A start event specifies where a process will begin. Start events can only react when a trigger is “caught.” Symbol 9). BPMN Method and Style: A levels-based methodology for BPM

The Museum of the Future
Introduction The idea to connect 3D CAD models with construction programs (4th Dimension) was formulated in 1986-87 when Bechtel collaborated with Hitachi Ltd to develop the 4D visual model[1] The
taxonomy
A system for naming and organizing a set of words or phrases, into groups that share similar qualities, used for organising information and primarily intended for browsing. In BIM contexts
Prospective fault current (Ipf)
Prospective Fault Current (Ipf) is the value of overcurrent at a given point in a circuit resulting from a fault of negligible impedance between live conductors having a difference of
asset management
coordinated activity of an organization to realize value from assets Note 1 to entry: Realization of value will normally involve a balancing of costs, risks, opportunities and performance benefits.Note 2
People
An element of a BIM strategy which is often overlooked. Clear communication is required as to why and how you intend to implement BIM and gain support by engaging BIM
Existing Conditions Modeling
A process of developing a 3D model of the existing conditions for an asset, or a specific area within a facility.The model can be developed based on laser scanning surveys
Management of duplicates
The procedure to remove duplicate properties shall be carried out on the relevant attributes. The management of duplicates cannot be fully automated. BS EN ISO 23386:2020
Fault
Acircuit condition in which current flows through an abnormal or unintended path. The fault current may flow from line to line (phase fault) or line to earth (earth fault).
Royal Institute of British Architects (RIBA)
RIBA Plan Of Work 2020 0 – Strategic Definition is about determining the best means of achieving the client’s requirements. An open mind is required because a building might not
component
named and individually scheduled physical item and feature that might require management, such as inspection, maintenance, servicing or replacement, during the in-use phaseNote 1 to entry: Components can serve as
Lean construction
Lean Construction is the method of project management aiming to reduce waste on a project and improving the efficiency and quality of produced work [1]. The aim to reduce overproduction,
workflow
The term ‘workflow’ is used in ISO 19650 instead of the PAS 1192 term ‘process’.

information delivery milestone
scheduled event for a predefined information exchange [cited from ISO 19650-2:2018(en), 3.1.3.2] Milestones act as signposts through the course of a project. An information delivery milestone is a point in
digitalconstruction campaign!
https://www.linkedin.com/posts/willmottdixoninteriors_digital-construction-willmott-dixon-interiors-activity-6806218396632457216-h8PT

Management of the cyber-security threats in Common Data Environment
The increased reliance of the IT Technology Widely used cloud-based systems with file-sharing protocols have are the way of the future, but the use of such a platforms increase the
workflow management system
Workflow management systems allow organisations to identify and control activities associated with a business process. Effective workflow management offers the opportunity to measure and analyse the execution of the processes
Semi-enclosed fuse rating factor (Cf)
The rating factor Cf = 0.725 is applied to cable sizing calculations for any circuit protected by a semi-enclosed fuse to BS3036.
BS EN ISO 19650-3:2020
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) – Information management using building information modelling Part 3: Operational phase of the assets
digital built environment
The terminology such as digital built environment and smart asset management, often referred to as Digital Construction, encompasses multiple technologies and processes related to information or project management and the
definition
representation of a concept by a descriptive statement which serves to differentiate it from related concepts Note 1 to entry: A definition may be expressed as natural language text (a textual

BIM Stages
ELI5-S1:BIM Basics: E13_Understanding BIM Stages Understanding BIM Stages: Transitioning from BIM Levels to a Modern Framework In the world of Building Information Modeling (BIM), we often come across terms like
diffusion
a process by which an innovation is communicated through certain channels over time among the members of a social system E.M. Rogers, Diffusion of Innovations, Free Press, New York, 1995.
coordination
execution of workflow in the correct sequence managed by the competent project team members working together to achieve common, albeit often multifaceted goal. Coordination often involves more than one party
BS EN ISO 21597-1:2020
Information container for linked document delivery — Exchange specification Part 1: Container

Breaking capacity
IWE-S1-IWE- E8_Breaking Capacity of MCCB What is Breaking Capacity (kA) Breaking capacity, often referred to as short-circuit breaking capacity, is one of the most critical specifications of a protective device.
Heating, Ventilation and Air-Conditioning (HVAC)
Heating, Ventilation and Air-Conditioning (HVAC). All necessary heating, ventilation air-conditioning and specialty equipment, including air distribution ducts for supply, return, and ventilation and exhaust ducts, including control system, registers, diffusers,
BIM Use
A Use Case is a description of an intended use of the BIM, along with a description of the type(s) of data that must be in the BIM in order
BS ISO 44002:2019
Collaborative business relationship management systems Guidelines on the implementation of ISO 44001
BS EN ISO 29481-1:2017
Building information models – Information delivery manual Part 1: Methodology and format
Current-carrying capacity
Themaximum current which can be carried by a conductor under specified conditions (Installation method, temperature,grouping,etc.)without its steady-state temperature exceeding a specified value (for example,90 ºCfor cables with thermosetting insulation).
Set-Based Design
Set-Based Design commonly referred to as a set-based design innovation or set-based concurrent engineering. It is a product development approach where teams consider a wide range of design alternatives (a
Circuit Protective Conductor (CPC)
Acircuit protective conductor (CPC) connects exposed-conductive-parts* of equipment to themain earthing terminal. *Conductive part of equipment,which can be touched and which is not normally live,but which can become live when
Two Stage Open Book
A procurement method introduced by Constructing Excellence and the Cabinet Office where a client invites prospective integrated teams to bid for a project based on their ability to deliver an outline brief
Mobilization Plan
A plan for the Mobilization of the Delivery Team’s resources in accordance with the Information Standard which is contained in the Appointment or, if no Mobilization Plan is contained in
Model View Definition (MVD)
One or more specific information exchange requirements may necessitate the need for a model view definition (MVD). A machine-readable representation of MVDs is required when using them in software development.

Junction Boxes
Junction Box Requirements in Electrical Installations To ensure compliance with BS 7671:2018+A2:2022, the following requirements apply when using junction boxes in electrical installations: 1. Compliance with BS EN 60670-22 Any
Final Circuit
A circuit connected directly to current-using equipment, or to a socket-outlets or other outlet points for the connection of such equipment.
DWG
DWG (“drawing format”) is a binary file format licensed by Autodesk and used for storing two and limited three-dimensional design data and metadata. It is the native format for several
Insurance Backed Alliancing
A new procurement method coupled up with Integrated Project Insurance model (IPI) is a framework which encourages and empowers project teams to work together. The procurement method introduced by Constructing Excellence
Assignment
A request or offer resulting in a Reliable Promise and is ready to be placed on the Weekly Work Plan (WWP) for performance. An assignment must meet the characteristics for
naming
The term naming in PAS 1192 is related to information container naming strategy, in ISO 19650 the therm is replaced by term ‘identification’ meaning remains the same

jet
extinguishing medium, usually water, leaving a nozzle as a continuous stream, water spray, or waterfog (mist) BS 4422 2005 Each of these methods has its own advantages and is chosen
Gateway (Exclusive)
[XOR] When splitting, directs the sequence flow to one of the outgoing branches. When merging, it waits for one incoming branch to finish before starting the outgoing flow.[1] Symbol
Appointee
UK BIM Alliance responding to the inconsistency between current guidance of CIC BIM Protocol, Second Edition 2018 and ISO 19650 Framework published updated Information protocol to support BS EN
Industry Foundation Classes (IFC)
conceptual data schema and exchange file format for building information modelling (BIM) data BS EN ISO 23387:2020 In general, IFC, or “Industry Foundation Classes”, is a standardized, digital description of
Clash Detection
Clash detection, coordination analysis and data checks shall be carried out by the BIM Coordinators against the latest shared models. The workflows involve a combination of visual and automated checks
Information Controller
Responsible for setup and management of the Common Data Environment (CDE), document submission, RFI and other project document transactions. [Appointment: Lead Appointed Party Information Controller, site-based/office based.] [source] PDE 4301

volume
ELI5-S1: BIM Basics E10: Volume Strategy (spatial) explained a term defined by BS 1192:2007 means a spatial subdivision of a project to allow multiple people to work on Project Information

PUBLISHED
Information accepted by the nominated party, in which case it will be suitable for tender or construction (2D model output only). Such that the ‘Published’ area should be maintained in