alternative or supplementary electrical energy sources has become more viable, typical secondary power supply (SPS) Photovoltaic (PV) power Wind turbine power standby generator
results to be achieved The objective can be strategic or operational; it can relate to different disciplines such as financial, health and safety, or environmental. The targeted results can be
An asset is anything that has potential or actual value, whether a resource or a value that can be converted into capital. An organisation or individual expects the asset to
Distributed Ledger Technology (DLT) is an encrypted and distributed database that serves as a register for storing records of transactions. At the core of DLT is a data model that
The blockchain is a transaction database shared by all nodes involved in the system based on the Bitcoin protocol. It is a data structure consisting of linked blocks (e.g. confirmed
confirmation, through the provision of objective evidence, that specified requirements have beenfulfilled [SOURCE: BS EN 17412‑1:2020] Verification is the process of checking that the product/service meets the specification, it will
confirmation, through the provision of objective evidence, that the requirements for a specific intendeduse or application have been fulfilled [SOURCE: BS EN 17412‑1:2020] For example, it is the process of
Additive manufacturing (AM), also known as 3D printing, is the process of creating products by layering materials until a complete 3D object is created. The process can transform digital design
A unified cloud platform (UCP) has been introduced to facilitate the integration of multiple cloud services into a single cloud environment. The UCP is essentially a cloud management multi-platform that
reinterpretable representation of data in a formalized manner suitable for communication, interpretation or processing [cited from ISO 19650-1:2018(en), 3.3.1]
person or group of people who directs and controls an organization at the highest level [cited from ISO 19650-5:2020(en), 3.14]
person, organization or organizational unit involved in a construction process [cited from ISO 19650-1:2018(en), 3.2.1]
An Emergency Voice Communication System (EVCS) or (EVC) is a fixed, monitored and maintained, bidirectional, full duplex voice communication system (Refuge system) designed to facilitate the orderly evacuation of disabled
Info Below you can find a couple of sample notes intended to be copied and pasted to a transmittal when sharing Restricted and Highly Restricted information. Restricted Information This transmittal
actor (3.2.1) responsible for initiating a project and approving the brief [cited from ISO 19650-1:2018(en), 3.2.5] The UK BIM Alliance, responding to the inconsistency between the current guidance of CIC BIM Protocol,
a measure of ability to perform and function [cited from ISO 19650-1:2018(en), 3.3.18]
part of the life cycle (3.2.10), during which an asset (3.2.8) is designed, constructed and commissioned [cited from ISO 19650-1:2018(en), 3.2.11] ISO 19650-2:2018 Standard dedicated to the delivery phase
amount and type of risk that an organization is willing to pursue or retain [cited from ISO 19650-5:2020(en), 3.5]
schedule of information containers and delivery dates, for a specific task team [cited from ISO 19650-2:2018(en), 3.1.3.4] The Task Information Delivery Plan (TIDP) is defined by the ISO 19650 framework
a planned or unplanned event that changes an asset (3.2.8) or it’s status during its life cycle (3.2.10), which results in information exchange (3.3.7) [cited from ISO 19650-1:2018(en), 3.2.13]
state of relative freedom from threat (3.13) or harm caused by deliberate, unwanted, hostile or malicious acts [cited from ISO 19650-5:2020(en), 3.7]
It is a project-specific “digitally checkable” framework set-up to ensure that the deliverables of all contributors are identified and appropriate to the decisions required at each work stage. The plan
The information needed to support a business or other activity. specification for what, when, how and for whom information (3.3.1) is to be produced [cited from ISO 19650-1:2018(en), 3.3.2] Term directly related to:
scheduled event for a predefined information exchange [cited from ISO 19650-2:2018(en), 3.1.3.2] Milestones act as signposts through the course of a project. An information delivery milestone is a point in
weakness that can be exploited to cause harm [cited from ISO 19650-5:2020(en), 3.15]
In AEC industry with reference to information systems management, the single source of truth refers to Common Data Environment (CDE) The single source of truth is a method of structuring
correlation between the outcome and the resources used a measure of the utilization of resources to realize a given objective Note 1 to entry: An activity is efficient if it minimizes
Quality assurance (QA) is the action or process of verification that a requirement in terms of quality is being met. Managing the quality involves planning, establishing a workflow for fulfilling,
Quality Planning (QP) is a framework which specifies quality standards, practices, resources, and the sequence of activities The quality plan should define:[1] Objectives to be achieved A workflow that represents
Quality control indicates an operational activity within the process, while quality assurance focuses on constructing confidence that quality requirements will be met. Quality is incorporated into production and verified during