data sheet

data template that is populated PAS 14191:2020

Permitted Purpose

A submittal state defining the intent or suitability. Permitted Purpose means any purpose related to the Works (and/or (without limitation) the construction, refurbishment, extension, operation, management and/or maintenance of the Works) which is consistent with:(a) the applicable Level of Information Need of the relevant Material;(b) the applicable status code of the Material and the information […]

Approval

A state used to approve information for the permitted-purpose

Leadership in Energy and Environmental Design

An internationally recognized green building certification system confirms the level of the sustainability performance of an asset.  Confirming the level at which the asset was designed and built using strategies aimed at improving performance across all the metrics that matter most: energy savings, water efficiency, CO2 emissions reduction, improved indoor environmental quality, availability of resources and […]

Required Standard

means the level of skill and care applicable to the Party’s equivalent obligation under the Appointment. [1] [1] UK BIM Framework, 2020. Information protocol to support BS EN ISO 19650-2 the delivery phase of assets.

Conditions of Satisfaction

An explicit description by a Customer of all the actual requirements that must be satisfied by the Performer in order for the Customer to feel that he or she received exactly what was wanted.1 1 The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and Horizontal Construction.

Existing Conditions Modeling

A process of developing a 3D model of the existing conditions for an asset, or a specific area within a facility.The model can be developed based on laser scanning surveys (point cloud scans) or conventional surveying techniques. Objective: Increase quality of design with accurate representation of existing conditions such as existing assets & topography. Increase […]

Supporting Information

Supporting information shall be used where applicable and relevant to fully understand and evaluate information requirements or acceptance criteria. Supporting information includes but is not limited to: Existing site surveys Existing information containers Shared resources [source] PDE 4301 Technical BIM Management 2019/2020, EXCHANGE INFORMATION REQUIREMENTS, SUP-MDX-XX-XX-SP-K-0001, Appointing Party EIR, Grat To King Yeung, Jarek Wityk, […]

Risk management

Risk management provides an overview of using risk analysis as an organized method for identifying and measuring risks. How to effectively assemble and manage a project team and effectively assemble project teams in the context of risk management and project planning. [1] The key in risk management is the ability to analyse potential risks to […]