Assignment

A request or offer resulting in a Reliable Promise and is ready to be placed on the Weekly Work Plan (WWP) for performance. An assignment must meet the characteristics for

Read More »

Construction Manager at Risk

Various key characteristics of CM@Risk include: there are separate contracts for design services and for construction services; the contract for construction services may be entered into at the same time

Read More »

Co-Location

Assembling the entire BIM design and construction team in a single location (“Co-location”) enables almost instant and direct communication and coordination among team members. This Co-location of all team members

Read More »

Commissioning

A building has successfully gone through the commissioning process when its equipment and systems have been examined and tested to perform as designed, and its operators have been trained to

Read More »

Conditions of Satisfaction

An explicit description by a Customer of all the actual requirements that must be satisfied by the Performer in order for the Customer to feel that he or she received

Read More »

Design-Bid-Build

A contract type There is a sequential award of two separate contracts; the first contract is for design services; the second contract is for construction; design and construction of the

Read More »

Design Build

A contract type used in construction, typical characteristics: There is a single contract for design services and construction services; design and construction of the project may be in sequential phases

Read More »

Design Web Format

Design Web Format (DWF), created by Autodesk. DWF is a compressed, non-editable, vector file format created by CAD and BIM applications. A DWF file can represent sheets for plotting purposes

Read More »

DWG

DWG (“drawing format”) is a binary file format licensed by Autodesk and used for storing two and limited three-dimensional design data and metadata. It is the native format for several

Read More »

Fabrication Model

Digital Model(s) created from shop drawings to support fabrication and installation. Fabrication models are reviewed and approved by the A/E for conformance to design specifications.1 1 The Massachusetts Port Authority,

Read More »

Facility Lifecycle

This refers to the time span stretching from a building’s conception to demolition including the five distinctive phases (Planning, Design, Construction, Operations, and Disposition).1 1 The Massachusetts Port Authority, 2015.

Read More »

Geo-referencing

A BIM is said to be geo-referenced when the BIM is located with respect to one of the standard geographic survey coordinate grids established to represent locations on the Earth’s

Read More »

Integrated Project Delivery

Integrated Project Delivery (IPD) is a collaboration of all parties, systems and practices to optimize and maximize project success. Defined by the American Institute of Architects, IPD is typically applied

Read More »

Integrated Workplace Management System

Integrated Workplace Management System. Such systems incorporate powerful database capabilities to capture enterprise-level functions and serve as decision support tools at all organizational levels and throughout the whole building lifecycle.

Read More »

Last Planner®

The person or group that makes assignments to direct workers. Project Architect and ‘discipline lead’ are common names for last planners in design processes. ‘Superintendent’ or ‘foremen’ are common names

Read More »

Last Planner System®

The collaborative, commitment-based planning system that integrates “should-canwill-did planning” (pull planning, make-ready look-ahead planning with constraint analysis, weekly work planning based upon reliable promises, and learning based upon analysis of

Read More »

Lean Project Delivery System

An organized implementation of Lean Principles and Tools combined to allow a team to operate in unison.[1] [1] The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and Horizontal Construction.

Read More »

Look Ahead Plan

A short interval plan, based on the pull/phase plan, that identifies all the activities to be performed in the next 6 (or other) weeks. The 6W Look-Ahead Schedule (LAS) is

Read More »

Master Schedule

The purpose of a project schedule is to define how the project should be delivered and maintained based on the available resources. The development of a timetable is the first

Read More »

National BIM Standard

National BIM Standard (NBIMS) – United States Version 2 is sponsored by National Institute of Building Sciences (NIBS) under its BuildingSMART Alliance Council. [1] [1] The Massachusetts Port Authority, 2015.

Read More »

NWC

NWC is a cache file. “When you open a CAD file in Navisworks, by default, a corresponding cache file (NWC) is created, which contains all of the conversion details required

Read More »

NWD

NWD designates the published version of a Navisworks file with all loaded models, viewpoints, redlines, and comments saved to a single file. This file type can be opened with any

Read More »

Navisworks file format (NWF)

When saving to a “Navisworks file format (NWF), only a list with pointers to the files currently loaded is saved, along with the scene’s environment, the current view, clash results,

Read More »

Value

What the customer wants from the process, and will pay for. [1] [1] The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and Horizontal Construction.

Read More »

Value Stream

Includes all the processes and activities used to design, produce and deliver the product or service to the Customer.[1] [1] The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and

Read More »

Value Stream Mapping

A diagram of every step involved in the material and information flows needed to bring a product from request to delivery. [1] [1] The Massachusetts Port Authority, 2015. BIM Guidelines

Read More »

Virtual Design and Construction

Virtual Design and Construction (VDC) is the use of design models and project information to apply construction processes in a virtual environment to reduce time, cost, and ensure design intent.

Read More »

Waste

The opposite of value. There are eight basic types of waste: motion waiting transportation of goods over-processing under utilization overproduction inventory defects [1] [1] The Massachusetts Port Authority, 2015. BIM

Read More »

BIM Use

A Use Case is a description of an intended use of the BIM, along with a description of the type(s) of data that must be in the BIM in order

Read More »