Themaximum value of earth fault loop impedance (Zs) that will allow the protective device in a circuit to disconnect an earth fault within the prescribed time. Example: if themaximum earth
An electronic, three-dimensional representation of built asset or facility elements with associated intelligentattribute data (“Facility Data”). A Model term used in PAS 1192 specification has been replaced by term ‘Information
One or more specific information exchange requirements may necessitate the need for a model view definition (MVD). A machine-readable representation of MVDs is required when using them in software development.
coordinated activity of an organization to realize value from assets Note 1 to entry: Realization of value will normally involve a balancing of costs, risks, opportunities and performance benefits.Note 2
A merge request corresponds to the creation of one property and the deactivation of several properties. After validation of the merge request by the experts, the merged properties are deactivated.
The procedure to remove duplicate properties shall be carried out on the relevant attributes. The management of duplicates cannot be fully automated. BS EN ISO 23386:2020
change that affects the meaning, function or intended useNOTE Definition applies to properties and groups of properties.PAS 14191:2020
ELI5-S1: BIM Basics E6: Metadata explained Understanding Metadata in Building Information Modeling (BIM) Metadata provides critical information about an item’s content, making it easier to locate and work with specific
change that does not affect the meaning, function or intended use NOTE 1 Definition applies to properties and groups of properties.NOTE 2 Examples of this type of change are new
a current state of development of an organisation to utilise information in an advanced strategic manner to increase productivity, measured against an assumed optimal state
An MPDT its old PAS 1192 term, the MPDT defines who produces what, when and to what level of detail. The recent publication of ISO 19650 standards does not include
adoption model which identifies three diffusion dynamics top-down, bottom-up and middle-out Macro-Diffusion Dynamics model v1.1 (full size, current version). Macro-BIM adoption: Conceptual structures http://bit.ly/BIMPaperA8
a measure of an organisation’s readiness and capability expressed through its people, workflows, information, technologies and the reliable measurement procedures that are in place [source: Understanding Organizational Maturity
Argument introduced by Miller, G. A., suggests that the number of objects an average human can hold in short-term memory is 7 ± 2.[1] From a practical standpoint, this means
A document (or part of a document) identified in the Information Particulars setting out the security requirements for carrying out the Works in a security-minded way, including any policies, protocols,
A plan for the Mobilization of the Delivery Team’s resources in accordance with the Information Standard which is contained in the Appointment or, if no Mobilization Plan is contained in
Digital Model(s) created from shop drawings to support fabrication and installation. Fabrication models are reviewed and approved by the A/E for conformance to design specifications.1 1 The Massachusetts Port Authority,
The purpose of a project schedule is to define how the project should be delivered and maintained based on the available resources. The development of a timetable is the first
The Master Information Delivery Plan (MIDP) is the primary plan for the preparation of project information (from the supplier’s perspective), which is set out as being required in the Exchange
A process of developing a 3D model of the existing conditions for an asset, or a specific area within a facility.The model can be developed based on laser scanning surveys
3D models shall be synchronized with the central cloud model after daily work is done to ensure the rest of the project team are coordinating with the latest information. All
4D Modelling also referred to as 4D BIM, when supported by existing planning techniques, can improve project delivery times and schedules. To make the gains possible, all project members must
BIM at Maturity Stage 2 according to the ISO 19650 Framework is “the use of a shared digital representation of a built asset to facilitate design, construction and operation workflows
Risk management provides an overview of using risk analysis as an organized method for identifying and measuring risks. How to effectively assemble and manage a project team and effectively assemble
A message flow depicts the exchange of messages between two participants who are ready to send and receive them. A message flow must connect two distinct pools. They are either
The example checklist consists of checks which assure quality within models and information, to eliminate errors and achieve desired project outcomes. Table 1 – Model Validation Checklist Check Definition Project
information delivery manual (IDM) Documentation that captures the business process and specifies in detail the information that a user performing a particular role is required to provide at a particular
Introduction Sustainability in terms of Building Information Modelling (BIM) was defined as the sixth dimension of BIM by a large consulting firm as “what to do in terms of sustainability”[1]