Search filters
Search in title
Search in content
Exact matches only
Filter by Categories
Select all
Academy
AI
Automation
Blog
BPMN
Classification and Standardisation
Common Data Environment (CDE)
Dictionary
Digital Twin
Electrical
Fire
How To
Level of
Management
Organization of information
Procurement
Requirements
Standards
State
Sustainability
Uncategorized

CONTENTS

Final Circuit

A circuit connected directly to current-using equipment, or to a socket-outlets or other outlet points for the connection of such equipment.

Read More »

fragmentation request

A fragmentation request corresponds to the deactivation of the property and the creation of several properties. After validation of the fragmentation request by the experts,

Read More »

framework

structure of processes and specifications designed to support the accomplishment of a specific task[ISO/IEEE 11073-10201:2004, definition 3.22] PD ISO/TS 12911:2012

Read More »
Dictionary
Jarek Wityk

Function

ELI5-S1 BIM Basics E17_BIM Functions Understanding Functions: A Basic Guide In both everyday life and specialised fields like mathematics, computer science, and even construction, the

Read More »

Gateway (Exclusive)

[XOR] When splitting, directs the sequence flow to one of the outgoing branches. When merging, it waits for one incoming branch to finish before starting

Read More »

Gateway (Inclusive)

[Or] When a branch splits, one or more branches are activated. Before merging, all active incoming branches must be completed.[1] Symbol 1]     Silver, B. (2009).

Read More »

Gateway (Parallel)

[And] When used to split the sequence flow, all outgoing branches are activated at the same time. When parallel branches are merged, it waits for

Read More »

Geo-referencing

A BIM is said to be geo-referenced when the BIM is located with respect to one of the standard geographic survey coordinate grids established to

Read More »

geometrical

This is an ISO 19650 term which replaces the PAS1192 term “graphical”. Geometrical is more appropriate to describe spatial positioning and relationships

Read More »

Golden thread

The (digital by default) record of predefined documents and building information required to ensure that the original design intent and any subsequent building changes are

Read More »

graphical

The PAS1192 term has been replaced by ISO19650 term ‘geometrical’ Geometrical is more appropriate to describe spatial positioning and relationships

Read More »

Ground rating factor (Cc)

The rating factor Cc = 0.9 is applied to cable sizing calculations for cables installed in the ground (Installation Methods 70 to 73). See BS7671:2018,Appendix

Read More »

Group

Because a group is not an activity or a flow object, it cannot connect to sequence or message flows. Furthermore, groups are not constrained by

Read More »

Project Design (Building Services)