buildingSMART Data Dictionary
PD 19650‑0:2019 In short, the BuildingSMART Data Dictionary is a library for everything to do with the building. NumberName is an int key and string
PD 19650‑0:2019 In short, the BuildingSMART Data Dictionary is a library for everything to do with the building. NumberName is an int key and string
individual or multiple buildings (e.g. a site or campus) or infrastructure (e.g. roads, railways, pipelines, dams, docks, etc.) built as part of a construction project
All forms of buildings (residential, industrial, commercial, hospitals, schools), all economic infrastructure (above and below ground) and the urban space and landscape between and around
Business goals drive organisational outcomes, helping to keep the focus on the company’s important short and long term priorities. The goals must be defined, understood,
Business Process Modelling Notation (BPMN) is a flow chart method for modelling the steps of a planned business process from beginning to end. It is
k2s2 its an Energy withstand of cable in A2s. For example,a cable with a withstand of 12 x 104 A2s, can sustain without permanentdamage,a fault
a measure of ability to perform and function [cited from ISO 19650-1:2018(en), 3.3.18]
Delivery phase [ISO1950] Delivery phase is a simplification of capital/delivery phase without making any assumption about how the project funding is being treated in financial
A carbon sink is a natural or artificial reservoir that captures and stores morecarbon than it releases. Examples include forests, oceans, soil and potentially timber
ELI5-S1: BIM Basics E5: CDE areas and states Area and section imply moving information from one place to another. This is not necessary in a
Transition [ISO19650] Transition is used to denote change (in the state of the information container)
ELI5-S1: BIM Basics E5: CDE areas and states This term replaces the ‘CDE area’ PAS 1192 term, the idea is the location of the information
Assurance given by an independent certification body (ISO does not perform certification) that a product, service or system meets the requirements of a standard. https://www.iso.org/glossary.html
Concept of change strategy involves identifying objectives, formulating intervention concepts for change, forming and defining success parameters, and implementing strategies. This includes testing the effectiveness
Acircuit protective conductor (CPC) connects exposed-conductive-parts* of equipment to themain earthing terminal. *Conductive part of equipment,which can be touched and which is not normally live,but
A fuse or circuit-breaker providing overload and fault current protection.
Clash detection, coordination analysis and data checks shall be carried out by the BIM Coordinators against the latest shared models. The workflows involve a combination
description of a set of objects that share the same characteristics Note 1 to entry: The characteristics may be embodied by the use of properties,
actor (3.2.1) responsible for initiating a project and approving the brief [cited from ISO 19650-1:2018(en), 3.2.5] The UK BIM Alliance, responding to the inconsistency between the current
Assembling the entire BIM design and construction team in a single location (“Co-location”) enables almost instant and direct communication and coordination among team members. This
COBie data drop Individual COBie data drops are the responsibility of Task Team BIM Managers, who must upload the required information containers in accordance with
Set of principles to be followed by people involved in ISO work, e.g. working within an international framework, upholding consensus, being ethical. https://www.iso.org/glossary.html
a deliberate approach to working together on an agreed common purpose within functional, organisational, geographic, or organisational boundaries. Collaboration often depends on a solid knowledge management
Working with different teams is probably the most difficult part of the design process. It is important to note that a collaborative design process is
A building has successfully gone through the commissioning process when its equipment and systems have been examined and tested to perform as designed, and its
This could be: a Technical Committee (TC), which develops standards in a certain sector or industry; a Subcommittee (SC), which addresses a specialized area within
ELI5-S1: BIM Basics E2: CDE Explained The purpose of using Common Data Environment (CDE) on a project is to provide the right person with the
Workflow comparison First, I constructed an information exchange process diagram based on ISO 19650 Part 2 dedicated to the delivery phase of an asset lifecycle
BS EN ISO 19650-2 2018 BS EN ISO 19650-2 2018, NA 02/2021 Status Code Suitability Action by Suitability Action by Information State
Aperson who possesses sufficient technical knowledge, relevant practical skills and experience for the nature of the electrical work undertaken and is able at all times
adjective In Architecture Engineering and Construction (AEC), complete information is information which includes all the necessary and typical parts or elements, lacking nothing. For the
named and individually scheduled physical item and feature that might require management, such as inspection, maintenance, servicing or replacement, during the in-use phaseNote 1 to
Originally coined in the 60s, The acronym has become a catch-all for a wide range of Facilities Management platforms and software. A CAFM system can be
Computer-aided design (CAD) encompasses the use of computers (hardware) and software to assist in the design process. CAD software is frequently used by different types
An explicit description by a Customer of all the actual requirements that must be satisfied by the Performer in order for the Customer to feel
Conformance class allows establishing relations from the information model of BS EN 82045-2 to any other object of relevance available information model. For example, the
Committee whose secretariat is provided by ISO/CS that deals with conformity assessment and is responsible for the development of conformity assessment standards. https://www.iso.org/glossary.html
general agreement, characterized by the absence of sustained opposition to substantial issues by any important part of the concerned interests and by a process that
Various key characteristics of CM@Risk include: there are separate contracts for design services and for construction services; the contract for construction services may be entered
COBie is a non-proprietary data format for the publication of a subset of building information models (BIM) that focuses on delivering asset data rather than
Construction Products Regulation (CPR) https://ec.europa.eu/growth/sectors/construction/product-regulation_en#:~:text=The%20Construction%20Products%20Regulation%20(CPR,the%20performance%20of%20construction%20products.
Atype of single-phase board for the control and distribution of electrical energy, principally in domestic premises. In the ProDesign software,a consumer unit (CU) can be
Appointment ISO 19650 introduce term Appointment to be used instead of the more generic term contract. This means one term can be used for both
Contract Particulars refer to the document outlining the Framework Agreement’s specific core terms, which may include but are not limited to the Pricing Schedule, Authorised
Contractor’s proposals (CP) in AEC industry refer to documentation prepared by tenderers for design and build projects or on a traditional contract where the bidder
The interaction of individuals or task teams who work together to achieve a common goal, it demonstrates the ability to learn from each other. Cooperation
execution of workflow in the correct sequence managed by the competent project team members working together to achieve common, albeit often multifaceted goal. Coordination often
A procurement method introduced by Constructing Excellence and the Cabinet Office intended to allow industry to use its experience and knowledge to develop innovative solutions through leveraging
statement showing an apportionment of an estimate (3.7.9) or of an agreed budget between cost (3.7.1) headingsNote 1 to entry: For example, the cost plan might be broken down into building elements. [1]
The Crown Commercial Service (CCS) is an administrative agency and trading fund of the Cabinet Office of the UK Government, responsible for the supervision of
Iz The current carrying capacity of a cable under the defined installation conditions. This is the effective rating of the cable after the relevant rating
Themaximum current which can be carried by a conductor under specified conditions (Installation method, temperature,grouping,etc.)without its steady-state temperature exceeding a specified value (for example,90 ºCfor
This approach exploits Revit’s handling of generic hosts and cutting behaviours to facilitate desired outcomes with nested voids. It’s particularly useful in scenarios where direct
Systems that include integrations of computation, networking, and physical processes with feedback loops where physical processes affect computations and vice versa4. An example of a
ELI5-S1 BIM Basics E18_data Understanding Data in BIM: The Foundation of Smart Asset Management When we think about Building Information Modeling (BIM), it’s easy to
Data aggregation refers to a process that involves gathering information and expressing it in summary form for statistical analysis or other purposes. In many cases,
A data association is used to move data between data objects, properties, and activity and process inputs and outputs. The association connector style can be
centralized repository of information about data such as meaning, relationships to other data, origin, usage and formatNote 1 to entry: The definition is from IBM
Data objects provide information about the activities that must be performed and/or the results that they produce. Elements of data objects must be contained within
schema providing a data structure used to describe the properties of objects NOTE The relevant scope of the data template should be used together with
A deactivation request corresponds to a modification of the property. After validating of the deactivation request by the experts, the value of the calculated status
representation of a concept by a descriptive statement which serves to differentiate it from related concepts Note 1 to entry: A definition may be expressed as
part of the life cycle (3.2.10), during which an asset (3.2.8) is designed, constructed and commissioned [cited from ISO 19650-1:2018(en), 3.2.11] ISO 19650-2:2018 Standard dedicated to the delivery phase
In ISO 19650 the Delivery team term replaces the term ‘ Project Delivery team’ the meaning meant to remain the same, but the change puts
ELI5-S2 BIM in Practice E3 Delivery Team context of information exchange ELI5-S2: BIM in Practice E3: Delivery Team context of information exchange explained Understanding the
exchange of only changed information between two synonymous sources PAS 14191:2020
The rating factor Cd is applied to cable sizing calculations for cable installed in the ground. Its value varies according to the depth of lay
A contract type used in construction, typical characteristics: There is a single contract for design services and construction services; design and construction of the project
Design current or ‘Ib’ in Amperes.The level of current to be carried by a circuit in normal service.
Design Web Format (DWF), created by Autodesk. DWF is a compressed, non-editable, vector file format created by CAD and BIM applications. A DWF file can
A contract type There is a sequential award of two separate contracts; the first contract is for design services; the second contract is for construction;
Circuit Protective Device rating,or ‘In’ in Amperes. If the overload setting can be adjusted, then the ‘adjusted rating’ is known as ‘Ir’.
a process by which an innovation is communicated through certain channels over time among the members of a social system E.M. Rogers, Diffusion of Innovations,
The terminology such as digital built environment and smart asset management, often referred to as Digital Construction, encompasses multiple technologies and processes related to information
The terminology such as digital built environment and smart asset management, often referred to as Digital Construction, encompasses multiple technologies and processes related to information
Thank you #willmottdixon team at our London Southbank University project for the #opportunity to participate in the #BIM & #digitalconstruction campaign! #LSBU #WDI, #WES, #team,
Digital Plan Of Work (DPoW) forms a framework that supports informed and consistent decision making by project teams, at each work stage, helping to deliver
ELI5-S1 BIM Basics E19_Digital Twin “The digital twin is the virtual representation of a physical object or system across its life-cycle. It uses real-time data
https://www.linkedin.com/posts/willmottdixoninteriors_digital-construction-willmott-dixon-interiors-activity-6806218396632457216-h8PT
A dimension of space, such as width, height, or length. can be zero-dimensional (location point), one-dimensional (e.g. line, curve, path), two-dimensional (e.g. surface, face), or
Distributed Ledger Technology (DLT) is an encrypted and distributed database that serves as a register for storing records of transactions. At the core of DLT
An assembly containing protective devices associated with one or more outgoing circuits fed from an incoming circuit. In the ProDesign software,a distribution board (DB) may
It is often not desirable to size each conductor in a distribution system to support the total connected load at that point in the network.Diversity
area of activity covering a science, a technique, a material, etc.Note 1 to entry: A domain can be associated with a group to which the
DWG (“drawing format”) is a binary file format licensed by Autodesk and used for storing two and limited three-dimensional design data and metadata. It is
In environmental justice, ecocide is the criminalised activity of substantially harming or destroying ecosystems in their entirety or by harming individual species. At time of
correlation between the outcome and the resources used a measure of the utilization of resources to realize a given objective Note 1 to entry: An activity
In any office building, ensuring the safety and well-being of employees and visitors is of paramount importance. Emergency lighting plays a vital role in providing
An Emergency Voice Communication System (EVCS) or (EVC) is a fixed, monitored and maintained, bidirectional, full duplex voice communication system (Refuge system) designed to facilitate
Appointing party ISO 19650 term depends on where in the hierarchy the employer is located.The BS EN ISO 19650‑2 appointing party (A) is the equivalent
The PAS 1192 term Employer Information Requirements (EIR) has been replaced by Exchange Information Requirements (EIR) on projects where ISO 19650 standards are applicable. Employer’s
Tools that help design, develop, deliver, and maintain the built asset. You may require a number of different enabling tools for specific tasks and functions. https://www.thenbs.com/knowledge//periodic-table-of-bim
An end event denotes the point at which a process’s path will come to an end. End events can only result in a “throw” of
At the end of the process, this type of end indicates that a message is sent to a participant.[1] Symbol N Method and Style: A
I2t The energy let-through of a device in A2s. The total amount of energy let through by a protective device for a given level of
a person who designs and superintends the carrying out of civil engineering works, structures of buildings, installation of services, or who maintains such civil engineering works, structures or services https://www.iso.org/obp/ui#iso:std:iso:6707:-2:ed-3:v1:en:term:3.8.25
data type consisting of a set of named values called elements, members, enumeral, or enumerators ofthe type