Navisworks file format (NWF)
When saving to a “Navisworks file format (NWF), only a list with pointers to the files currently loaded is saved, along with the scene’s environment,
When saving to a “Navisworks file format (NWF), only a list with pointers to the files currently loaded is saved, along with the scene’s environment,
What the customer wants from the process, and will pay for. [1] [1] The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and Horizontal Construction.
Includes all the processes and activities used to design, produce and deliver the product or service to the Customer.[1] [1] The Massachusetts Port Authority, 2015.
A diagram of every step involved in the material and information flows needed to bring a product from request to delivery. [1] [1] The Massachusetts
Virtual Design and Construction (VDC) is the use of design models and project information to apply construction processes in a virtual environment to reduce time,
The opposite of value. There are eight basic types of waste: motion waiting transportation of goods over-processing under utilization overproduction inventory defects [1] [1] The
A Use Case is a description of an intended use of the BIM, along with a description of the type(s) of data that must be
An identifiable chunk of work with recognized prerequisites to begin and a recognized State of Completion – or Conditions of Satisfaction. Another way to look
…’An agent is just something that acts (agent comes from the Latin agree, to do). Of course, all computer programs do something, but computer agents
A division of standardised process and activities into named stages during the life of a system or facility. The process and activities extending from the