PD Fire Alarm v0.32.0

Design and verify fire detection and alarm provisions to BS 5839-1:2025 and the wider UK framework. Every claim is referenced to a clause, so you can answer the question "why is this device here" cross referenced to a standard.

1 System Design 2 Design Summary 3 Design Check

Loading the design stages...

This is a live summary of your design so far, compiled from what you entered through the steps. It is compiled again each time you open the Design Summary tab.

Show how the framework fits together (background reading)

Check a design somebody else proposed, a consultant's or a tenderer's. Pick the item, enter the proposed values in the structured fields, and every verdict comes back cross referenced to the clause that applies. The checks are structured on purpose: the same verified calculations as the design stages, never free text interpretation.

This is a guidance tool built on a cited rule base. It is not a substitute for the judgement of a competent fire alarm designer or for the requirements of the project fire strategy. Verify final designs against the current standards.

v0.32.0 · Verified BS 5839-1:2025 (cl. 4 category, cl. 12 fire detection zones, cl. 13 alarm zones, cl. 15 to 18 alarm devices, cl. 20 detector types and selection, Tables 1 to 3 with cl. 21 detector siting and spacing, cl. 22 control and indicating equipment and the zone plan, cl. 24 and Annex E power supplies and batteries, cl. 25 and 35 cables and containment), BS 9999:2017 Table 7, BS 9991:2024, BS 5839-6:2019+A1:2020 Table 1, BS 5839-8:2023, BS 5839-9:2021, BS 8629:2019+A1:2023, BS 7273-4:2015+A2:2023, BS 7273-6:2019, BS 8519:2020 Table 1, BS 8300-2:2018, BS 7827:2019, BS EN 54-23:2010, BS 7346-7:2013, Health Technical Memorandum (HTM) 05-03 Parts A, B, E, J, K and M, and Approved Document B volume 2
  • 735rules written from the standards, each cited to its clause
  • 3,859 + 3,878scenarios in the extended free and subscriber tests on 0.32.0, no findings
  • 66 of 66comparison checks on 0.31.0 between the tool and a separate calculation of the same rules
  • 735 of 735rules read back against the source
Last reviewed
September 2026
Data basis
735 rules written from those standards in our own words, each referenced to its clause: 151 from BS 5839-1:2025, 116 from HTM 05-03, 65 from BS 5839-6, 54 from BS 7273-6, 53 from B...Show the full record

735 rules written from those standards in our own words, each referenced to its clause: 151 from BS 5839-1:2025, 116 from HTM 05-03, 65 from BS 5839-6, 54 from BS 7273-6, 53 from BS 5839-8, 48 from BS 7827, 40 from BS 9991, 30 from BS 8300-2, 28 from Approved Document B, 24 from BS 5839-9, 24 from BS 7273-4, 21 from BS 8519, 18 from BS 8629, 16 from BS 5839-3, 15 from BS 9999, 8 each from BS EN 54-23 and the Fire Industry Association (FIA) visual alarm guide, 6 from BS 7346-7, one rule that cites three of the BS 5839 parts together, and 9 from manufacturer guidance, trade correspondence and PD project precedent, each flagged as such where it is used. HTM 05-03 and Approved Document B are Crown copyright, reused under the Open Government Licence v3. The standards themselves are not reproduced here: to read a clause in full you need your own copy.

Validated against
Battery capacities and detector spacing are independently verified against calculations derived from BS 5839-1 and BS 5839-8. Version 0.32.0 was last validated on 17/10/2026, passing 46 automated checks, including 23 fault-injection tests.
Scope and limits
  • Guidance for a competent designer. It does not replace the project fire strategy.
  • The system category comes from the fire strategy or the enforcing authority. The guide verifies a category, it does not set one.
  • Detector siting covers flat and pitched ceilings, corridors up to 2 m wide and the Table 3 ceiling limits. Beam, aspirating and void detection are advised on, not laid out.
  • The cause and effect matrix is a starting point to agree with the fire engineer, not an issued matrix.
  • Healthcare, venue and accessibility overlays apply where the project profile calls for them. For hospitals, read HTM 05-03 Part B alongside it.
  • A declared BS 5839-1 category and a BS 5839-6 grade are not comparable. Where the two are mixed the guide states the mismatch and gives the requirement for the premises, without a pass or a failure.
  • The voice alarm figures cover the alarm signal. Speech intelligibility is assessed separately to BS 5839-8.
  • Free to use in the tool with every answer showing its clause: three anonymous sessions, then your email continues free use. The printed and saved design basis, the cause and effect matrix as a landscape PDF and the editable exports are part of the Engineering Toolkit.
What's changedOctober 2026 · v0.32.0A blank main entry gives CHECK, never a default figure, in the tool, the printed report and exports. Other entries, such as the ceiling pitch and the standby generator, keep their usual default, shown with the result. Call point travel includes the walk out of a room, and the limit is 30 m in a straight line until the final layout is known (BS 5839-1:2025 19.5). A design that passed before can now fail. The pitched ceiling increase applies only at or near the apex, and the 6 h derating factor applies to voice alarm batteries with a generator.
  • October 2026 · v0.32.0A blank main entry gives CHECK, never a default figure, in the tool, the printed report and exports. Other entries, such as the ceiling pitch and the standby generator, keep their usual default, shown with the result. Call point travel includes the walk out of a room, and the limit is 30 m in a straight line until the final layout is known (BS 5839-1:2025 19.5). A design that passed before can now fail. The pitched ceiling increase applies only at or near the apex, and the 6 h derating factor applies to voice alarm batteries with a generator.
  • October 2026 · v0.31.1The care home sprinkler rule now states the 2025 text of Approved Document B volume 2 paragraph 2.46: care homes should be fitted with sprinklers throughout. Engineering Toolkit subscribers now see the rule in the Design Summary for Residential care, flats and dwellings, with or without sprinklers. No other rule, calculation, figure, limit, verdict, printed report or export changed.
  • September 2026 · v0.31.0The lines on healthcare audibility, battery capacity and call point delays now match the cited clauses. For phased evacuation, the fire control centre now has its own NOTE line (BS 9999:2017 Clause 24). There is one new rule on evacuation lifts, and the intelligibility rule is now three rules. No calculation, figure, limit or other verdict changed.
  • September 2026 · v0.30.0PD Fire Alarm is the tool's new name. Eleven lines about a missing or wrong input are now marked CHECK in amber. Abbreviations are now written out on first use in each view, the printed report and the exports. The printed report's small text is now 7.1 pt. No calculation, figure, limit, clause reference or other verdict changed.
  • September 2026 · v0.29.1About 60 lines in the tool and 18 rule texts now use the verb of the clause they cite, "should" or "shall". The cause and effect matrix note now says sample testing should not be permitted (HTM 05-03 Part B:2024 4.63, BS 5839-1:2025 37.4). The lift note now says that, for an evacuation lift, the building designer, system designer and lift provider should agree whether recall and suspend-service signals are provided (BS 7273-6:2019 9.4). No calculation, limit, verdict or clause reference changed.
  • September 2026 · v0.29.0The tool now looks like the PD Power Distribution tool, with the same font and colours, and its name and version are in a dark bar at the top. On each verdict line, PASS, FAIL and NOTE are now in green, red and blue tags. The drawings and the printed design basis are in the new colours. No rule, limit or verdict changed.
  • September 2026 · v0.28.2Where a rule's source document refers to a withdrawn edition of BS 5839-1, the reference is now given as that document prints it, with the BS 5839-1:2025 equivalent beside it, for example "BS 5839-1:2017 Clause 45 (now BS 5839-1:2025 Clause 43)". HTM 05-03 Part B references now state the 2017 edition that HTM cites. No design value or verdict changed.
  • September 2026 · v0.28.1The BS 8519 cable categories note now separates the systems: emergency lighting fed from a central power supply system is "Standard 60" or "Enhanced 120" to BS 5266-1:2025 8.2.2, where the note had given the fire alarm figures for both. Other wording was revised in plain UK English, with the meaning unchanged. No category, verdict or clause reference changed.
  • September 2026 · v0.28.0The Storeys field is now shown only under phased evacuation, the only case in which it is used. A request for the search distance is now printed for a detector zone that has none. A property protection category alongside the life safety category, for example L2/P1, can now be entered. No rule, limit or verdict changed.
  • September 2026 · v0.27.0Five controls needed only in particular cases are now shown only in those cases, on the zoning, alarm devices and cables steps. The two conditions for enhanced cables now sit in an exceptions section that you open when needed, and the standard cable verdict states the basis it used. No rule, limit or verdict changed.
  • September 2026 · v0.26.0A step that was not opened is no longer worked from the tool's default figures: in the design basis, an unopened step that needs inputs is shown as one line naming the inputs to enter. A visual alarm coverage verdict now prints only after the devices are declared. No rule, limit or verdict changed.
  • September 2026 · v0.25.2The ceiling height fields now state that the entry is the ceiling height above the floor, not the storey height. The visual alarm device mounting height field states that the entry is the installed height, not the figure in the category code, and the verdict prints the height assessed. No rule, limit or verdict changed.
  • September 2026 · v0.25.1The total floor area field now says it is the whole building, every storey added together, and the zone step prints a check where the building total is below the zones entered. No category, limit or duration changed
  • September 2026 · v0.25.0The standby battery for emergency voice communication, Grade A dwellings, voice alarm and Category P systems is now sized from the loads and conditions entered, which are asked for when blank. In detector selection, the ceiling height, beam sensitivity and aspirating class are asked for before the Table 3 limit is applied. Design Check runs no longer alter the design report.
  • September 2026 · v0.24.3The wording was revised in plain UK English: standards apply to a system, the design framework and the minimum that applies are named as such, plurals written out. No rule, verdict or clause changed
  • August 2026 · v0.24.2On phones and narrow windows the siting and call point drawings now sit directly below their inputs, before the verdict lines, instead of after them. The call point arrangement selector shows its full text
  • August 2026 · v0.24.1The manual call point step uses the same side by side layout as detector siting: inputs and verdicts on the left, the route drawing on the right, redrawing as you type. Its drawing title now fits the frame on two lines
  • August 2026 · v0.24.0Back and Next now sit in the same place on every step, and the project summary bar stays in view below the site menu. On a wide screen, the detector siting drawing sits beside the inputs and is redrawn as you type.
  • August 2026 · v0.23.0Free use is now measured in sessions: three days of anonymous use, then your email continues free use with no password and no account. The Design Check module asks for your email from the first check. Every answer stays free in the tool with its clause; subscribers are unchanged
  • August 2026 · v0.22.0Two rules were written from their source documents: BS 9991:2024 clause 46 on firefighting shafts with firefighters lifts, and HTM 05-03 Part M on considering voice alarm for atria holding significant numbers of the public, designed to BS 5839-8. The rule base now holds 732 rules.
  • August 2026 · v0.21.1The last rule is read: FSF 210, the standby battery guidance, was in the library filed under its title, and every one of its nine values verified against it, including the simplified formula's de-rating factor of 2. The read-back now covers all 730 of 730 rules. The Category P standby condition also states its staffed-premises qualifier in full
  • August 2026 · v0.21.0The source read-back is complete: 729 of the 730 rules have been read word for word against their sources, and the defects found, nearly all missing qualifiers or dropped exceptions rather than wrong numbers, were corrected.
  • August 2026 · v0.20.0The source read-back finished its second band: every rule with a figure a reader can act on, 195 of them, read word for word against the published standard. That found 92 further defects, almost none a wrong number, nearly all a qualifier that had gone missing
  • August 2026 · v0.19.1BS 7273-4 Annex B: where a door matches more than one description, the highest recommended category of actuation applies. Now stated on the hold-open, electronically locked and powered sliding door selections
  • August 2026 · v0.19.0Two claims split from the clauses that did not state them. Approved Document B paragraph 0.9 is the permission to adopt an alternative standard, and it requires that standard's fire safety recommendations to be followed in their entirety
  • August 2026 · v0.18.3Unit correction: the BS 5839-9 minimum for twisted-pair emergency voice communication cables is a cross-sectional area of 0.5 mm², not 0.5 mm (Clause 14)
  • August 2026 · v0.18.2The intelligibility note now also cites BS 5839-8:2023 Clause 20.3.4, the recommendation it was already stating
  • August 2026 · v0.18.1Risk profiles Ci1 and Ci2 state the requirement as a minimum Category L3 system to BS 5839-1, with automatic fire detection in each individual unit and voice alarm to BS 5839-8
  • August 2026 · v0.18.0Both blocks of BS 5839-6 Table 1 are now held, for premises with no floor greater than 200 m² and for premises above it, and the premises list states which applies. Before, only the smaller block was held, so a rented three-storey house over 200 m² was given Grade D1 where the standard gives Grade A.
  • August 2026 · v0.17.0The BS 9999 minimum category separates the two requirements in Clause 15.2: Table 7 gives the minimum for the risk profile, and the text after it raises that to Category L3 for phased, staged or zoned evacuation and for primary and special needs schools. Each figure now cites the rule that produced it
  • August 2026 · v0.16.1The cause and effect matrix hides the level count where per-level rows cannot apply, and says why, instead of accepting a number that changed nothing
  • August 2026 · v0.16.0Sound levels at a bedhead: 75 dB(A) for a sounder and 70 dB(A) for a voice alarm are minimums, so above a 60 dB(A) background the requirement is the greater of that figure and the background plus 5 dB(A). Voice alarms also include the separate intelligibility assessment
  • August 2026 · v0.15.0The reference list behind each step now sits with the Engineering Toolkit. Every answer still shows its own clause, free to run, no signup
  • August 2026 · v0.14.1Three corrections from a second run of the scenario tests, run in both the free and the subscriber view: changing the building no longer leaves earlier answers in an exported report, and internal references are stripped from any note before it is shown
  • August 2026 · v0.14.0Corrections from a scenario audit of 4,470 input combinations. A BS 5839-1 category and a BS 5839-6 category are separate classifications for different premises, so comparing them no longer returns FAIL, and the guide states which standard to declare from
  • August 2026 · v0.13.0What is free and what the Engineering Toolkit adds is stated as it is on the other PD tools. All twelve steps stay free to run, no signup, with the clause behind every answer; the Toolkit holds the compiled design basis, the cause and effect matrix, the drawings, the PDF documents, saved projects and the editable exports
  • August 2026 · v0.12.0You can add your own causes to the cause and effect matrix, each with its own fire zone, saved with the report and included in the printed matrix and the exports
  • August 2026 · v0.11.0The cause and effect matrix downloads as a landscape PDF on A4, A3, A2 or A1 according to its width, produced on the server so the orientation no longer depends on the browser
  • August 2026 · v0.10.1The matrix level count follows the building, up to 40, and a saved report reopened from My Projects prints exactly what was saved
  • August 2026 · v0.10.0Print or save as PDF sits on the main tool window as well as the Design Summary, and changing the project profile clears the worked steps so a report cannot mix new project details with old answers
  • August 2026 · v0.9.9Fix: printing a saved report from My Projects no longer reopens the print dialog over and over
  • August 2026 · v0.9.8Reports no longer depend on which steps you happened to open: every step is worked out when the report is built
  • August 2026 · v0.9.7The printed report is branded and laid out like the other PD tools, with the drawings included and the cause and effect matrix on its own landscape page, the paper growing to fit it. The drawings also travel into the Word file and onto their own sheet in the workbook
  • August 2026 · v0.9.6The exported report includes every step in full and in order, each line with the clause it came from. Two references corrected where a rule had been split in two
  • August 2026 · v0.9.5Design Check takes its own figures, starting from the project profile, so a design can be checked as it stands and then varied without altering the design
  • August 2026 · v0.9.4Every verdict and note shown in the tool was rewritten in formal UK technical language, with clause references in full, for example BS 5839-1:2025, Clause 15.1.3. Requirements attributed to a PD position are labelled as such and dated
  • August 2026 · v0.9.3The rule file the tool downloads holds only the clause reference; page numbers and internal working references are gone
  • August 2026 · v0.9.2The design flow is twelve steps: the three stages that only restated the project profile are compiled into the Design Summary and the exported report
  • August 2026 · v0.9.1Phone layout: the phase and step rails scroll on one line, and every step fits a 390 px screen with no sideways scrolling
  • August 2026 · v0.9.0In this first release, the design workflow covers the project profile, zoning, detectors, call points, sound levels, visual alarms, standby batteries and cables, through to the documentation checklist. The tool also has an editable cause and effect matrix and a Design Check tab for checking a proposal somebody else has made. Every output line shows its clause.