suitability
degree to which a product, system or information provides functions that meet stated and implied needs when used under specified conditions [cited from: ISO/IEC 25010:2011(en),
degree to which a product, system or information provides functions that meet stated and implied needs when used under specified conditions [cited from: ISO/IEC 25010:2011(en),
In the construction industry, ‘supplier’ refers to a provider of services or goods. The supplier can provide goods or services directly to the ultimate client
The appointed party term introduced in BS EN ISO 19650 it is meant to replace PAS 1192 term ‘Supplier’ Typically it means Tier 2 and
ELI5-S1: BIM Basics E10: Volume Strategy (spatial) explained Introduction Volume Strategy enables information management, spatial coordination, and concurrent engineering, ultimately fitting together like a complex
set of interrelated or interacting activities that transforms inputs into outputs [SOURCE: ISO 9000:2005, definition 3.4.1 (without notes)] ISO 14040:2006(en), 3.11 It is a PAS1192 term replaced
The term ‘workflow’ is used in ISO 19650 instead of the PAS 1192 term ‘process’.
The term naming in PAS 1192 is related to information container naming strategy, in ISO 19650 the therm is replaced by term ‘identification’ meaning remains
The “identification” is ISO 19650 term equivalent to PAS 1192 term ‘naming’
Information delivery cycle It is a term introduced first in PAS 1192 and updated in ISO 19650 framework, it depicts the process of specifying and
It is a term introduced first in PAS 1192 and updated in ISO 19650 framework, it depicts the process of specifying and delivery of project