Harmonic

The presence of harmonic content in the line conductors of a three-phase and neutral circuit can give rise to excessive levels of load current in the neutral conductor.

Read More »

objective

results to be achieved The objective can be strategic or operational; it can relate to different disciplines such as financial, health and safety, or environmental. The targeted results can be

Read More »

Crown Commercial Services (CCS)

The Crown Commercial Service (CCS) is an administrative agency and trading fund of the Cabinet Office of the UK Government, responsible for the supervision of the procurement of common goods

Read More »

IDM standard

BS EN ISO 29481-1 Building information models – Information delivery manual (IDM) PD ISO/TS 12911:201

Read More »

Industry Foundation Classes (IFC)

conceptual data schema and exchange file format for building information modelling (BIM) data BS EN ISO 23387:2020 In general, IFC, or “Industry Foundation Classes”, is a standardized, digital description of

Read More »

Work standards and workflows

Project management focuses on project completion by the execution of various processes. Most of the workflows comprising repetitive tasks can be optimised by applying workflow management systems. Automation-optimized business processes

Read More »

replacement request

A replacement request corresponds to the creation of the property and the deactivation of the property it replaces. After validation of the replacement request by the experts, the replaced property

Read More »

TC 59

Technical Committee – Buildings and civil engineering works https://www.iso.org/committee/49070.html

Read More »

Appointee

    UK BIM Alliance responding to the inconsistency between current  guidance of CIC BIM Protocol, Second Edition 2018 and ISO 19650 Framework published updated Information protocol to support BS EN

Read More »
Dictionary
Jarek Wityk

Quality Control

Quality control indicates an operational activity within the process, while quality assurance focuses on constructing confidence that quality requirements will be met. Quality is incorporated into production and verified during

Read More »

BS 8541-1:2012

Library objects for architecture, engineering and constructionPart 1: Identification and classification – Code of practice Note: ISO 22014 and ISO 22057 are under development tosupersede BS 8541, parts 1-6.

Read More »

Group

Because a group is not an activity or a flow object, it cannot connect to sequence or message flows. Furthermore, groups are not constrained by pool and lane restrictions. [1]

Read More »

Master Schedule

The purpose of a project schedule is to define how the project should be delivered and maintained based on the available resources. The development of a timetable is the first

Read More »
Dictionary
Jarek Wityk

BIM Functions

ELI5-S1 BIM Basics E17_BIM Functions Understanding BIM Functions: A Simple Guide for Beginners Building Information Modeling (BIM) is transforming the construction industry by enabling better collaboration, design precision, and efficient

Read More »
Common Data Environment (CDE)
Jarek Wityk

CDE area

ELI5-S1: BIM Basics E5: CDE areas and states Area and section imply moving information from one place to another. This is not necessary in a CDE. It is the state

Read More »

Appointing party

Appointing party term introduced in BS EN ISO 19650 it is meant to replace PAS 1192 term ‘Employer’ ISO 19650 term depends on where in the hierarchy the employer is

Read More »

Facility management (FM)

Facility management (FM) is an organizational function that integrates people and processes within the built environment to improve the functionality, comfort, safety, and efficiency of the core business.

Read More »

Ambient temperature rating factor (Ca)

Ambient temperature rating factor used for calculating theminimum required cable size. For cables installed in air, values for this factor are given in BS7671:2018 Table4B1.For ground installations, values are given

Read More »

attribute

Depending on the technology discussed, the term attribute can be treated as equivalent to a property or as a set of attributes, such as the number of elements in a

Read More »

systems thinking

System thinking is an approach to integration based on the idea that each component or part of a system acts differently when isolated from its environment and other parts of

Read More »

Heating, Ventilation and Air-Conditioning (HVAC)

Heating, Ventilation and Air-Conditioning (HVAC). All necessary heating, ventilation air-conditioning and specialty equipment, including air distribution ducts for supply, return, and ventilation and exhaust ducts, including control system, registers, diffusers,

Read More »
Instructions
Jarek Wityk

Project Template_RVT_2024

Revit Electrical Project Template 2024 v24.1.1 Template For: Electrical Engineers, Bim Managers, Electrical Designers Setup: Typically 2–4 hours — quicker for experienced users. View Details Technical Details Released: Jul 24,

Read More »

Pool

A pool is a graphical representation of a collaboration participant. A pool serves as a container for the sequence flows that occur between activities (of a contained process). The sequence

Read More »

National Annex (NA)

With reference to BS EN ISO 19650 Framework, the working group could not conclude on international codification and standardised conventions. Hence Paul Shillcock and David Churcher, the lead authors, came

Read More »

security

state of relative freedom from threat (3.13) or harm caused by deliberate, unwanted, hostile or malicious acts [cited from ISO 19650-5:2020(en), 3.7]

Read More »

Z1

Z1 – That part of the earth fault loop impedance which comprises the impedance under earth fault conditions of the line conductor of the circuit under consideration.

Read More »
BS EN ISO 19650 Part 2 & 3 Comparison diagram
Blog
Jarek Wityk

Comparison of ISO 19650 Part 2 and 3

Workflow comparison First, I constructed an information exchange process diagram based on ISO 19650 Part 2 dedicated to the delivery phase of an asset lifecycle (project delivery). Next, I have

Read More »

Grouping rating factor (Cg)

Grouping rating factor used for calculatingminimum required cable size. For cables installed in air, values for this factor are given BS7671:2018,Tables4C1,4C4,4C6.For ground installations, values are given in Table4C2. Grouping a

Read More »

Model Upload Workflow

3D models shall be synchronized with the central cloud model after daily work is done to ensure the rest of the project team are coordinating with the latest information. All

Read More »

graphical

The PAS1192 term has been replaced by ISO19650 term ‘geometrical’ Geometrical is more appropriate to describe spatial positioning and relationships

Read More »

smart asset management

The terminology such as digital built environment and smart asset management, often referred to as Digital Construction, encompasses multiple technologies and processes related to information or project management and the

Read More »

racetrack

Information delivery cycle It is a term introduced first in PAS 1192 and updated in ISO 19650 framework, it depicts the process of specifying and delivery of project and asset

Read More »
Blog
Jarek Wityk

VADs

Guide to Visual Alarm Devices (VADs) in Fire Safety In high-noise workspaces or locations requiring hearing protection, Visual Alarm Devices (VADs) play a critical role in fire safety. They ensure

Read More »

Infrastructure

the structures that emphasize, organise and enable social functions. Individual units of infrastructure are known as assets. It is sometimes subcategorised into economic infrastructure, the networks of built assets that

Read More »
Classification and Standardisation
Jarek Wityk

Organisational maturity

a measure of an organisation’s readiness and capability expressed through its people, workflows, information, technologies and the reliable measurement procedures that are in place [source: Understanding Organizational Maturity

Read More »

Lane

A lane is a sub-partition within a process (often within a pool) that runs the length of the process level, either vertically or horizontally. Lanes are frequently used for internal

Read More »

component

named and individually scheduled physical item and feature that might require management, such as inspection, maintenance, servicing or replacement, during the in-use phaseNote 1 to entry: Components can serve as

Read More »