model validation checklist
The example checklist consists of checks which assure quality within models and information, to eliminate errors and achieve desired project outcomes. Table 1 – Model
The example checklist consists of checks which assure quality within models and information, to eliminate errors and achieve desired project outcomes. Table 1 – Model
ELI5-S1: BIM Basics E4: Federation Strategy Explained The purpose of the federation strategy and the Information Container (model) breakdown structure is to help plan the
A lane is a sub-partition within a process (often within a pool) that runs the length of the process level, either vertically or horizontally. Lanes
Data objects provide information about the activities that must be performed and/or the results that they produce. Elements of data objects must be contained within
Because a group is not an activity or a flow object, it cannot connect to sequence or message flows. Furthermore, groups are not constrained by
Text annotations are a way for a modeller to provide additional information to a BPMN diagram reader. The text annotation object can be associated with
information delivery manual (IDM) Documentation that captures the business process and specifies in detail the information that a user performing a particular role is required
decomposition of a defined scope into progressively more detailed levels
The parametric behaviour of an object describes whether its shape, position, and orientation are designed to be dependent on other information associated with the object