BIM Stages
ELI5-S1:BIM Basics: E13_Understanding BIM Stages Understanding BIM Stages: Transitioning from BIM Levels to a Modern Framework In the world of Building Information Modeling (BIM), we often come across terms like BIM Levels and BIM Stages. While BIM Levels have been the foundation for many professionals, the industry is gradually shifting towards the more comprehensive framework […]
Young Person
The term “Young Person” in the context of construction, Building Information Modeling (BIM), electrical engineering, or general engineering, typically refers to a younger individual, often a recent graduate or entry-level professional, working within these fields. Here’s a brief overview: In summary, Young Persons in construction, BIM, and engineering play a key role in driving innovation […]
coordination
execution of workflow in the correct sequence managed by the competent project team members working together to achieve common, albeit often multifaceted goal. Coordination often involves more than one party who interacts to reach a common goal. The process is characterised by transforming viewpoints beyond narrow self-interest into broader community-wide interests and actions. [1] Coordination is […]
acceptance criteria
evidence required for considering that requirements have been fulfilled [cited from ISO 19650-2:2018(en), 3.1.1.1] Information issued via the Common Data Environment (CDE) must comply with Project Information Requirements (PIR) outlined within the Responsibility Matrix to form part of project deliverables. As such, all information circulated via the CDE needs to comply with the following: Project […]
graphical
The PAS1192 term has been replaced by ISO19650 term ‘geometrical’ Geometrical is more appropriate to describe spatial positioning and relationships
non-graphical
This PAS1192 term is equivalent to the ISO19650 term ‘non-geometrical’
project client
In ISO19650, described as Appointing party
CDE area
ELI5-S1: BIM Basics E5: CDE areas and states Area and section imply moving information from one place to another. This is not necessary in a CDE. It is the state of the information container that is important, not where it is stored
Employer
Appointing party ISO 19650 term depends on where in the hierarchy the employer is located.The BS EN ISO 19650‑2 appointing party (A) is the equivalent of the PAS 1192‑2:2013 top‑level employer Lead Appointed party (Tier 1) Lead appointed party is not the same as design lead or construction lead in PAS 1192‑2. See 9.5.4.The BS […]
Appointing party
Appointing party term introduced in BS EN ISO 19650 it is meant to replace PAS 1192 term ‘Employer’ ISO 19650 term depends on where in the hierarchy the employer is located.The BS EN ISO 19650‑2 appointing party (A) is the equivalent of the PAS 1192‑2:2013 top‑level employer Who is an Appointing party? Technically speaking an […]