The Ultimate BIM Knowledge Hub
Your one-stop resource for BIM electrical.
Revit Guides
Data Management
ELI5
Architecture, Engineering, Construction and Operation (AECO)
Architecture, Engineering, Construction and Operation usually expressed as acronym AECO is an extension of the Architecture, Engineering, Construction (AEC). Both terms are related to the entire built environment, not just
Infrastructure
the structures that emphasize, organise and enable social functions. Individual units of infrastructure are known as assets. It is sometimes subcategorised into economic infrastructure, the networks of built assets that
Problem Solving Process
ELI5-S2: BIM in Practice E7: problem solving process explained Understanding the Problem-Solving Process Effective problem-solving is at the heart of success in any field. Drawing inspiration from the book “General
verification
confirmation, through the provision of objective evidence, that specified requirements have beenfulfilled [SOURCE: BS EN 17412‑1:2020] Verification is the process of checking that the product/service meets the specification, it will
BS EN ISO 41001:2018
Facility management Management systems Requirements with guidance for use ISO 41001 and the vocabulary published as ISO 41011 is a Facilities Management Standard developed by the International Organizational Standards (ISO)
BS EN ISO 12006-2:2020
Building construction – Organization of information about construction works Part 2: Framework for classification

Information Interoperability
Information overload What makes construction management so challenging is the sheer amount of information available, the volume of the data means that we are often not able to extract or
Status
Identifier indicating the characteristic of an element of information for which at all times a value can be established. Word status has been included in ISO 19650 Framework meant to
Model
An electronic, three-dimensional representation of built asset or facility elements with associated intelligentattribute data (“Facility Data”). A Model term used in PAS 1192 specification has been replaced by term ‘Information

The importance of Information Requirements to a successful Asset Information Management (AIM) System
Introduction One of the challenges is the Appointing Party’s difficulties with the development of successful Operational Information Requirements in relation to asset management. Understanding the business challenges that define the

Common Data Environment (CDE)
ELI5-S1: BIM Basics E2: CDE Explained The purpose of using Common Data Environment (CDE) on a project is to provide the right person with the right information at the right
Construction Operation Building information exchange (COBie)
COBie is a non-proprietary data format for the publication of a subset of building information models (BIM) that focuses on delivering asset data rather than geometric information. It is formally
life cycle
stages and activities spanning the life of the system from the definition of its requirements to thetermination of its use, covering its conception, development, operation, maintenance support and disposal NOTE
Sub-Process (Collapsed)
The diagram does not show the details of the sub-process. A “plus” sign in the shape’s lower-left corner indicates that the activity is a sub-process with a lower level of
Required Standard
means the level of skill and care applicable to the Party’s equivalent obligation under the Appointment. [1] [1] UK BIM Framework, 2020. Information protocol to support BS EN ISO 19650-2
Tier 3
In the construction industry, Tier 3 is a sub-contractor referred in ISO 19650 as the Appointed party and Task Team, with a sub-contract who provides goods or services directly to
Capital delivery phase
Delivery phase [ISO1950] Delivery phase is a simplification of capital/delivery phase without making any assumption about how the project funding is being treated in financial accounting
objective
results to be achieved The objective can be strategic or operational; it can relate to different disciplines such as financial, health and safety, or environmental. The targeted results can be
TT system
A system having one point of the source of energy directly earthed, the exposedconductive-parts of the installation being connected to earth electrodes electrically independent of the earth electrodes of the
Construction Products Regulation (CPR)
Construction Products Regulation (CPR) https://ec.europa.eu/growth/sectors/construction/product-regulation_en#:~:text=The%20Construction%20Products%20Regulation%20(CPR,the%20performance%20of%20construction%20products.
Industry Foundation Classes (IFC)
conceptual data schema and exchange file format for building information modelling (BIM) data BS EN ISO 23387:2020 In general, IFC, or “Industry Foundation Classes”, is a standardized, digital description of
data dictionary
centralized repository of information about data such as meaning, relationships to other data, origin, usage and formatNote 1 to entry: The definition is from IBM Dictionary of Computing BS EN
open interoperability
the meaning and benefits: single procurement of information that can be relied upon over time, removing the need for it to be repeatedly re-procured; a ‘Golden Thread’ of information to
Integrated Project Delivery
Integrated Project Delivery (IPD) is a collaboration of all parties, systems and practices to optimize and maximize project success. Defined by the American Institute of Architects, IPD is typically applied

Organisational capability
Potential and expertise suggesting ability. Capability implies an organisation’s capacity to engage in a range of constructive activities Organisational capability is also referred to as organisational competence, although a capability refers to the
Tier 2
In the construction industry, Tier 2 is a Contractor referred in ISO 19650 as the Appointed party with a sub-contract who provide goods or services directly to the Lead Appointed
Intermediate Event (Message/Throwing)
A message intermediate event can be used to both send and receive messages. The event marker must be filled when used to “throw” the message (see the upper figure on
Periodic Model Quality Control Checks
Apart from the weekly model coordination effort that focuses on spatial coordination and clash resolution, the Appointment BIM Manager should review all disciplines project models and ensure compliance with BEP
Parametric behaviour
The parametric behaviour of an object describes whether its shape, position, and orientation are designed to be dependent on other information associated with the object or the context in which

The role of management in BIM implementation at a project and organisational level
Introduction While comparing the experience of working in smaller practices fulfilling the combined role of designer shared with BIM leadership position, and the experience of dedicated BIM management role within

Life Safety Generator
Life Safety Generator selection guide Copy If the secondary power supply is provided for firefighter’s lift, it must be capable of operating the firefighter’s lift at its full rated load
Work standards and workflows
Project management focuses on project completion by the execution of various processes. Most of the workflows comprising repetitive tasks can be optimised by applying workflow management systems. Automation-optimized business processes
Device rating (In)
Circuit Protective Device rating,or ‘In’ in Amperes. If the overload setting can be adjusted, then the ‘adjusted rating’ is known as ‘Ir’.
Design Web Format
Design Web Format (DWF), created by Autodesk. DWF is a compressed, non-editable, vector file format created by CAD and BIM applications. A DWF file can represent sheets for plotting purposes
The Gemini Principles
Purpose: Must have clear purpose Public good Must be used to deliver genuine public benefit in perpetuity Value creation Must enable value creation and performance improvement Insight Must provide determinable
Working Group (WG)
WORKING GROUP (WG) Specialized group within a committee that is responsible for drafting a particular standard or set of deliverables. It is usually quite small, composed of experts and headed by

Restricted and Highly Restricted information
Info Below you can find a couple of sample notes intended to be copied and pasted to a transmittal when sharing Restricted and Highly Restricted information. Restricted Information This transmittal
NWC
NWC is a cache file. “When you open a CAD file in Navisworks, by default, a corresponding cache file (NWC) is created, which contains all of the conversion details required
digitalconstruction campaign!
https://www.linkedin.com/posts/willmottdixoninteriors_digital-construction-willmott-dixon-interiors-activity-6806218396632457216-h8PT

change strategy
Concept of change strategy involves identifying objectives, formulating intervention concepts for change, forming and defining success parameters, and implementing strategies. This includes testing the effectiveness of the changes and their
k Factor
Factors for conductor materials from BS7671:2018,Table43.1. Different values are given for different types of conductor and insulatingmaterials. k2s2 used in adiabatic calculations gives the short-time withstand of a conductor in

BIM Functions
ELI5-S1 BIM Basics E17_BIM Functions Understanding BIM Functions: A Simple Guide for Beginners Building Information Modeling (BIM) is transforming the construction industry by enabling better collaboration, design precision, and efficient

Electric Vehicle Charging Points
Active vs Passive Electric Charging Points Explained Active Charging Points Active charging points are fully wired and connected, ready-to-use charging points at parking spaces – an actual socket connected to

Digital twin
ELI5-S1 BIM Basics E19_Digital Twin “The digital twin is the virtual representation of a physical object or system across its life-cycle. It uses real-time data and other sources to enable
BS EN ISO 19650-2:2018
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) — Information management using building information modelling Part 2: Delivery phase of the assets
Assignment
A request or offer resulting in a Reliable Promise and is ready to be placed on the Weekly Work Plan (WWP) for performance. An assignment must meet the characteristics for

client
actor (3.2.1) responsible for initiating a project and approving the brief [cited from ISO 19650-1:2018(en), 3.2.5] The UK BIM Alliance, responding to the inconsistency between the current guidance of CIC BIM Protocol,
Risk Register
means a risk register containing the risks associated with the timely delivery of information as may be identified in the Information Particulars and/or provided in accordance with the Information Standard.
Building Research Establishment Environmental Assessment Method (BREEAM)
It is a UK green building certification system, launched in 1990 by the Building Research Establishment (BRE), similar to LEED. Both systems confirm the level of the sustainability performance of