Grouping rating factor (Cg)
Grouping rating factor used for calculatingminimum required cable size. For cables installed in air, values for this factor are given BS7671:2018,Tables4C1,4C4,4C6.For ground installations, values are
Grouping rating factor used for calculatingminimum required cable size. For cables installed in air, values for this factor are given BS7671:2018,Tables4C1,4C4,4C6.For ground installations, values are
After the project is completed, the Appointing Party expects to receive Asset Information Model (AIM) compliant with the Exchange Information Requirements (EIR). The aim
The presence of harmonic content in the line conductors of a three-phase and neutral circuit can give rise to excessive levels of load current in
Ch Rating factor used for calculating theminimum required cable size in the presence of harmonic currents.See BS7671:2018,Appendix 4, section 5.5.
Heating, Ventilation and Air-Conditioning (HVAC). All necessary heating, ventilation air-conditioning and specialty equipment, including air distribution ducts for supply, return, and ventilation and exhaust ducts,
The “identification” is ISO 19650 term equivalent to PAS 1192 term ‘naming’
BS EN ISO 29481-1 Building information models – Information delivery manual (IDM) PD ISO/TS 12911:201
the concept that classifies any real-world or imaginary thing that has an individuality that is not dependent on a commonality between things Note 1 to
The industrial IoT (IIoT) forms an integral part of Industry 4.0, and smart manufacturing refers to interconnected sensors, and other input/output devices linked to manufacturing
Industry 4.0 is more than just manufacturing. Smart, connected technologies transform how we design, manufacture, use and maintain parts, products, and entire buildings. The interconnected
conceptual data schema and exchange file format for building information modelling (BIM) data BS EN ISO 23387:2020 In general, IFC, or “Industry Foundation Classes”, is
In the context of BIM and Digital Construction, the term is referred to as institutional and personal inertia to change, one of the most common
reinterpretable representation of data in a formalized manner suitable for communication, interpretation or processing [cited from ISO 19650-1:2018(en), 3.3.1]
ELI5-S1 BIM Basics E12_Information Container explained A persistent set of information retrievable from within a file, system, or application storage hierarchy. [1] named persistent set
Responsible for setup and management of the Common Data Environment (CDE), document submission, RFI and other project document transactions. [Appointment: Lead Appointed Party Information Controller,
It is a term introduced first in PAS 1192 and updated in ISO 19650 framework, it depicts the process of specifying and delivery of project
information delivery manual (IDM) Documentation that captures the business process and specifies in detail the information that a user performing a particular role is required
scheduled event for a predefined information exchange [cited from ISO 19650-2:2018(en), 3.1.3.2] Milestones act as signposts through the course of a project. An information delivery
verb act of satisfying an information requirement (3.3.2) or part thereof [cited from ISO 19650-1:2018(en), 3.3.7]