UK BIM Alliance responding to the inconsistency between current guidance of CIC BIM Protocol, Second Edition 2018 and ISO 19650 Framework published updated Information protocol to support BS EN
Max Zs
Themaximum value of earth fault loop impedance (Zs) that will allow the protective device in a circuit to disconnect an earth fault within the prescribed time. Example: if themaximum earth
Contractor’s proposals (CP)
Contractor’s proposals (CP) in AEC industry refer to documentation prepared by tenderers for design and build projects or on a traditional contract where the bidder is to design specific parts

Project Template_RVT_2024
Revit Electrical Project Template 2024 v24.1.1 Template For: Electrical Engineers, Bim Managers, Electrical Designers Setup: Typically 2–4 hours — quicker for experienced users. View Details Technical Details Released: Jul 24,
Handover
After the project is completed, the Appointing Party expects to receive Asset Information Model (AIM) compliant with the Exchange Information Requirements (EIR). The aim is to support the life
BIM thinking ahead
I decided to challenge myself and explore existing and emerging technologies in order to estimate what could we achieve during the next 30 years. The question is considered in terms
Existing Conditions Modeling
A process of developing a 3D model of the existing conditions for an asset, or a specific area within a facility.The model can be developed based on laser scanning surveys

Work in Progress (WIP)
A supply-chain management term describing partially finished information awaiting completion. In other words, the Information model is not to be used by any other project party. Before progression onto the next

volume
ELI5-S1: BIM Basics E10: Volume Strategy (spatial) explained a term defined by BS 1192:2007 means a spatial subdivision of a project to allow multiple people to work on Project Information
Working Group (WG)
WORKING GROUP (WG) Specialized group within a committee that is responsible for drafting a particular standard or set of deliverables. It is usually quite small, composed of experts and headed by
Furniture, Fixtures, Equipment (FFE)
Furniture, Fixtures, Equipment (FFE) a systems furniture layout within an asset
trigger event
a planned or unplanned event that changes an asset (3.2.8) or it’s status during its life cycle (3.2.10), which results in information exchange (3.3.7) [cited from ISO 19650-1:2018(en), 3.2.13]
Post-contract BEP
This PAS 1192 term has been superseded by ISO 19650 term Post-appointment BEP. It is a BIM Execution Plan (BEP) which shall be re-submitted by the Lead Appointed Party and
individual thing
the concept that classifies any real-world or imaginary thing that has an individuality that is not dependent on a commonality between things Note 1 to entry: This standard is about kinds
Grouping rating factor (Cg)
Grouping rating factor used for calculatingminimum required cable size. For cables installed in air, values for this factor are given BS7671:2018,Tables4C1,4C4,4C6.For ground installations, values are given in Table4C2. Grouping a

PUBLISHED
Information accepted by the nominated party, in which case it will be suitable for tender or construction (2D model output only). Such that the ‘Published’ area should be maintained in
Message Flow
A message flow depicts the exchange of messages between two participants who are ready to send and receive them. A message flow must connect two distinct pools. They are either
Ambient temperature rating factor (Ca)
Ambient temperature rating factor used for calculating theminimum required cable size. For cables installed in air, values for this factor are given in BS7671:2018 Table4B1.For ground installations, values are given
Project Information Manager
Responsible for extraction, review, coordination and reporting of data within the native and federated models as well as associated project databases throughout the project stages to ensure client and BEP
information requirement
The information needed to support a business or other activity. specification for what, when, how and for whom information (3.3.1) is to be produced [cited from ISO 19650-1:2018(en), 3.3.2] Term directly related to:
Mobilization Plan
A plan for the Mobilization of the Delivery Team’s resources in accordance with the Information Standard which is contained in the Appointment or, if no Mobilization Plan is contained in
Capital delivery phase
Delivery phase [ISO1950] Delivery phase is a simplification of capital/delivery phase without making any assumption about how the project funding is being treated in financial accounting
Subject to Simultaneous Overload
Where circuits are grouped, there are two availablemethods of calculating the rating factor Cg to be applied: [BS7671:2018,Appendix 4,5.1.2:Equation 2] [BS7671:2018,Appendix 4,5.1.2:Equation 3,4]
Two Stage Open Book
A procurement method introduced by Constructing Excellence and the Cabinet Office where a client invites prospective integrated teams to bid for a project based on their ability to deliver an outline brief
Risk management
Risk management provides an overview of using risk analysis as an organized method for identifying and measuring risks. How to effectively assemble and manage a project team and effectively assemble

Level of information need
Ever feel like you’re drowning in BIM data you don’t need, or scrambling for details that should’ve been there? Enter the concept of Level of Information Need. It’s a straightforward idea buried behind a not-so-straightforward name (looking at you, BS EN ISO 7817-1:2024). In plain English, a Level of Information Need defines exactly what information should be delivered – no more, no less – for a given BIM use case or project stage.
Asset Information Requirements (AIR)
Term introduced by ISO 19650 set of standards is related to information required during the operation phase of an asset AIR define managerial, commercial and technical aspects of information production,
objective
results to be achieved The objective can be strategic or operational; it can relate to different disciplines such as financial, health and safety, or environmental. The targeted results can be

jet reaction
nozzle reactionforce acting in the opposite direction to the water stream leaving the nozzle BS 4422 2005 “Jet reaction,” also known as “nozzle reaction,” is a fundamental concept in fluid
Information Controller
Responsible for setup and management of the Common Data Environment (CDE), document submission, RFI and other project document transactions. [Appointment: Lead Appointed Party Information Controller, site-based/office based.] [source] PDE 4301
BIM Strategic Lead
Responsible for project strategic direction from the tender stage, guides project set up and advises on the project when needed. Typical Lead Appointed Party BIM staff duties include: Development of

Please can you confirm if the life system system has to be lidded?
Please can you confirm if the life system system has to be lidded? There is no requirement for the life system to be lidded. A lid is effectively required
Risk Register
means a risk register containing the risks associated with the timely delivery of information as may be identified in the Information Particulars and/or provided in accordance with the Information Standard.

BIM Execution Plan (BEP)
The purpose of the BIM Execution Plan (BEP) is to clearly define the actions required of each member of the project team in order to successfully deliver the BIM workflows
interoperability
the ability of two or more systems* to exchange information and to use the information that has been exchanged. definition adapted from the one contained in ‘ISO/TS 27790:2009, Health informatics—
National BIM Standard
National BIM Standard (NBIMS) – United States Version 2 is sponsored by National Institute of Building Sciences (NIBS) under its BuildingSMART Alliance Council. [1] [1] The Massachusetts Port Authority, 2015.
security
state of relative freedom from threat (3.13) or harm caused by deliberate, unwanted, hostile or malicious acts [cited from ISO 19650-5:2020(en), 3.7]
Z2
Z2 – That part of the earth fault loop impedance which comprises the impedance under earth fault conditions of the circuit protective conductor (cpc) of the circuit under consideration.
BS EN 17412‑1:2020
Building Information Modelling — Level of Information NeedPart 1: Concepts and principles

Wiring in Protected Escape Route
Compliance with fire safety regulations in Firefighting Cores directly affects life safety and emergency response. This guide will help you meet the latest fire performance standards.

Organisational maturity
a measure of an organisation’s readiness and capability expressed through its people, workflows, information, technologies and the reliable measurement procedures that are in place [source: Understanding Organizational Maturity
UK National Annex 2021 Discipline vs Role
The field ‘Role’ has been renamed ‘Discipline’ in the most recent edition of BS EN ISO-2 19650-2:2018 NA February 2021. The previously used role codes, derived from BS 1192:2007, had
supply chain
Term used to describe the relationship between organisation that provide materials, products or services for the client. Referring to ISO 19650 Framework the supply chain is synonymous to a ‘delivery
Conformance Class
Conformance class allows establishing relations from the information model of BS EN 82045-2 to any other object of relevance available information model. For example, the Project Information Model (PIM) Conformance
Pool
A pool is a graphical representation of a collaboration participant. A pool serves as a container for the sequence flows that occur between activities (of a contained process). The sequence
Gateway (Parallel)
[And] When used to split the sequence flow, all outgoing branches are activated at the same time. When parallel branches are merged, it waits for all incoming branches to complete
Insurance Backed Alliancing
A new procurement method coupled up with Integrated Project Insurance model (IPI) is a framework which encourages and empowers project teams to work together. The procurement method introduced by Constructing Excellence
BIM Use
A Use Case is a description of an intended use of the BIM, along with a description of the type(s) of data that must be in the BIM in order

COBie data drop
COBie data drop Individual COBie data drops are the responsibility of Task Team BIM Managers, who must upload the required information containers in accordance with Exchange Information Requirements (EIR).The COBie