Parametric behaviour
The parametric behaviour of an object describes whether its shape, position, and orientation are designed to be dependent on other information associated with the object
The parametric behaviour of an object describes whether its shape, position, and orientation are designed to be dependent on other information associated with the object
The latest message related to PAS 1192-7 is a tweet from Paul Surin is that PAS1192-7 confirming that CPNI and BSI have agreed to cease
Built environment – Management and operation of interconnected construction data dictionaries Specification
The Publicly Available Specification (PAS) 1192 part two was published in February 2013; the specification was based on existing Code of practice BS 1192 dated
An element of a BIM strategy which is often overlooked. Clear communication is required as to why and how you intend to implement BIM and
Apart from the weekly model coordination effort that focuses on spatial coordination and clash resolution, the Appointment BIM Manager should review all disciplines project models
A submittal state defining the intent or suitability. Permitted Purpose means any purpose related to the Works (and/or (without limitation) the construction, refurbishment, extension, operation,
A physical asset is an item of economic, commercial, or exchange value that has a material existence.Physical assets are also known as tangible assets.For most
The publication of ISO 19650 set of standards replaces use of PLQ and instead introduce the term with exchange information requirements (EIR) and project information
It is a project-specific “digitally checkable” framework set-up to ensure that the deliverables of all contributors are identified and appropriate to the decisions required at
a moment in time where an organisation’s readiness, change into organisational capability/maturity Macro-BIM adoption: Conceptual structures Bilal Succar Mohamad Kassem Tweet The Point of Adoption
A pool is a graphical representation of a collaboration participant. A pool serves as a container for the sequence flows that occur between activities (of
It’s a versatile file format developed by Adobe that allows people to easily present and exchange documents – regardless of the software, hardware, or operating
Post-appointment BEP confirms and defines the delivery team’s approach to information management in the appointed project. It is a BIM Execution Plan (BEP) which shall
This PAS 1192 term has been superseded by ISO 19650 term Post-appointment BEP. It is a BIM Execution Plan (BEP) which shall be re-submitted by
Power factor is the ratio of the resistance (R) and impedance (Z) in a circuit, that is:Power factor = cos ∅ =R/Z
Pre-appointment BEPs communicates the delivery team’s intended approach to the information management process in the project, it is submitted as part of the prospective Lead
On projects where ISO 19650 Framework has implemented a term, Pre-appointment BEP is used instead of the PAS 1192 term Pre-contract BEP. The meaning is
construction process (3.3.2) determining construction properties (3.5.1) for the built environment (3.1.7) before it is designed[1] 1 Online Browsing Platform (OBP) [WWW Document], n.d. URL https://www.iso.org/obp/ui#search (accessed 4.10.21).
set of interrelated or interacting activities that transforms inputs into outputs [SOURCE: ISO 9000:2005, definition 3.4.1 (without notes)] ISO 14040:2006(en), 3.11 It is a PAS1192 term replaced