates the delivery team’s intended approach to the information management process in the project, it is submitted as part of the prospective Lead
On projects where ISO 19650 Framework has implemented a term, Pre-appointment BEP is used instead of the PAS 1192 term Pre-contract BEP. The meaning is
Responsible for ensuring that the BIM workflow has been established for the project and is adhered to by the team during the implementation stages of
The term “smart building” was originally introduced by the European Union in the Energy Performance of Buildings Directive (EPBD)[1] as one of the main enablers of the
Introduction While comparing the experience of working in smaller practices fulfilling the combined role of designer shared with BIM leadership position, and the experience of