BIM Execution Plan (BEP)
The purpose of the BIM Execution Plan (BEP) is to clearly define the actions required of each member of the project team in order to
Semantic Web
The Semantic Web, as defined by Ontotext[1] is the extension of the existing information and data on a network (or Web) to include data descriptors,
Project Committee (PC)
a Project Committee (PC), which is created to develop one standard, after which it is disbanded. https://www.iso.org/glossary.html
National BIM Standard
National BIM Standard (NBIMS) – United States Version 2 is sponsored by National Institute of Building Sciences (NIBS) under its BuildingSMART Alliance Council. [1] [1]
4D Modeling
4D Modelling also referred to as 4D BIM, when supported by existing planning techniques, can improve project delivery times and schedules. To make the gains
major change
change that affects the meaning, function or intended useNOTE Definition applies to properties and groups of properties.PAS 14191:2020
Resources Description Framework (RDF)
Resources Description Framework (RDF) major component of the semantic web as they provide a means for identifying resources with Namespace (NS)
process
set of interrelated or interacting activities that transforms inputs into outputs [SOURCE: ISO 9000:2005, definition 3.4.1 (without notes)] ISO 14040:2006(en), 3.11 It is a PAS1192 term replaced
DWG
DWG (“drawing format”) is a binary file format licensed by Autodesk and used for storing two and limited three-dimensional design data and metadata. It is
BS EN ISO 16739-1:2020
Industry Foundation Classes (IFC) for data sharing in the construction and facility management industries Part 1: Data schema
k Factor
Factors for conductor materials from BS7671:2018,Table43.1. Different values are given for different types of conductor and insulatingmaterials. k2s2 used in adiabatic calculations gives the short-time

Insurance Backed Alliancing projects under the IPI model
Introduction Martin Davis member of the New Models of Construction Procurement (NMCP) Working Group and the Integrated Project Insurance (IPI) mentor describes the Integrated Project
BS 11000‑2:2017
Collaborative business relationship management systemsPart 2: Guide to implementing BS ISO 44001

Information Interoperability
Information overload What makes construction management so challenging is the sheer amount of information available, the volume of the data means that we are often
BS EN ISO 19650-2:2018
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) — Information management using building information modelling Part 2:
Intermediate Event
An intermediate event is something that occurs between the beginning and end of a process. Triggers can be “caught” or “thrown” by intermediate events. [1]
Start Event
A start event specifies where a process will begin. Start events can only react when a trigger is “caught.” Symbol 9). BPMN Method and Style:
BS EN ISO 29481-2:2016
Building information models — Information delivery manual Part 2: Interaction framework
Tier 3
In the construction industry, Tier 3 is a sub-contractor referred in ISO 19650 as the Appointed party and Task Team, with a sub-contract who provides