ELI5-S2 BIM in Practice E3 Delivery Team context of information exchange ELI5-S2: BIM in Practice E3: Delivery Team context of information exchange explained Understanding the context of information exchange from
It is often not desirable to size each conductor in a distribution system to support the total connected load at that point in the network.Diversity is applied on the basis
An assembly containing protective devices associated with one or more outgoing circuits fed from an incoming circuit. In the ProDesign software,a distribution board (DB) may be single-phase or three-phase,and can
Circuit Protective Device rating,or ‘In’ in Amperes. If the overload setting can be adjusted, then the ‘adjusted rating’ is known as ‘Ir’.
Design current or ‘Ib’ in Amperes.The level of current to be carried by a circuit in normal service.
The rating factor Cd is applied to cable sizing calculations for cable installed in the ground. Its value varies according to the depth of lay installed. See BS7671:2018,Table4B4. Indicates the
Delivery phase [ISO1950] Delivery phase is a simplification of capital/delivery phase without making any assumption about how the project funding is being treated in financial accounting
In ISO 19650 the Delivery team term replaces the term ‘ Project Delivery team’ the meaning meant to remain the same, but the change puts the client (Appointing Party) outside
ELI5-S1 BIM Basics E19_Digital Twin “The digital twin is the virtual representation of a physical object or system across its life-cycle. It uses real-time data and other sources to enable
centralized repository of information about data such as meaning, relationships to other data, origin, usage and formatNote 1 to entry: The definition is from IBM Dictionary of Computing BS EN
area of activity covering a science, a technique, a material, etc.Note 1 to entry: A domain can be associated with a group to which the property […] applies. BS EN
A deactivation request corresponds to a modification of the property. After validating of the deactivation request by the experts, the value of the calculated status of the property changes to
schema providing a data structure used to describe the properties of objects NOTE The relevant scope of the data template should be used together with the term “data template”. E.g.
exchange of only changed information between two synonymous sources PAS 14191:2020
Digital Plan Of Work (DPoW) forms a framework that supports informed and consistent decision making by project teams, at each work stage, helping to deliver agreed and reliable information. The
a process by which an innovation is communicated through certain channels over time among the members of a social system E.M. Rogers, Diffusion of Innovations, Free Press, New York, 1995.
An internationally recognized green building certification system confirms the level of the sustainability performance of an asset. Confirming the level at which the asset was designed and built using strategies
Distributed Ledger Technology (DLT) is an encrypted and distributed database that serves as a register for storing records of transactions. At the core of DLT is a data model that
part of the life cycle (3.2.10), during which an asset (3.2.8) is designed, constructed and commissioned [cited from ISO 19650-1:2018(en), 3.2.11] ISO 19650-2:2018 Standard dedicated to the delivery phase
ELI5-S1 BIM Basics E18_data Understanding Data in BIM: The Foundation of Smart Asset Management When we think about Building Information Modeling (BIM), it’s easy to get lost in the complexity
The Open Data Institute (ODI) defines open data as information that is licensed for anyone to use for any purpose at no cost. Open data can be accessed, used and
Data aggregation refers to a process that involves gathering information and expressing it in summary form for statistical analysis or other purposes. In many cases, data aggregation is exclusively done
representation of a concept by a descriptive statement which serves to differentiate it from related concepts Note 1 to entry: A definition may be expressed as natural language text (a textual
The terminology such as digital built environment and smart asset management, often referred to as Digital Construction, encompasses multiple technologies and processes related to information or project management and the
The terminology such as digital built environment and smart asset management, often referred to as Digital Construction, encompasses multiple technologies and processes related to information or project management and the
A contract type There is a sequential award of two separate contracts; the first contract is for design services; the second contract is for construction; design and construction of the
A contract type used in construction, typical characteristics: There is a single contract for design services and construction services; design and construction of the project may be in sequential phases
Design Web Format (DWF), created by Autodesk. DWF is a compressed, non-editable, vector file format created by CAD and BIM applications. A DWF file can represent sheets for plotting purposes