Description
The whole service intake position in one family. The cut-out is a replica of the Lucy Electric three phase cut-out (Lucy Electric, three phase cut-outs), fixed to a backboard together with the meter and the isolator. Overall dimensions follow typical DNO requirements, so the space claim is right at the first coordination pass, not after the DNO turns up.
Rating: 100 A TPN, 230/400 V, three phase, 4 wires.
Key features
Replica cut-out. Modelled on the Lucy Electric three phase cut-out, with fuse carriers and neutral block.
Complete intake board. Backboard, meter, cut-out and isolator arranged as installed. One placement covers the whole intake position.
Backboard extends to floor and ceiling. Toggled per instance, for the full height board arrangement.
Instance clearance zone. The working space in front of the equipment, modelled as a volume and switched on or off per instance for coordination and clash detection.
Feed through and subfeed lug options. Toggled per instance.
Height, type and rating note labels. Switched on or off per instance.
COBie parameters. Included and pre-configured.
Level or face hosted. Places on a reference level. No host wall required.









Reviews
There are no reviews yet.