An electronic, three-dimensional representation of built asset or facility elements with associated intelligentattribute data (“Facility Data”). A Model term used in PAS 1192 specification has been replaced by term ‘Information
One or more specific information exchange requirements may necessitate the need for a model view definition (MVD). A machine-readable representation of MVDs is required when using them in software development.
Building information models – Information delivery manual Part 1: Methodology and format
Building information models — Information delivery manual Part 2: Interaction framework
defined set of information units that needs to be exchanged to support a particular business requirementat a particular process phase (or phases)/stage (or stages) BS EN ISO 29481-1:2017
a formal description of the rules with which an interaction framework must comply[1] 1 Online Browsing Platform (OBP) [WWW Document], n.d. URL https://www.iso.org/obp/ui#search (accessed 4.10.21).
algorithm that generates an interaction schema from an interaction framework, interaction framework schema, and templates file as input [1] 1 Online Browsing Platform (OBP) [WWW Document], n.d. URL https://www.iso.org/obp/ui#search (accessed
VISI acronym for Dutch standard for communication between partners in construction projects translates as Creating conditions for the implementation of ICT standardization for the construction industry [1] 1 Online Browsing
Business Process Modelling Notation (BPMN) is a flow chart method for modelling the steps of a planned business process from beginning to end. It is a critical component of Business
A task is an atomic activity that is part of a process. When the work in the process is not broken down to a finer level of process detail, a
A sub-process is a group of activities that are performed as part of a larger process or choreography. It is compound in the sense that it can be broken down
The sub-process boundary is expanded, and the details (a process) are visible within it. It is important to note that sequence flows cannot cross the boundary of a sub-process.[1] Symbol
The diagram does not show the details of the sub-process. A “plus” sign in the shape’s lower-left corner indicates that the activity is a sub-process with a lower level of
A start event specifies where a process will begin. Start events can only react when a trigger is “caught.” Symbol 9). BPMN Method and Style: A levels-based methodology for BPM
An intermediate event is something that occurs between the beginning and end of a process. Triggers can be “caught” or “thrown” by intermediate events. [1] Symbol 1] Silver, B. (2009).
An end event denotes the point at which a process’s path will come to an end. End events can only result in a “throw” of a result.[1] Symbol 1] Silver,
A message is received from a participant, which initiates the process. The actual recipient of the message can be identified by connecting the event to a participant via a message
A message intermediate event can be used to both send and receive messages. When used to “catch” the message, the event marker must be left empty. If the process was
A message intermediate event can be used to both send and receive messages. The event marker must be filled when used to “throw” the message (see the upper figure on
At the end of the process, this type of end indicates that a message is sent to a participant.[1] Symbol N Method and Style: A levels-based methodology for BPM process
Paired link events can also be used as “off-page connectors” in order to print a process across multiple pages. Within the process level, they can also be used as generic
A gateway is a device that controls the divergence and convergence of sequence flows in a process or choreography. As a result, it will determine path branching, forking, merging, and
[XOR] When splitting, directs the sequence flow to one of the outgoing branches. When merging, it waits for one incoming branch to finish before starting the outgoing flow.[1] Symbol
[And] When used to split the sequence flow, all outgoing branches are activated at the same time. When parallel branches are merged, it waits for all incoming branches to complete
[Or] When a branch splits, one or more branches are activated. Before merging, all active incoming branches must be completed.[1] Symbol 1] Silver, B. (2009). BPMN Method and Style: A
A sequence flow is used to show the order in which activities in a process or choreography will be performed.[1] Symbol 1] Silver, B. (2009). BPMN Method and Style: A
A message flow depicts the exchange of messages between two participants who are ready to send and receive them. A message flow must connect two distinct pools. They are either
An association is used to link data and artefacts to flow objects. Non-flow objects, such as text and graphics, can be associated with flow objects and flow.[1] Symbol [1] Silver,
A data association is used to move data between data objects, properties, and activity and process inputs and outputs. The association connector style can be used to visually represent data
A pool is a graphical representation of a collaboration participant. A pool serves as a container for the sequence flows that occur between activities (of a contained process). The sequence