Information Controller

Responsible for setup and management of the Common Data Environment (CDE), document submission, RFI and other project document transactions.

[Appointment: Lead Appointed Party Information Controller, site-based/office based.]

[source] PDE 4301 Technical BIM Management 2019/2020, BIM EXECUTION PLAN, SUP-GPF-XX-XX-SP-W-0001, Post-appointment BEP, Grat To King Yeung, Jarek Wityk, Mike Sealey, Tala Damra, Viorel Mihailuc, Willow Williams

Cross-sectional view of a residential buildingโ€™s fire core, showing protected stairwells, lift shafts, fire-rated partitions, and service risers enclosed within fire-resistant construction, designed to maintain vertical compartmentation and safe evacuation routes during a fire.
How To
Jarek Wityk

Secondary Supply – diverse cable route

This guidance covers the routing of secondary supply cables from a life safety generator to the ATS (Automatic Transfer Switch), and the final equipment with reference to:

BS 7671:2018+A2:2022, specifically Section 560: Safety Services

BS 8519:2020, with emphasis on Clause 7 (Cable Routing) and Clause 11 (Cable Selection)

The goal: clarify requirements for the diverse cable routing and maintain circuit integrity under fire conditions for systems that support life safety and fire-fighting applications, such as sprinkler pumps, fire-fighting lifts, and smoke control systems.

Read More ยป

share this page

Leave a Reply

Your email address will not be published. Required fields are marked *