Key Performance Indicator (KPI)

KPI is an abbreviation for key performance indicator, which is a quantifiable measure of performance over time for a specific goal. KPIs provide goals for teams to aim for, milestones

Read More »

Operations and Maintenance (O&M)

Describes the functions, duties, and labour associated with the operations of an asset, including repairs, replacement of parts and structural components, and other activities needed to maintain an asset.

Read More »

Portable document format (PDF)

It’s a versatile file format developed by Adobe that allows people to easily present and exchange documents – regardless of the software, hardware, or operating systems used by anyone who

Read More »

Project Information Model (PIM)

It is a term introduced in PAS 1192‑2: 2013 and ISO 19650 set of standards. It means any graphical or non-graphical information such as: Structured information, i.e.: schedules, costing and

Read More »

Geographic Information System (GIS)

A geographic information system (GIS) is a framework for gathering, managing, and analyzing data. Rooted in the science of geography, GIS integrates many types of data. It analyzes spatial location

Read More »

task team

The term, introduced by ISO 19650, describes a team of people working together on a specific task. task team might be an individual appointed party, and the appointed party might

Read More »

Tier 2

In the construction industry, Tier 2 is a Contractor referred in ISO 19650 as the Appointed party with a sub-contract who provide goods or services directly to the Lead Appointed

Read More »

Tier 3

In the construction industry, Tier 3 is a sub-contractor referred in ISO 19650 as the Appointed party and Task Team, with a sub-contract who provides goods or services directly to

Read More »
Dictionary
Jarek Wityk

volume

ELI5-S1: BIM Basics E10: Volume Strategy (spatial) explained a term defined by BS 1192:2007 means a spatial subdivision of a project to allow multiple people to work on Project Information

Read More »
Dictionary
Jarek Wityk

Project Team

All parties appointed for the project are defined as members of the Project Team. Each function can be fulfilled by either an individual or multiple people throughout the course of

Read More »

Crown Commercial Services (CCS)

The Crown Commercial Service (CCS) is an administrative agency and trading fund of the Cabinet Office of the UK Government, responsible for the supervision of the procurement of common goods

Read More »

Cost Led Procurement

A procurement method introduced by Constructing Excellence and the Cabinet Office intended to allow industry to use its experience and knowledge to develop innovative solutions through leveraging design, materials, subcontracting, direct labour

Read More »

Integrated Project Insurance (IPI)

The integrated Project Insurance model (IPI) coupled up with Insurance Backed Alliancing is a framework which encourages and empowers project teams to work together. The procurement method introduced by Constructing Excellence

Read More »

Insurance Backed Alliancing

A new procurement method coupled up with Integrated Project Insurance model (IPI) is a framework which encourages and empowers project teams to work together. The procurement method introduced by Constructing Excellence

Read More »

Two Stage Open Book

A procurement method introduced by Constructing Excellence and the Cabinet Office where a client invites prospective integrated teams to bid for a project based on their ability to deliver an outline brief

Read More »

tertiary power source

A Uninterruptible Power Supply (UPS) or standby generator connected to dedicated final circuits of the distribution infrastructure. Enhance the infrastructure resilience and can improve maintenance opportunities and business continuity for

Read More »

secondary power supply (SPS)

alternative or supplementary electrical energy sources has become more viable, typical secondary power supply (SPS) Photovoltaic (PV) power Wind turbine power standby generator

Read More »

objective

results to be achieved The objective can be strategic or operational; it can relate to different disciplines such as financial, health and safety, or environmental. The targeted results can be

Read More »

asset

An asset is anything that has potential or actual value, whether a resource or a value that can be converted into capital. An organisation or individual expects the asset to

Read More »

Distributed Ledger Technology

Distributed Ledger Technology (DLT) is an encrypted and distributed database that serves as a register for storing records of transactions. At the core of DLT is a data model that

Read More »

blockchain

The blockchain is a transaction database shared by all nodes involved in the system based on the Bitcoin protocol. It is a data structure consisting of linked blocks (e.g. confirmed

Read More »

verification

confirmation, through the provision of objective evidence, that specified requirements have beenfulfilled [SOURCE: BS EN 17412‑1:2020] Verification is the process of checking that the product/service meets the specification, it will

Read More »

validation

confirmation, through the provision of objective evidence, that the requirements for a specific intendeduse or application have been fulfilled [SOURCE: BS EN 17412‑1:2020] For example, it is the process of

Read More »

Additive manufacturing

Additive manufacturing (AM), also known as 3D printing, is the process of creating products by layering materials until a complete 3D object is created. The process can transform digital design

Read More »

Unified Cloud Platform (UCP)

A unified cloud platform (UCP) has been introduced to facilitate the integration of multiple cloud services into a single cloud environment. The UCP is essentially a cloud management multi-platform that

Read More »

information

reinterpretable representation of data in a formalized manner suitable for communication, interpretation or processing [cited from ISO 19650-1:2018(en), 3.3.1]

Read More »
On this page

    share this page