Dictionary
Jarek Wityk

BIM Execution Plan (BEP)

The purpose of the BIM Execution Plan (BEP) is to clearly define the actions required of each member of the project team in order to successfully deliver the BIM workflows

Read More »

Capital delivery phase

Delivery phase [ISO1950] Delivery phase is a simplification of capital/delivery phase without making any assumption about how the project funding is being treated in financial accounting

Read More »

Project delivery team

In respect of asset lifetime PAS 1192-2:2013, describes one project delivery team, the term is connected with word ‘contract’ meaning one or many companies or individuals employed either directly or

Read More »

Delivery team

In ISO 19650 the Delivery team term replaces the term ‘ Project Delivery team’ the meaning meant to remain the same, but the change puts the client (Appointing Party) outside

Read More »

BS EN ISO 19650-2:2018

Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) — Information management using building information modelling Part 2: Delivery phase of the assets

Read More »

minor change

change that does not affect the meaning, function or intended use NOTE 1 Definition applies to properties and groups of properties.NOTE 2 Examples of this type of change are new

Read More »

System of systems

A system of systems is a collection of many different systems, each with its own characteristics. [1] System theory assumes that certain underlying concepts and principles are applicable to different

Read More »

System of engagement

The System of Engagement is defined as a platform that manages supported digital engagement, of systems like Browsing, Web Chat, Messaging, videos (Facebook, WhatsApp, TEAMS, ZOOM, Signal, Slack, etc.), various

Read More »

Post-appointment BEP

Post-appointment BEP confirms and defines the delivery team’s approach to information management in the appointed project. It is a BIM Execution Plan (BEP) which shall be re-submitted by the Lead

Read More »

Mobilization Plan

A plan for the Mobilization of the Delivery Team’s resources in accordance with the Information Standard which is contained in the Appointment or, if no Mobilization Plan is contained in

Read More »

Assignment

A request or offer resulting in a Reliable Promise and is ready to be placed on the Weekly Work Plan (WWP) for performance. An assignment must meet the characteristics for

Read More »

Commissioning

A building has successfully gone through the commissioning process when its equipment and systems have been examined and tested to perform as designed, and its operators have been trained to

Read More »

Integrated Project Delivery

Integrated Project Delivery (IPD) is a collaboration of all parties, systems and practices to optimize and maximize project success. Defined by the American Institute of Architects, IPD is typically applied

Read More »

Last Planner System®

The collaborative, commitment-based planning system that integrates “should-canwill-did planning” (pull planning, make-ready look-ahead planning with constraint analysis, weekly work planning based upon reliable promises, and learning based upon analysis of

Read More »

Waste

The opposite of value. There are eight basic types of waste: motion waiting transportation of goods over-processing under utilization overproduction inventory defects [1] [1] The Massachusetts Port Authority, 2015. BIM

Read More »

BIM Use

A Use Case is a description of an intended use of the BIM, along with a description of the type(s) of data that must be in the BIM in order

Read More »

Activity

An identifiable chunk of work with recognized prerequisites to begin and a recognized State of Completion – or Conditions of Satisfaction. Another way to look at an activity – establish

Read More »

Work stages

A division of standardised process and activities into named stages during the life of a system or facility. The process and activities extending from the definition of its requirements to

Read More »

BIM Strategic Lead

Responsible for project strategic direction from the tender stage, guides project set up and advises on the project when needed. Typical Lead Appointed Party BIM staff duties include: Development of

Read More »

Project BIM Manager

Responsible for ensuring that the BIM workflow has been established for the project and is adhered to by the team during the implementation stages of the project.  [Appointment: Lead Appointed

Read More »

Project BIM Coordinator

Responsible, during the design stages, for executing, managing and running clash detection of the federated Project Information Model (PIM), and federating and QA reviewing the Asset Information Model (AIM) for

Read More »

Specialist BIM Manager / Coordinator

The Specialist BIM Coordinator duties will reflect those for the Project BIM Coordinator but will be specific for discipline or trade-specific models and data deliverables. Responsible for checking, reviewing and

Read More »

Project Information Manager

Responsible for extraction, review, coordination and reporting of data within the native and federated models as well as associated project databases throughout the project stages to ensure client and BEP

Read More »

Builders work in connection (BWIC)

Coordination of Builders work in connection to services i.e. openings in walls or floors for MEP Services It is anticipated that as a minimum, all builders work openings of 50x50mm

Read More »

Scope

Bid response should include a scope management plan containing all the tasks necessary for successful project delivery. The plan shall define the implementation and verification of workflows. A project should

Read More »

Budget

The tender response for designing, constructing and operating the existing building and the additional extension shall include the project budget’s bid documentation. The budget must incorporate the total amount of

Read More »

Risk management

Risk management provides an overview of using risk analysis as an organized method for identifying and measuring risks. How to effectively assemble and manage a project team and effectively assemble

Read More »