person or group of people who directs and controls an organization at the highest level [cited from ISO 19650-5:2020(en), 3.14]
person, organization or organizational unit involved in a construction process [cited from ISO 19650-1:2018(en), 3.2.1]
An Emergency Voice Communication System (EVCS) or (EVC) is a fixed, monitored and maintained, bidirectional, full duplex voice communication system (Refuge system) designed to facilitate the orderly evacuation of disabled
actor (3.2.1) responsible for initiating a project and approving the brief [cited from ISO 19650-1:2018(en), 3.2.5] The UK BIM Alliance, responding to the inconsistency between the current guidance of CIC BIM Protocol,
a measure of ability to perform and function [cited from ISO 19650-1:2018(en), 3.3.18]
part of the life cycle (3.2.10), during which an asset (3.2.8) is designed, constructed and commissioned [cited from ISO 19650-1:2018(en), 3.2.11] ISO 19650-2:2018 Standard dedicated to the delivery phase
amount and type of risk that an organization is willing to pursue or retain [cited from ISO 19650-5:2020(en), 3.5]
schedule of information containers and delivery dates, for a specific task team [cited from ISO 19650-2:2018(en), 3.1.3.4] The Task Information Delivery Plan (TIDP) is defined by the ISO 19650 framework
a planned or unplanned event that changes an asset (3.2.8) or it’s status during its life cycle (3.2.10), which results in information exchange (3.3.7) [cited from ISO 19650-1:2018(en), 3.2.13]
state of relative freedom from threat (3.13) or harm caused by deliberate, unwanted, hostile or malicious acts [cited from ISO 19650-5:2020(en), 3.7]
It is a project-specific “digitally checkable” framework set-up to ensure that the deliverables of all contributors are identified and appropriate to the decisions required at each work stage. The plan
The information needed to support a business or other activity. specification for what, when, how and for whom information (3.3.1) is to be produced [cited from ISO 19650-1:2018(en), 3.3.2] Term directly related to:
scheduled event for a predefined information exchange [cited from ISO 19650-2:2018(en), 3.1.3.2] Milestones act as signposts through the course of a project. An information delivery milestone is a point in
weakness that can be exploited to cause harm [cited from ISO 19650-5:2020(en), 3.15]
In AEC industry with reference to information systems management, the single source of truth refers to Common Data Environment (CDE) The single source of truth is a method of structuring
correlation between the outcome and the resources used a measure of the utilization of resources to realize a given objective Note 1 to entry: An activity is efficient if it minimizes
Quality assurance (QA) is the action or process of verification that a requirement in terms of quality is being met. Managing the quality involves planning, establishing a workflow for fulfilling,
Quality Planning (QP) is a framework which specifies quality standards, practices, resources, and the sequence of activities The quality plan should define:[1] Objectives to be achieved A workflow that represents
Quality control indicates an operational activity within the process, while quality assurance focuses on constructing confidence that quality requirements will be met. Quality is incorporated into production and verified during
The ISO 19650 framework is generally aimed for information management. The individual standards do not cover the whole area of quality management but instead point out to other standards suggesting
Quality management systems Requirements ISO 9001 is a set of quality management principles defined by various criteria and standards. It outlines the importance of defining a quality management system (QMS)
Information technology – Security techniques – Information security management systems – Overview and vocabulary ISO 27000 is derived from the British Standard 7799, published in 1995 in three parts: BS-7799,
Asset management Overview principles and terminology The ISO 55000 standard integrates with other essential management systems by outlining definitions and terminologies for asset management. Published under the International Organization for
Guidance on project management ISO 21500 describes guidelines for managing projects and processes in project management, including standards, methods, and processes. The standard is intended to align with related international
Risk management guidelines ISO 31000 is an international standard first published in 2009, the current version published in 2018. The standard contains principles and guidelines for effective risk management. It
Facility management Management systems Requirements with guidance for use ISO 41001 and the vocabulary published as ISO 41011 is a Facilities Management Standard developed by the International Organizational Standards (ISO)
Data quality Part 2: Vocabulary ISO 8000 is an emerging technology standard for organizations that want to improve business processes and control operating costs throughout the product life cycle from
a measure of an organisation’s readiness and capability expressed through its people, workflows, information, technologies and the reliable measurement procedures that are in place [source: Understanding Organizational Maturity
Potential and expertise suggesting ability. Capability implies an organisation’s capacity to engage in a range of constructive activities Organisational capability is also referred to as organisational competence, although a capability refers to the
adjective In Architecture Engineering and Construction (AEC), complete information is information which includes all the necessary and typical parts or elements, lacking nothing. For the information to be deemed complete,