A state used to approve information for the permitted-purpose
A state used to approve information for the permitted-purpose
A submittal state defining the intent or suitability. Permitted Purpose

UK electrical and fire safety standards do not prescribe a fixed minimum separation distance for roof-mounted life-safety cable trays. However, BS 7671, BS 8519, and BS 5839 collectively establish that life-safety circuits must be installed on dedicated containment and be either separated by barriers or adequately distanced to ensure circuit independence.

ELI5-S1: BIM Basics E7: OIR explained information requirements in relation


2 responses
IS MPDT (Model Production and Delivery Table) tailored for a high end residential project is Available?
An MPDT its old PAS 1192 term, the MPDT defines who produces what, when and to what level of detail.
The recent publication of ISO 19650 standards does not include the term. The situation does introduce a level of confusion as some think that MPDT is now called the Responsibility Matrix in ISO. “High-Level Responsibility Matrix” Client-side RACI Matrix. However, we can see a need for contractor-side RACI too and therefore suggest to use Digital Plan Of Work (dPoW) and RACI to replace the superseded MPDT. Check this out: https://projectdesign.io/model-production-delivery-table-mpdt/