acceptance criteria
evidence required for considering that requirements have been fulfilled [cited from ISO 19650-2:2018(en), 3.1.1.1] Information issued via the Common Data Environment (CDE) must comply with
evidence required for considering that requirements have been fulfilled [cited from ISO 19650-2:2018(en), 3.1.1.1] Information issued via the Common Data Environment (CDE) must comply with
An identifiable chunk of work with recognized prerequisites to begin and a recognized State of Completion – or Conditions of Satisfaction. Another way to look
A task is an atomic activity that is part of a process. When the work in the process is not broken down to a finer
person, organization or organizational unit involved in a construction process [cited from ISO 19650-1:2018(en), 3.2.1]
AD HOC GROUP (AHG) Group set up within a committee to look into a particular problem and report back to the parent committee at a meeting.
Additive manufacturing (AM), also known as 3D printing, is the process of creating products by layering materials until a complete 3D object is created. The
Adiabatic checks are required to determine whether conductorsmight be damaged by the thermal effects resulting from the level of calculated fault conditions.
…’An agent is just something that acts (agent comes from the Latin agree, to do). Of course, all computer programs do something, but computer agents
The temperature of the free air surrounding a cable,or in the case of cables installed in the ground, the temperature of the surrounding soil.For an
Ambient temperature rating factor used for calculating theminimum required cable size. For cables installed in air, values for this factor are given in BS7671:2018 Table4B1.For
American Society of Heating, Refrigerating, and Air Conditioning Engineers (ASHRAE) is a professional organization that develops and promulgates system, measurement, and product engineering standards to
The appointed party term introduced in BS EN ISO 19650 it is meant to replace PAS 1192 term ‘Supplier’ Typically it means Tier 2 and
ELI5-S2: BIM in Practice E6: Appointed Party context of information exchange Understanding the Appointed Party (T2-T4) Context of Information Exchange in BIM Welcome to the
UK BIM Alliance responding to the inconsistency between current guidance of CIC BIM Protocol, Second Edition 2018 and ISO 19650 Framework published updated Information
Appointing party term introduced in BS EN ISO 19650 it is meant to replace PAS 1192 term ‘Employer’ ISO 19650 term depends on where in
ELI5-S2: BIM in Practice E4: Appointing Party context of information exchange Understanding the Appointing Party (T0) Context of Information Exchange in BIM Welcome to the
Equivalent to PAS1192 term ‘Contract’ The more generic term appointment has been used in ISO 19650 instead of contract. This means one term can be
UK BIM Alliance responding to the inconsistency between current guidance of CIC BIM Protocol, Second Edition 2018 and ISO 19650 Framework published updated Information
The meaning of the term Industry 4.0 has not been concluded. There is a level of ambiguity of what it means for the construction industry[1]
Architecture, Engineering, Construction and Operation usually expressed as acronym AECO is an extension of the Architecture, Engineering, Construction (AEC). Both terms are related to the
History of project information, such that any non-current published information in the published area should move into this area. New parties to the project will
area of an expert’s […] proficiency and knowledge associated to one or several groups of properties BS EN ISO 23386:2020
Model(s) based on Fabrication Shop Model(s) and installed conditions.1 1 1 The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and Horizontal Construction.
An asset is anything that has potential or actual value, whether a resource or a value that can be converted into capital. An organisation or
The Asset Information Model or AIM is a term used to define the set of information gathered from all sources that support the continuing management
Term introduced by ISO 19650 set of standards is related to information required during the operation phase of an asset AIR define managerial, commercial and
coordinated activity of an organization to realize value from assets Note 1 to entry: Realization of value will normally involve a balancing of costs, risks,
A request or offer resulting in a Reliable Promise and is ready to be placed on the Weekly Work Plan (WWP) for performance. An assignment
Responsibility matrix [ISO19650] In ISO 19650 there is a principle to develop responsibility matrices to cover information management activities and information delivery. Responsibility matrix [PAS1192]
An association is used to link data and artefacts to flow objects. Non-flow objects, such as text and graphics, can be associated with flow objects
Association Française de Normalisation Asociation French Normalization Organization Regulation
Depending on the technology discussed, the term attribute can be treated as equivalent to a property or as a set of attributes, such as the
individual or multiple buildings (e.g. a site or campus) or infrastructure (e.g. roads, railways, pipelines, dams, docks, etc.) built as part of a construction project
Heating, Ventilation and Air-Conditioning (HVAC). All necessary heating, ventilation air-conditioning and specialty equipment, including air distribution ducts for supply, return, and ventilation and exhaust ducts,
A physical asset is an item of economic, commercial, or exchange value that has a material existence.Physical assets are also known as tangible assets.For most
A spacial asset can be defined as a specific location such as a zone, boundary, area, floor or room with a known location and extents.For
term coined by Deloitte[1], it is a current situation where whilst businesses conceptually understand the significant changes that information Management (IM) and technology may bring,