4D Modeling

4D Modelling also referred to as 4D BIM, when supported by existing planning techniques, can improve project delivery times and schedules. To make the gains possible, all project members must

Read More »

Workset

A workset is a collection of elements in a work shared Revit project. The purpose of worksets is to enable multiple users to work on the same project and facilitate

Read More »

Periodic Model Quality Control Checks

Apart from the weekly model coordination effort that focuses on spatial coordination and clash resolution, the Appointment BIM Manager should review all disciplines project models and ensure compliance with BEP

Read More »

Information Protocol

The First Edition of the Building Information Model (BIM) Protocol published in 2013 identifies and puts into place specific obligations, liabilities and associated limitations on the use of the Building

Read More »

Stage 2 Maturity

BIM at Maturity Stage 2 according to the ISO 19650 Framework is “the use of a shared digital representation of a built asset to facilitate design, construction and operation workflows

Read More »

Pre-appointment BEP

Pre-appointment BEPs communicates the delivery team’s intended approach to the information management process in the project, it is submitted as part of the prospective Lead Appointed Party tender response. For

Read More »
Dictionary
Jarek Wityk

BIM Functions

ELI5-S1 BIM Basics E17_BIM Functions Understanding BIM Functions: A Simple Guide for Beginners Building Information Modeling (BIM) is transforming the construction industry by enabling better collaboration, design precision, and efficient

Read More »

Scope

Bid response should include a scope management plan containing all the tasks necessary for successful project delivery. The plan shall define the implementation and verification of workflows. A project should

Read More »

Budget

The tender response for designing, constructing and operating the existing building and the additional extension shall include the project budget’s bid documentation. The budget must incorporate the total amount of

Read More »

Resources

In the context of project management, the resources refer to optimizing the use of resources for successful project execution and the management of resources in the project. [1] Therefore, the

Read More »

Risk management

Risk management provides an overview of using risk analysis as an organized method for identifying and measuring risks. How to effectively assemble and manage a project team and effectively assemble

Read More »

Project setup

During project setup phase It is essential to establish and analyse a timeline that guides the entire team in delivering the project on time. Thus the prospective Lead Appointed Party

Read More »

Work standards and workflows

Project management focuses on project completion by the execution of various processes. Most of the workflows comprising repetitive tasks can be optimised by applying workflow management systems. Automation-optimized business processes

Read More »

Handover

After the project is completed, the Appointing Party expects to receive Asset Information Model (AIM) compliant with the Exchange Information Requirements (EIR).   The aim is to support the life

Read More »

Lessons learned

Although BS EN ISO 19650-2: 2018 recommend that lessons learned should be captured throughout the entire project, the standard is dedicated for the delivery phase only. Hence project party can

Read More »

tension between hope and ambiguity

term coined by Deloitte[1], it is a current situation where whilst businesses conceptually understand the significant changes that information Management (IM) and technology may bring, they have divergent agendas and

Read More »

Golden thread

The (digital by default) record of predefined documents and building information required to ensure that the original design intent and any subsequent building changes are captured, preserved, and used to

Read More »

UK BIM Framework

The UK BIM Framework was developed by the UK BIM Alliance, BSI, and the Centre for Digital Built Britain associated with the Construction Industry Council (CIC) to implement international BIM

Read More »
Dictionary
Jarek Wityk

lead appointed party

The term introduced by ISO 19650 typically describes the Tier 1 Main Contractor. For example: : The Lead Appointed Party is a specific entity directly appointed (employed) by the primary

Read More »

risk register

means a risk register containing the risks associated with the timely delivery of information as may be identified in the Information Particulars and/or provided in accordance with the Information Standard.

Read More »

model validation checklist

The example checklist consists of checks which assure quality within models and information, to eliminate errors and achieve desired project outcomes. Table 1 – Model Validation Checklist Check Definition Project

Read More »
Dictionary
Jarek Wityk

federation strategy

ELI5-S1: BIM Basics E4: Federation Strategy Explained The purpose of the federation strategy and the Information Container (model) breakdown structure is to help plan the production of information by separate

Read More »

Information Delivery Manual (IDM)

information delivery manual (IDM) Documentation that captures the business process and specifies in detail the information that a user performing a particular role is required to provide at a particular

Read More »