Topics

    Consumer Unit

    Atype of single-phase board for the control and distribution of electrical energy, principally in domestic premises. In the ProDesign software,a consumer unit (CU) can be split into three sections,each with

    Read More »

    Competent person

    Aperson who possesses sufficient technical knowledge, relevant practical skills and experience for the nature of the electrical work undertaken and is able at all times to prevent danger and,where appropriate,

    Read More »

    Circuit Protective Conductor (CPC)

    Acircuit protective conductor (CPC) connects exposed-conductive-parts* of equipment to themain earthing terminal. *Conductive part of equipment,which can be touched and which is not normally live,but which can become live when

    Read More »

    Grouping rating factor (Cg)

    Grouping rating factor used for calculatingminimum required cable size. For cables installed in air, values for this factor are given BS7671:2018,Tables4C1,4C4,4C6.For ground installations, values are given in Table4C2. Grouping a

    Read More »

    Depth of lay rating Factor (Cd)

    The rating factor Cd is applied to cable sizing calculations for cable installed in the ground. Its value varies according to the depth of lay installed. See BS7671:2018,Table4B4. Indicates the

    Read More »

    Ground rating factor (Cc)

    The rating factor Cc = 0.9 is applied to cable sizing calculations for cables installed in the ground (Installation Methods 70 to 73). See BS7671:2018,Appendix 4,Sections3,4 and 5.1.1.

    Read More »

    Back-up Protection

    Circuit-breaker manufacturers publish tables showing combinations of pairs of circuitbreakers, one upstream,one downstream,where the downstream device can be used at a location where the prospective fault current (Ipf) is higher

    Read More »

    Cable k2s2

    k2s2 its an Energy withstand of cable in A2s. For example,a cable with a withstand of 12 x 104 A2s, can sustain without permanentdamage,a fault current of 1,000 A for

    Read More »

    Ambient temperature rating factor (Ca)

    Ambient temperature rating factor used for calculating theminimum required cable size. For cables installed in air, values for this factor are given in BS7671:2018 Table4B1.For ground installations, values are given

    Read More »
    Diagram comparing coordination failure and selective coordination between protective devices in an electrical system. The top section shows a 32Amp circuit tripping a 63Amp breaker, causing upstream devices rated 125Amp and 160Amp to disconnect unnecessarily. The bottom section demonstrates selective coordination, where a 125Amp device isolates the fault without affecting upstream devices rated 250Amp and 600Amp.
    Dictionary
    Jarek Wityk

    Breaking capacity

    IWE-S1-IWE- E8_Breaking Capacity of MCCB What is Breaking Capacity (kA) Breaking capacity, often referred to as short-circuit breaking capacity, is one of the most critical specifications of a protective device.

    Read More »

    Ambient temperature

    The temperature of the free air surrounding a cable,or in the case of cables installed in the ground, the temperature of the surrounding soil.For an enclosed method such as ‘In

    Read More »

    Adiabatic

    Adiabatic checks are required to determine whether conductorsmight be damaged by the thermal effects resulting from the level of calculated fault conditions.

    Read More »

    UK BIM Framework (roadmap)

    UK BIM Framework roadmap! Almost three years have passed since the first BS EN ISO19650-1 standard was published.A lot of work has been done; some people are upset about the

    Read More »
    How To
    Jarek Wityk

    COBie data drop

    COBie data drop Individual COBie data drops are the responsibility of Task Team BIM Managers, who must upload the required information containers in accordance with Exchange Information Requirements (EIR).The COBie

    Read More »
    Blog
    Jarek Wityk

    digital construction campaign!

    Thank you #willmottdixon team at our London Southbank University project for the #opportunity to participate in the #BIM & #digitalconstruction campaign! #LSBU #WDI, #WES, #team, #ConstructingPlainLanguage

    Read More »

    acceptance criteria

    evidence required for considering that requirements have been fulfilled [cited from ISO 19650-2:2018(en), 3.1.1.1] Information issued via the Common Data Environment (CDE) must comply with Project Information Requirements (PIR) outlined

    Read More »
    Blog
    Jarek Wityk

    PAS 1192 vs ISO 19650 terms

    Quick reference guide In here you can find a quick reference guide with PAS1192 and ISO 19650 terminology comparison. PAS references (superseded) ISO References (current) Pre-contract BEP Pre-appointment BEP Post-contract

    Read More »
    Blog
    Jarek Wityk

    Comparison of ISO 19650 Part 2 and 3

    Workflow comparison First, I constructed an information exchange process diagram based on ISO 19650 Part 2 dedicated to the delivery phase of an asset lifecycle (project delivery). Next, I have

    Read More »

    Pre-contract BEP

    On projects where ISO 19650 Framework has implemented a term, Pre-appointment BEP is used instead of the PAS 1192 term Pre-contract BEP. The meaning is the same, it communicates on

    Read More »

    Post-contract BEP

    This PAS 1192 term has been superseded by ISO 19650 term Post-appointment BEP. It is a BIM Execution Plan (BEP) which shall be re-submitted by the Lead Appointed Party and

    Read More »

    geometrical

    This is an ISO 19650 term which replaces the PAS1192 term “graphical”. Geometrical is more appropriate to describe spatial positioning and relationships

    Read More »

    Level of information need

    The term describes the details and amount of information required. It is a framework which defines the extent and granularity of data to be exchanged. The term related to information

    Read More »

    graphical

    The PAS1192 term has been replaced by ISO19650 term ‘geometrical’ Geometrical is more appropriate to describe spatial positioning and relationships

    Read More »
    Dictionary
    Jarek Wityk

    BIM Execution Plan (BEP)

    The purpose of the BIM Execution Plan (BEP) is to clearly define the actions required of each member of the project team in order to successfully deliver the BIM workflows

    Read More »