Earthing & Bonding - Designer's Decision Process
Earthing & Bonding Selection
Based on BS 7671:2018+A4:2026, IET Guidance Note 8, BS 6701, BS EN 50310 and BS EN 62305-3.
Guidance only. The designer remains responsible for verifying every selection against the project specification and the current edition of BS 7671 and associated standards.
About this tool
The Earthing & Bonding Selection tool is a guided decision aid built for UK electrical designers, MEP engineers and BIM coordinators working to BS 7671:2018+A4:2026.
It captures the supply earthing arrangement (TN-C-S, TN-S, TT) and the installation type, then returns the correct conductor role, minimum size, identification colour and the relevant clauses from BS 7671, IET Guidance Note 8, BS 6701 and BS EN 62305-3.
It is intended to support – not replace – the designer’s judgement. Every selection should be verified against the project specification, the DNO’s requirements and the current edition of each referenced standard.
Built and maintained by Project Design (IO). Spotted an error or want a path added? Contact us.
- 1,308 + 1,260numeric test runs on the Toolkit and free tiers on 1.12.1, no findings
- 22outcomes from 17 guided questions
- 9warnings where the answer depends on something the tool cannot see
- 24,829tool pages read by the new wording check on 1.12.1 across both tiers, no finding
- Last reviewed
- September 2026
- Data basis
Show the full record
BS 7671:2018+A4:2026 Tables 54.1, 54.7 and 54.8 for conductor sizing. The earthing conductor is sized from the line conductor under Table 54.7; on a PME supply the Table 54.8 value applies as well, and where it is buried the Table 54.1 minimum for the burial method applies as well (Reg 542.3.1): the greater value is returned. Table 54.8 is keyed on the PEN conductor of the supply, the DNO's PEN at the cut-out, service head or substation, in copper equivalent; where an installation is fed from a landlord or BNO sub-main, that sub-main has separate neutral and earth conductors and no PEN, and the DNO's PEN at the building intake is entered instead, since PME conditions apply at each installation where the intake has a PME earth terminal (ENA G87 Issue 2, 5.2 and 5.4). Main protective bonding on TN-S and TT is half the earthing conductor under Reg 544.1.1, not less than 6 mm² copper and need not exceed 25 mm² copper; on PME it follows Table 54.8 from the copper-equivalent PEN. Supplementary bonding is sized from the CPC under Regs 544.2.1 to 544.2.3, with the 4 mm² minimum without mechanical protection applied as IET Guidance Note 1 Table 3.9 does. The decision paths cite Regs 415.2.2, 542.2 to 542.4.2, 543.1.1 to 543.5.1, 544.1.1 to 544.2.5, 545.1.1 and 545.1.2, 514.4.2, 514.13.1, 708.415.1, 709.531.2, 710.415.2.101, 722.411.4.1 and 722.531.3.101, and Table 51 for conductor identification. Guidance: BS 7671 Section 545, IET Guidance Notes 1 and 8, BS 6701, BS EN 50310 and BS EN 62305-3. 17 guided questions lead to 22 outcomes, with 9 warnings raised where the answer depends on something the tool cannot see.
- Validated against
Show the full record
15/09/2026 (1.12.1): the wording in the tool, in the result notes, in the readme and in the notes written inside the program code was revised in plain UK English. The identification notes now say a conductor has no protective function (Table 51, FE) or performs one (Reg. 543.5.1), and the functional earth bar note says no general protective bonding shall be connected to the bar. A new automated check reads every program file and the 12,539 tool pages on the Toolkit tier and 12,290 on the free tier that the full set of automated tests produces, and fails on the 1.12.0 build; the tests were re-run with 300 enumerated outcomes and 1,308 numeric test runs on the Toolkit tier and 1,260 on the free tier, no findings. No table value, clause or verdict changed; verified live after upload. 10/09/2026 (1.12.0): the confirmation screen after the supply and location questions was found to be a Continue click for every user that repeated the two answers, while its purpose, to stop the reader early with a warning, applies only where the combination raises one. It is now shown only where the supply and location raise a warning (PME at an EV charging point, a caravan park or marina, a petrol filling station or a medical location, any TT supply, medical on TN-S); on a plain building on PME or TN-S the role question follows the location directly and Back returns to the location question. The automated tests gained a check on every test run that the confirmation screen is present exactly where a warning applies and absent elsewhere, and that Back after a skipped screen returns to the location with its answer cleared; 300 enumerated outcomes and 1,308 numeric test runs on the Toolkit tier, 1,260 on the free tier, no findings, and the same tests fail on the 1.11.0 build. No table value, clause or verdict changed; verified live after upload. 10/09/2026 (1.11.0): the question about how the installation is supplied, added in 1.6.1 and reworded twice, was found to serve the multi-occupancy case only while being asked of every PME user, and to confuse the case it did not serve. It is removed. The PEN question is asked once per role, defined as the PEN conductor of the DNO supply at the cut-out, service head or substation in copper equivalent, and names the exception in one sentence: a landlord or BNO sub-main has a separate neutral and earth and no PEN, so the DNO's PEN at the building intake is entered instead (ENA G87 Issue 2, 5.2 and 5.4). The result prints the PEN used and prints a check line whenever the PEN entered equals the line conductor. The automated tests gained checks that no such question exists on the PME path, that the path runs straight from the installation method to the line conductor and the PEN, that the PEN question opens with its definition and names the exception with its basis, that the PEN is echoed on the result, and that the check line prints when the PEN equals the line conductor and never otherwise; 300 enumerated outcomes and 1,308 numeric test runs on the Toolkit tier, 1,260 on the free tier, no findings, and the same tests fail on the 1.10.0 build. No table value, clause or verdict changed; verified live after upload. 10/09/2026 (1.10.0): on a PME supply the question before the PEN entry was found to offer only the small-building form of a DNO supply (the cut-out), so an office block supplied from a DNO transformer on site fitted neither option. It was reworded with a description under each option. The worked example for the case entered now sits under a button on the result and the fixed reference example is no longer shown in the tool; the Back and Start again buttons sit at the top right of the tool. The automated tests gained checks that the two navigation buttons sit in the header and Print summary alone in the footer, and that the worked example sits under a button on every kind of result, closed until opened, with no reference example in the tool; 315 enumerated outcomes and 1,307 numeric test runs on the Toolkit tier, 1,259 on the free tier, no findings. No value, clause or verdict changed; verified live after upload. 05/09/2026 (1.9.0): the Engineering Toolkit gains a PEN cable helper under the PEN questions, built on a database of DNO service and mains cables with a source on every row: concentric service cables to BS 7870-3.11 from 4 to 35 mm² (copper equivalent of the concentric copper conductor by equal conductance against IET Guidance Note 3 Table B1, from the maximum resistance in the manufacturer datasheets), waveform mains and intake cables to BS 7870-3.40 and 3.50 from 95 to 300 mm² (the copper wires of the combined neutral and earth conductor, 22 or 42 wires of 1.85 mm, UK Power Networks EDS 02-0033), and the split concentric and 4-core cables that have no PEN, where the reader is sent to the DNO for the figure; an aluminium figure is converted by conductance (× 0.61, GN3 Table B1). The result, the worked example, the report and the printed sheet name the cable the figure came from. The automated tests gained their own transcription of every source and check against it the database, the helper on both tiers, every cable's fill and result band, the aluminium conversion at every Table 54.8 band edge, and a figure typed over the helper's value; 315 enumerated outcomes and 1,304 numeric test runs on the Toolkit tier, 1,256 on the free tier, no findings, and the same tests fail on the 1.8.1 build. No table value, clause or verdict changed; verified live after upload, with the helper tried while logged in. 05/09/2026 (1.8.1): on a PME supply the question before the PEN entry was found to read as ENA G87 text and to change nothing the reader could see. It now asks where the installation is supplied from, direct from the DNO cut-out or from a landlord or BNO sub-main, in plain words; each branch asks its own PEN question, the sub-main branch opening with the reminder that the sub-main neutral is not the PEN and that the PEN size at the building intake comes from the BNO or the DNO; the result on that branch shows a designer note naming the PEN used, in the tool, in the report and on the printed sheet, and the check line on a PEN equal to the sub-main line conductor reads as an instruction. The automated tests gained checks that each branch reaches its own PEN question, that the reminder opens the sub-main question and is absent from the cut-out question, that the feed question has no citation, and that the sub-main note reaches the result; 315 enumerated outcomes and 1,255 numeric test runs in each tier, no findings, and the same tests fail on the 1.8.0 build. No value, clause or verdict changed; verified live after upload. 05/09/2026 (1.8.0): the option buttons have shorter labels on every question so they read at a glance and never clip on a phone, with the detail kept in the question help and in the result, and every result with a size now opens with a one-line answer, the conductor role and its size, which stays in view while the rest of the result is read, with the full sizing line beneath it; the report and the printed sheet show the same answer line. The automated tests gained a check that the answer line is present wherever the sizing line opens with a figure, shows the same figure and the right role, and reaches the report and the printed sheet; 315 enumerated outcomes and 1,255 numeric test runs in each tier, no findings, and the same tests fail on the 1.7.0 build. No value, clause or verdict changed; verified live after upload. 04/09/2026 (1.7.0): every result now shows a worked example built from the case entered rather than a fixed illustration: the supply arrangement and location, each answer given, the table or regulation applied to the figures entered with the value at each step, the size that results and its identification, in the tool, in the emailed and exported report and on the printed sheet. The fixed examples stay below as reference examples. The automated tests gained a check that the worked example is present on every result, restates every figure entered, states the size the result prints and cites the table or regulation it came from; 315 enumerated outcomes and 1,255 numeric test runs in each tier, no findings, and the same tests fail on the 1.6.1 build. No value, clause or verdict changed; verified live after upload. 04/09/2026 (1.6.1): a landlord board fed through a building network was found to be answered from the sub-main neutral entered as the PEN. The PEN question now asks for the distributor's PEN at the intake in the standard's own term, names the sub-main and building network trap (ENA G87 5.2 and 5.4), and the result prints the PEN it used and checks a PEN equal to the line conductor on a sub-main. The automated tests gained a check that every input the standard names by a term of art is defined in the tool, echoed in the result and challenged where a substitution can be seen; 1,255 numeric test runs and 315 enumerated outcomes in each tier, no findings, and the same tests fail on the 1.6.0 build. No table value changed. 03/09/2026 (1.6.0): supplementary bonding now asks the CPC size and returns the Reg 544.2 size as a number, checked cell by cell against IET Guidance Note 1 Table 3.9; 1,245 numeric test runs in each tier, no findings. 03/09/2026: a buried earthing conductor on a TT supply was found to return the Table 54.1 minimum as its size. It was fixed in 1.5.3: every buried path now asks for the line conductor (and the PEN on PME) and returns the greater of the Table 54.7, Table 54.8 and Table 54.1 values. The automated tests gained a check that every derived size is reached through its input; 1,147 numeric test runs in each tier, no findings. 02/09/2026: every cited clause, table and note was read back again against BS 7671:2018+A4:2026, IET Guidance Note 8 (6th Edition) and the On-Site Guide; every computed size was also checked against On-Site Guide Tables 4.4(i) and 4.4(ii) as a second source, 28 further checks in each tier. Four wording corrections were released in 1.5.2 with no value or clause number changed; the full set of automated tests was re-run in both tiers, 634 scenarios each, with no findings. 12/08/2026: the full set of automated tests was re-run in both tiers after the limit of three anonymous sessions and the subscriber-only print were introduced, 634 scenarios each, with no findings; the free tier checks now confirm that the print button stays hidden and the email note is shown. August 2026 audit: 634 scenarios in each tier, free and Toolkit, were checked against hand transcriptions of Tables 54.1, 54.7 and 54.8, and every cited clause was read back against the standard itself.
- A guided decision on earthing and bonding: it returns the conductor role, the minimum size, the identification and the clause behind each answer.
- Covers the three supply arrangements, TN-C-S (PME), TN-S and TT, in a standard building, at an EV charging point, on a caravan park or marina, at a petrol filling station and in a medical location.
- Sizes are the table minimums. A size set by calculation under the Reg 543.1.3 adiabatic equation remains the designer's own calculation.
- The supply earthing arrangement is confirmed with the DNO. The tool works from the arrangement you state, it does not establish it.
- It supports the designer's judgement rather than replacing it. Verify every selection against the project specification, the DNO requirements and the current edition of each standard cited.
- Free to use in the tool with every answer stating its clause: three anonymous sessions, then your email continues free use, with the one page report by email. The printed report, saving to your projects and the editable exports are part of the Engineering Toolkit.
What's changed
- September 2026 · v1.12.1The wording in the tool, in the result notes, in the readme and in the notes written inside the program code was revised in plain UK English: an identification note now says a conductor has no protective function (Table 51, FE) or performs one (Reg. 543.5.1), and the functional earth bar note says no general protective bonding shall be connected to the bar. No table value, clause or verdict changed
- September 2026 · v1.12.0The confirm screen after the supply and location questions is shown only where that combination raises a warning (PME at an EV charging point, a caravan park or marina, a petrol filling station or a medical location, any TT supply, medical on TN-S). On a plain building on PME or TN-S it is skipped and the role question follows directly; Back from there returns to the location question. No table value, clause or verdict changed
- September 2026 · v1.11.0On a PME supply the question about how the installation is supplied (added in 1.6.1) is removed: it described the multi-occupancy case only and was asked of everyone. The earthing conductor path is now installation method, line conductor, PEN; main bonding asks the PEN only. The PEN question is asked once, defined as the PEN conductor of the DNO supply in copper equivalent, and names the exception in one sentence: a landlord or BNO sub-main has a separate neutral and earth and no PEN, so the DNO's PEN at the building intake is entered instead. The result still prints the PEN used and prints a check line whenever the PEN entered equals the line conductor. No table value, clause or verdict changed
- September 2026 · v1.10.0On a PME supply the question before the PEN entry now asks what feeds the main switch of this installation, and each option has a one-line description: DNO equipment (a cut-out, a service head, or the DNO's transformer or substation on a larger building) or another switchboard (a landlord or BNO sub-main: a flat, a tenant floor or a landlord board on a building network). The intake-branch PEN question asks for the PEN of the DNO supply at the cut-out, service head or substation. The worked example for the case entered sits under a button on the result and the fixed reference example is no longer shown in the tool. The Back and Start again buttons sit at the top right of the tool. No table value, clause or verdict changed
- September 2026 · v1.9.0Engineering Toolkit: the PEN questions on a PME supply now include a helper that fills the PEN size in from the DNO cable named on the connection offer or by the BNO, with the source: concentric service cables to BS 7870-3.11 from 4 to 35 mm2, waveform mains and intake cables to BS 7870-3.40 and 3.50 from 95 to 300 mm2 (the copper wires of the combined neutral and earth conductor), and the split concentric and 4-core cables that have no PEN, where the figure comes from the DNO. A PEN size given in aluminium is converted to copper equivalent by conductance. The result and the worked example name the cable the figure came from. No table value, clause or verdict changed
- September 2026 · v1.8.1On a PME supply the question before the PEN entry now asks where the installation is supplied from, direct from the DNO cut-out or from a landlord or BNO sub-main, in plain words. The sub-main branch asks its own PEN question with the reminder first: not the neutral of the sub-main, which has no PEN; ask the BNO or the DNO for the PEN size at the building intake. The result on that branch shows a designer note naming the PEN used, and the check line on a PEN equal to the sub-main line conductor reads as an instruction. ENA G87 Issue 2 is cited at the PEN question and in the result. No value, clause or verdict changed
- September 2026 · v1.8.0The option buttons have shorter labels on every question, so they read at a glance and never clip on a phone; the detail they held stays in the question help and in the result. The result now opens with a one-line answer, the conductor role and its size, which stays in view while the rest of the result is read, with the full sizing line beneath it. The report and the printed sheet show the same answer line. No value, clause or verdict changed
- September 2026 · v1.7.0Every result now shows a worked example for the case entered: the supply arrangement and location, each answer given, the table or regulation applied to the sizes entered with the figure at each step, and the size that results. The fixed examples stay below it as reference examples. The emailed and exported report shows the same steps. No value, clause or verdict changed
- September 2026 · v1.6.1The PEN input on PME is now asked in the standard's own term: the copper-equivalent size of the distributor's PEN conductor at the intake (Table 54.8, the PEN conductor of the supply), with the trap named in the tool: a landlord sub-main or building network cable feeding the board has separate neutral and earth conductors and no PEN, and on a building network to ENA G87 fed from a PME intake PME conditions apply at each installation (G87 5.2 and 5.4). A feed question precedes the PEN entry for the earthing conductor and main bonding roles, the result prints the PEN it used, and a PEN equal to the line conductor on a sub-main is flagged for checking. No table value changed
- September 2026 · v1.6.0Supplementary bonding now asks what the conductor connects, whether it is mechanically protected and the CPC size, and returns the Reg. 544.2.1 to 544.2.3 size as a number (half the CPC taken to the next standard size; 4 mm2 minimum without mechanical protection applied with the conductance rule as IET Guidance Note 1 Table 3.9 does); previously the rule was printed without a number
- September 2026 · v1.5.3Buried earthing conductors now ask for the line conductor size (and the PEN size on PME) and return the greater of the Table 54.7 value, the Table 54.8 value where PME conditions apply, and the Table 54.1 minimum for the burial method (Reg. 542.3.1); previously the three buried options printed only the Table 54.1 minimum
- September 2026 · v1.5.2The wording was checked against the standard: the main bond need not exceed 25 mm2 (was maximum), the functional earth single-connection rule is restated to Reg. 545.1.1 without the radial wording, the green-and-yellow reservation is cited to Reg. 514.4.2, and the MET spelling in the CBN example was corrected; no value or clause number changed
- September 2026 · v1.5.1The wording in the tool was revised in plain UK English: the greater value shall be used, and maximum and minimum sizes are named as such; regulations apply and require; no value or clause changed
- August 2026 · v1.5.0Free use is now measured in sessions: three days of anonymous use, then your email continues free use with no password and no account. The report goes by email for free users; the printed report is part of the Engineering Toolkit. Every answer stays free in the tool with its clause; subscribers are unchanged
- August 2026 · v1.4.7Print summary now appears only on a result card and always prints the report sheet; previously the button showed on every step and printing before a result produced a blank page
- August 2026 · v1.4.6Full scenario audit with source read-back against the standard. PME earthing conductor now sized as the greater of Table 54.7 and Table 54.8 (new PEN question, Reg. 542.3.1); unsourced 6 mm2 floor removed; EV RCD options corrected to Reg. 722.531.3.101; BS 6701 sizing claim corrected; 544.2 and medical wording aligned to the regulations; worked examples corrected; labels quoted without dashes
- August 2026 · v1.4.5Subscriber-facing copy states what the Engineering Toolkit adds rather than what the free preview lacks
- June 2026 · v1.4.4PDF filename now matches the other tools
- June 2026 · v1.4.2Save to a project and the editable Excel, Word and CSV exports were added
- June 2026 · v1.4.0The tool was updated to BS 7671:2018+A4:2026 and the decision paths were audited again