Key Updates and Amendments

Arc Fault Detection Devices (AFDDs) - Regulation 421.1.7

Amendment 2 (2022) Changes:
BS 7671:2018+A2:2022 introduced mandatory AFDD requirements for single-phase AC final circuits supplying socket outlets with rated current not exceeding 32A in specific high-risk premises [1] [2] [3] [4]:

  • Higher Risk Residential Buildings (HRRB) – buildings at least 18 metres in height or 7+ storeys with 2+ residential units

  • Houses in Multiple Occupation (HMO)

  • Purpose-built student accommodation

  • Care homes

For all other premises, AFDDs remain recommended only [4] [5]. This represents a significant shift from the previous voluntary approach to mandatory compliance for these specific building types, directly impacting domestic/residential installations in higher-risk categories.

Amendment 3:2024 Impact:
The new Regulation 530.3.201 requires proper selection of bidirectional vs unidirectional protective devices [6] [7] [8]. AFDDs must be marked to indicate directionality (“in”/”out”, “line”/”load”, or arrows) which affects their installation in circuits with solar PV or battery storage systems common in prosumer installations.

Surge Protection Devices (SPDs) - Section 534

May 2023 Corrigendum – Critical Changes:
The corrigendum addressed unintended consequences that were discouraging fire detection system installations [9]. Key deletions included:

  • Removed indent (ii) from Regulation 443.4.1 – which previously required SPDs for “failure of a safety service”

  • Deleted examples from Table 443.2 citing “alarm panels, computers and home electronics”

  • Removed references to “fire/security alarm systems” as sensitive equipment requiring SPD protection

Design Impact:
Fire detection and alarm systems no longer automatically require SPD protection solely by virtue of being safety services. However, SPDs may still be required based on specific risk assessments for lightning protection or equipment-generated transient overvoltages [9].

RCD Protection Requirements - Regulations 411.3.3 and 411.3.4

Amendment 2 Changes:

  • Regulation 411.3.3 expanded RCD protection to socket outlets rated up to 32A (previously 20A) [10] [11] [12]

  • New Regulation 411.3.4 mandates 30mA RCD protection for ALL lighting circuits in domestic premises [10] [11] [12]

  • An exception permits documented risk assessment to omit RCD protection in non-dwelling premises

Compliance Impact:
This significantly increases RCD requirements for domestic installations, requiring protection for both socket and lighting circuits – a substantial change affecting most residential electrical design decisions.

Fire-Resistant Wiring Supports - Regulation 521.10.202

Current Requirements:
Regulation 521.10.202 states: “Wiring systems shall be supported such that they will not be liable to premature collapse in the event of a fire”[13] [14] [15] [16].

Key Points:

  • Applies to entire installation, not just escape routes

  • Precludes use of non-metallic cable clips or cable ties as sole support means

  • Metallic cable containment systems deemed compliant

  • Essential for maintaining circuit integrity during fire events

Prosumer Installations - Part 8

New Part 8 Introduction:
BS 7671:2018+A2:2022 introduced entirely new Part 8 covering “Functional Requirements” with Chapter 82: Prosumer’s Low Voltage Electrical Installations [17] [18] [5] [19].

Prosumer Definition:
“Entity or party which can be both a producer and a consumer of electrical energy”[19] – typically buildings with solar PV, wind generation, battery storage, or EV charging systems.

Operating Modes:

  • Direct feeding mode (grid supply)

  • Island mode (local generation)

  • Reverse feeding mode (export to grid)

Key Requirements:

  • Enhanced energy management systems

  • Smart grid integration

  • Safety considerations for bidirectional power flows

  • Protection coordination across multiple sources

Regulatory Impact on Higher Risk Buildings

Gateway 2 and Gateway 3 Compliance Requirements

Gateway 2 (Pre-Construction):
Applications must demonstrate compliance with building regulations including [20] [21] [22]:

  • Detailed electrical design specifications conforming to current BS 7671

  • Competency evidence for electrical contractors and designers

  • Construction control plans ensure ongoing compliance

  • Change control procedures for design modifications

Gateway 3 (Pre-Occupation):
Requires completion certificate applications with evidence that [23] [24] [25]:

  • As-built installations match approved designs

  • All electrical systems comply with current BS 7671 requirements

  • Safety case documentation demonstrates electrical safety

  • Golden thread information provides complete electrical system records

Design Decision Impacts for Domestic/Residential Installations

Immediate Compliance Requirements:

  1. AFDD Installation: Mandatory for HRRB, HMO, student accommodation, and care homes – significant cost implications and panel space requirements [3] [4]

  2. Enhanced RCD Protection: All socket circuits ≤32A and lighting circuits in domestic premises require 30mA RCD protection [10] [11]

  3. Fire-Resistant Cable Support: All wiring systems require fire-resistant support materials throughout the installation [15] [16]

  4. Prosumer Integration: New installations with generation/storage require compliance with Part 8 requirements and proper bidirectional device selection [5] [19]

  5. SPD Assessment: While fire alarm requirements relaxed, specific risk assessment needed for lightning and equipment-generated overvoltages [9]

Cost and Design Implications:

  • Increased panel space requirements for AFDDs and additional RCDs

  • Higher specification cable support systems

  • Enhanced documentation and commissioning procedures

  • Mandatory competency demonstrations for Gateway submissions

  • Complex coordination requirements for prosumer installations

Gateway Process Impact:
The Building Safety Regulator now has direct oversight of electrical installations in HRBs, requiring detailed compliance evidence at both Gateway 2 (design) and Gateway 3 (completion) stages. This represents a fundamental shift from traditional building control processes to a more rigorous, documentation-heavy approach prioritising long-term safety and accountability [20] [22] [23].

These changes collectively represent the most significant updates to UK electrical installation standards in recent years, with particular emphasis on fire safety, arc fault protection, and integration of renewable energy systems in residential buildings.