Project Implementation Plan (PIP)

The Project Implementation Plan (PIP) it is a PAS 1192 term that should assist in establishing of the supply chain’s capability. In summary, it consists of the supplier’s: BIM assessment

Read More »

Physical Asset

A physical asset is an item of economic, commercial, or exchange value that has a material existence.Physical assets are also known as tangible assets.For most businesses, physical assets usually refer

Read More »

Product Data Definition

A Product Data Definition (PDD) document intended to provide a consistent methodology for the definition, creation, management and sharing of product information throughout the life cycle of an asset, based

Read More »

PAS 1192-7

The latest message related to PAS 1192-7 is a tweet from Paul Surin is that PAS1192-7 confirming that CPNI and  BSI have agreed to cease the development of PAS 1192-7.

Read More »

Project Information Standards

Project Information standards shall be covered within the BIM Execution Plan (BEP). Standards         In line with BIM Goals and Uses to ensure continuity that information containers are structured, coordinated, managed

Read More »

Project BIM Coordinator

Responsible, during the design stages, for executing, managing and running clash detection of the federated Project Information Model (PIM), and federating and QA reviewing the Asset Information Model (AIM) for

Read More »

Project Information Manager

Responsible for extraction, review, coordination and reporting of data within the native and federated models as well as associated project databases throughout the project stages to ensure client and BEP

Read More »
Dictionary
Jarek Wityk

PUBLISHED

Information accepted by the nominated party, in which case it will be suitable for tender or construction (2D model output only). Such that the ‘Published’ area should be maintained in

Read More »

Periodic Model Quality Control Checks

Apart from the weekly model coordination effort that focuses on spatial coordination and clash resolution, the Appointment BIM Manager should review all disciplines project models and ensure compliance with BEP

Read More »

Pre-appointment BEP

Pre-appointment BEPs communicates the delivery team’s intended approach to the information management process in the project, it is submitted as part of the prospective Lead Appointed Party tender response. For

Read More »

Project setup

During project setup phase It is essential to establish and analyse a timeline that guides the entire team in delivering the project on time. Thus the prospective Lead Appointed Party

Read More »

Pool

A pool is a graphical representation of a collaboration participant. A pool serves as a container for the sequence flows that occur between activities (of a contained process). The sequence

Read More »

Parametric behaviour

The parametric behaviour of an object describes whether its shape, position, and orientation are designed to be dependent on other information associated with the object or the context in which

Read More »
On this page

    share this page