Explore The Ultimate BIM Knowledge Hub
Your one-stop resource for BIM management and integration expertise.
CONTENT
racetrack
Information delivery cycle It is a term introduced first in PAS 1192 and updated in ISO 19650 framework, it depicts the process of specifying and

Delivery Team context of information exchange
ELI5-S2 BIM in Practice E3 Delivery Team context of information exchange ELI5-S2: BIM in Practice E3: Delivery Team context of information exchange explained Understanding the
Max Zs
Themaximum value of earth fault loop impedance (Zs) that will allow the protective device in a circuit to disconnect an earth fault within the prescribed

BS EN ISO 19650-2 UK National Annex (NA) 2021 status and suitability reference table
BS EN ISO 19650-2 2018, NA 02/2021 Status Code Suitability Action by Information State (at any project stage): Work in progress (WIP) S0 Information developed
Additive manufacturing
Additive manufacturing (AM), also known as 3D printing, is the process of creating products by layering materials until a complete 3D object is created. The
BS 7000-10:2008
Design management systems Part 10: Vocabulary of terms used in design management
pre-design process
construction process (3.3.2) determining construction properties (3.5.1) for the built environment (3.1.7) before it is designed[1] 1 Online Browsing Platform (OBP) [WWW Document], n.d. URL https://www.iso.org/obp/ui#search (accessed 4.10.21).
Project delivery team
In respect of asset lifetime PAS 1192-2:2013, describes one project delivery team, the term is connected with word ‘contract’ meaning one or many companies or
Quantity Surveyor (QS)
person who provides financial and contractual advice and services for planning, carrying out and completion (3.5.23) of construction works https://www.iso.org/obp/ui#iso:std:iso:6707:-2:ed-3:v1:en:term:3.8.25

Emergency Voice Communication System (EVCS)
An Emergency Voice Communication System (EVCS) or (EVC) is a fixed, monitored and maintained, bidirectional, full duplex voice communication system (Refuge system) designed to facilitate
Lean Project Delivery System
An organized implementation of Lean Principles and Tools combined to allow a team to operate in unison.[1] [1] The Massachusetts Port Authority, 2015. BIM Guidelines

VEAM connector
VEAM connectors refer to a specific type of electrical bayonet type connectors known for their robustness and reliability in harsh environmental conditions. These connectors are
exchange requirement (ER)
defined set of information units that needs to be exchanged to support a particular business requirementat a particular process phase (or phases)/stage (or stages) BS
engineer
a person who designs and superintends the carrying out of civil engineering works, structures of buildings, installation of services, or who maintains such civil engineering works, structures or services https://www.iso.org/obp/ui#iso:std:iso:6707:-2:ed-3:v1:en:term:3.8.25
Budget
The tender response for designing, constructing and operating the existing building and the additional extension shall include the project budget’s bid documentation. The budget must
Conformity Assessment Committee (CASCO)
Committee whose secretariat is provided by ISO/CS that deals with conformity assessment and is responsible for the development of conformity assessment standards. https://www.iso.org/glossary.html

BIM Levels
The transition from the BIM Levels to the concepts in the ISO 19650 series and the UK BIM Framework represents a shift in how we

Wiring in Protected Escape Route
Introduction Compliance with fire safety regulations in Firefighting Cores is not just about passing inspections – it directly affects life safety and emergency response. This

Organizational Drivers
ELI5-S1: BIM Basics E14: Organizational Driver Understanding the Organizational Driver in BIM Information Exchange In this post, we introduce a new term: the Organizational Driver,