Business goals drive organisational outcomes, helping to keep the focus on the company’s important short and long term priorities. The goals must be defined, understood, tracked, analysed, and measured to
A document (or part of a document) identified in the Information Particulars setting out the security requirements for carrying out the Works in a security-minded way, including any policies, protocols,
means a risk register containing the risks associated with the timely delivery of information as may be identified in the Information Particulars and/or provided in accordance with the Information Standard.
A plan for the Mobilization of the Delivery Team’s resources in accordance with the Information Standard which is contained in the Appointment or, if no Mobilization Plan is contained in
Data aggregation refers to a process that involves gathering information and expressing it in summary form for statistical analysis or other purposes. In many cases, data aggregation is exclusively done
Lean Construction is the method of project management aiming to reduce waste on a project and improving the efficiency and quality of produced work [1]. The aim to reduce overproduction,
Target Value Designs (TVD) focus is on reducing the cost of a project without reducing the quality of the end product or extending the timetable. The team sets a cost
Set-Based Design commonly referred to as a set-based design innovation or set-based concurrent engineering. It is a product development approach where teams consider a wide range of design alternatives (a
Working with different teams is probably the most difficult part of the design process. It is important to note that a collaborative design process is not about someone else creating
The industrial IoT (IIoT) forms an integral part of Industry 4.0, and smart manufacturing refers to interconnected sensors, and other input/output devices linked to manufacturing applications, supporting industrial automation and
Equipment Clearance shall be modelled for use in interference management and maintenance access requirements. It is the minimum space adjacent to the equipment required to allow access for maintenance, installation
The non-graphical information attached to objects in the Model that defines various characteristics of the object. Facility Data can include properties such as parametric values that drive physical sizes, material
A collection of content libraries and supporting files that define and embody a BIM standard. A workspace includes BIM libraries such as wall types, standard steel shapes, furniture, HVAC fittings,
VISI acronym for Dutch standard for communication between partners in construction projects translates as Creating conditions for the implementation of ICT standardization for the construction industry [1] 1 Online Browsing
having a definite objective and strong desire to achieve it In the context of BIM, it describes a people-centric transformation, regarding information as an asset
In the context of BIM and Digital Construction, the term is referred to as institutional and personal inertia to change, one of the most common barriers to BIM implementation.
The terminology such as digital built environment and smart asset management, often referred to as Digital Construction, encompasses multiple technologies and processes related to information or project management and the
The terminology such as digital built environment and smart asset management, often referred to as Digital Construction, encompasses multiple technologies and processes related to information or project management and the
Model(s) based on Fabrication Shop Model(s) and installed conditions.1 1 1 The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and Horizontal Construction.
A request or offer resulting in a Reliable Promise and is ready to be placed on the Weekly Work Plan (WWP) for performance. An assignment must meet the characteristics for
Various key characteristics of CM@Risk include: there are separate contracts for design services and for construction services; the contract for construction services may be entered into at the same time
A building has successfully gone through the commissioning process when its equipment and systems have been examined and tested to perform as designed, and its operators have been trained to
A BIM is said to be geo-referenced when the BIM is located with respect to one of the standard geographic survey coordinate grids established to represent locations on the Earth’s
Integrated Project Delivery (IPD) is a collaboration of all parties, systems and practices to optimize and maximize project success. Defined by the American Institute of Architects, IPD is typically applied
Integrated Workplace Management System. Such systems incorporate powerful database capabilities to capture enterprise-level functions and serve as decision support tools at all organizational levels and throughout the whole building lifecycle.
The person or group that makes assignments to direct workers. Project Architect and ‘discipline lead’ are common names for last planners in design processes. ‘Superintendent’ or ‘foremen’ are common names
The collaborative, commitment-based planning system that integrates “should-canwill-did planning” (pull planning, make-ready look-ahead planning with constraint analysis, weekly work planning based upon reliable promises, and learning based upon analysis of
An organized implementation of Lean Principles and Tools combined to allow a team to operate in unison.[1] [1] The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and Horizontal Construction.
A short interval plan, based on the pull/phase plan, that identifies all the activities to be performed in the next 6 (or other) weeks. The 6W Look-Ahead Schedule (LAS) is
The purpose of a project schedule is to define how the project should be delivered and maintained based on the available resources. The development of a timetable is the first