Post-appointment BEP
Post-appointment BEP confirms and defines the delivery team’s approach to information management in the appointed project. It is a BIM Execution Plan (BEP) which shall be re-submitted by the Lead Appointed Party and confirmed by the Task Team and the Appointing Party to demonstrate understanding, agreement and committed to the Exchange Information Requirements. It should […]
Appointor
UK BIM Alliance responding to the inconsistency between current guidance of CIC BIM Protocol, Second Edition 2018 and ISO 19650 Framework published updated Information protocol to support BS EN ISO 19650-2 the delivery phase of assets (Framework). The publication recognized the need for incorporation of new terms used in contract law, namely : ‘Appointor’ […]
Appointee
UK BIM Alliance responding to the inconsistency between current guidance of CIC BIM Protocol, Second Edition 2018 and ISO 19650 Framework published updated Information protocol to support BS EN ISO 19650-2 the delivery phase of assets (Framework). The publication recognized the need for incorporation of new terms used in contract law, namely : ‘Appointor’ […]
Sensitive Information
ELI5-S1 BIM Basics E16_Sensitive Information information, the loss, misuse or modification of which, or unauthorized access to, could:(a) adversely affect the privacy, welfare or safety of an individual or individuals;(b) compromise intellectual property or trade secrets of an organization;(c) cause commercial or economic harm to an organization or country; and/or(d) jeopardize the security, internal and […]
Federated Information Model
Computer science and IT In the fields of computer science and information technology, a federated information model refers to a structure where data is stored across multiple independent systems but can be accessed and queried as if it were in a single database. Each system retains its autonomy and control over its data, but it cooperates […]
security breach
infraction or violation of security (3.7) [1] 1 Online Browsing Platform (OBP) [WWW Document], n.d. URL https://www.iso.org/obp/ui#search (accessed 4.10.21).
National Annex (NA)
With reference to BS EN ISO 19650 Framework, the working group could not conclude on international codification and standardised conventions. Hence Paul Shillcock and David Churcher, the lead authors, came up with an idea to include a National Annex (NA) in the international standards to allow for regional flexibility and use of local standards already […]
Project Implementation Plan (PIP)
The Project Implementation Plan (PIP) it is a PAS 1192 term that should assist in establishing of the supply chain’s capability. In summary, it consists of the supplier’s: BIM assessment form(s), the supplier information technology assessment form(s) and the supplier resource assessment form(s). In ISO 19650 Framework does not include an equivalent combined term for […]
Master Information Delivery Plan (MIDP)
The Master Information Delivery Plan (MIDP) is the primary plan for the preparation of project information (from the supplier’s perspective), which is set out as being required in the Exchange Information Requirements (EIR). The MIDP is produced from the aggregation of all applicable delivery teamsTIDP’s. The MIDP lists information deliverables with dates (data drops – […]
Information Protocol
The First Edition of the Building Information Model (BIM) Protocol published in 2013 identifies and puts into place specific obligations, liabilities and associated limitations on the use of the Building Information Models, unfortunately at the first version of the protocol did not contain any specific framework for Cyber Security. In May 2015 British Standard Institution […]