Trigger Event
Trigger Events are the occurrences during the life of an asset that causes new or updated information to be required.There are two types of trigger
Trigger Events are the occurrences during the life of an asset that causes new or updated information to be required.There are two types of trigger
A physical asset is an item of economic, commercial, or exchange value that has a material existence.Physical assets are also known as tangible assets.For most
A spacial asset can be defined as a specific location such as a zone, boundary, area, floor or room with a known location and extents.For
A process of developing a 3D model of the existing conditions for an asset, or a specific area within a facility.The model can be developed
A Product Data Definition (PDD) document intended to provide a consistent methodology for the definition, creation, management and sharing of product information throughout the life
The latest message related to PAS 1192-7 is a tweet from Paul Surin is that PAS1192-7 confirming that CPNI and BSI have agreed to cease
Project Information standards shall be covered within the BIM Execution Plan (BEP). Standards In line with BIM Goals and Uses to ensure continuity that information
Supporting information shall be used where applicable and relevant to fully understand and evaluate information requirements or acceptance criteria. Supporting information includes but is not
Objectives of BEP shall be allignwed with Exchange Information Requirements (EIR), an example of Strategic Objectives for a project have been listed below: Meet Level
Responsible for project strategic direction from the tender stage, guides project set up and advises on the project when needed. Typical Lead Appointed Party BIM