Pre-contract BEP

On projects where ISO 19650 Framework has implemented a term, Pre-appointment BEP is used instead of the PAS 1192 term Pre-contract BEP. The meaning is the same, it communicates on

Read More »

Post-contract BEP

This PAS 1192 term has been superseded by ISO 19650 term Post-appointment BEP. It is a BIM Execution Plan (BEP) which shall be re-submitted by the Lead Appointed Party and

Read More »
Dictionary
Jarek Wityk

BIM Execution Plan (BEP)

The purpose of the BIM Execution Plan (BEP) is to clearly define the actions required of each member of the project team in order to successfully deliver the BIM workflows

Read More »

Information model

set of structured and unstructured information containers (3.3.12) [cited from ISO 19650-1:2018(en), 3.3.8] ISO 19650 framework concentrates specifically on the information model concept, a term that contains multiple types of information (geometrical

Read More »

Plain Language Questions (PLQ)

The publication of ISO 19650 set of standards replaces use of PLQ and instead introduce the term with exchange information requirements (EIR) and project information requirements (PIR). Project information requirements

Read More »

Responsibility matrix

a chart that describes the participation by various functions in completing tasks or deliverables [cited from ISO 19650-1:2018(en), 3.1.1] Responsibility matrix shall be developed to cover information management activities and

Read More »

Assignment matrix

Responsibility matrix [ISO19650] In ISO 19650 there is a principle to develop responsibility matrices to cover information management activities and information delivery. Responsibility matrix [PAS1192] The former is illustrated as

Read More »

Role

BIM roles are not necessarily related to specialist positions. It should be viewed as a function that could be fulfilled by more than one person and allow the transfer of

Read More »

area of competence

area of an expert’s […] proficiency and knowledge associated to one or several groups of properties BS EN ISO 23386:2020

Read More »

deactivation request

A deactivation request corresponds to a modification of the property. After validating of the deactivation request by the experts, the value of the calculated status of the property changes to

Read More »

replacement request

A replacement request corresponds to the creation of the property and the deactivation of the property it replaces. After validation of the replacement request by the experts, the replaced property

Read More »

fragmentation request

A fragmentation request corresponds to the deactivation of the property and the creation of several properties. After validation of the fragmentation request by the experts, the fragmented property is deactivated.

Read More »

merge request

A merge request corresponds to the creation of one property and the deactivation of several properties. After validation of the merge request by the experts, the merged properties are deactivated.

Read More »

Management of duplicates

The procedure to remove duplicate properties shall be carried out on the relevant attributes. The management of duplicates cannot be fully automated. BS EN ISO 23386:2020

Read More »

Product Data Template (PDT)

The document aimed to be used by manufacturers and consumers where information about a product, is collated in a standardised and structured way. The information is structured in the form

Read More »

Construction Products Regulation (CPR)

Construction Products Regulation (CPR) https://ec.europa.eu/growth/sectors/construction/product-regulation_en#:~:text=The%20Construction%20Products%20Regulation%20(CPR,the%20performance%20of%20construction%20products.

Read More »

exchange requirement (ER)

defined set of information units that needs to be exchanged to support a particular business requirementat a particular process phase (or phases)/stage (or stages) BS EN ISO 29481-1:2017

Read More »

Permitted Purpose

A submittal state defining the intent or suitability. Permitted Purpose means any purpose related to the Works (and/or (without limitation) the construction, refurbishment, extension, operation, management and/or maintenance of the

Read More »

Required Standard

means the level of skill and care applicable to the Party’s equivalent obligation under the Appointment. [1] [1] UK BIM Framework, 2020. Information protocol to support BS EN ISO 19650-2

Read More »

Conditions of Satisfaction

An explicit description by a Customer of all the actual requirements that must be satisfied by the Performer in order for the Customer to feel that he or she received

Read More »

Existing Conditions Modeling

A process of developing a 3D model of the existing conditions for an asset, or a specific area within a facility.The model can be developed based on laser scanning surveys

Read More »

Supporting Information

Supporting information shall be used where applicable and relevant to fully understand and evaluate information requirements or acceptance criteria. Supporting information includes but is not limited to: Existing site surveys

Read More »

Risk management

Risk management provides an overview of using risk analysis as an organized method for identifying and measuring risks. How to effectively assemble and manage a project team and effectively assemble

Read More »
On this page

    share this page