The Ultimate BIM Knowledge Hub
Your one-stop resource for BIM electrical.
Revit Guides
Data Management
ELI5
BS 7000-10:2008
Design management systems Part 10: Vocabulary of terms used in design management
Last Planner System®
The collaborative, commitment-based planning system that integrates “should-canwill-did planning” (pull planning, make-ready look-ahead planning with constraint analysis, weekly work planning based upon reliable promises, and learning based upon analysis of
Z2
Z2 – That part of the earth fault loop impedance which comprises the impedance under earth fault conditions of the circuit protective conductor (cpc) of the circuit under consideration.
Management of duplicates
The procedure to remove duplicate properties shall be carried out on the relevant attributes. The management of duplicates cannot be fully automated. BS EN ISO 23386:2020
Ze
That part of the earth fault loop impedance which is external to the circuit under consideration. For the supply cable it will be the impedance external to the installation. For

Electrical & Mechanical Equipment Access and Maintenance
Electrical & Mechanical Equipment: Access & Maintenance (UK) “All controlgear shall be mounted so as to facilitate its operation and maintenance. Where a special tool is necessary to adjust, maintain,
Quality Planning (QP)
Quality Planning (QP) is a framework which specifies quality standards, practices, resources, and the sequence of activities The quality plan should define:[1] Objectives to be achieved A workflow that represents

The Museum of the Future
Introduction The idea to connect 3D CAD models with construction programs (4th Dimension) was formulated in 1986-87 when Bechtel collaborated with Hitachi Ltd to develop the 4D visual model[1] The
Portable document format (PDF)
It’s a versatile file format developed by Adobe that allows people to easily present and exchange documents – regardless of the software, hardware, or operating systems used by anyone who

The future of BIM Managers in the AEC Industry
The future of BIM Manager The ‘BIM Manager’ role is discussed here in broad terms of management, not confined into a specific BIM role.[1] The function of BIM Manager already

PUBLISHED
Information accepted by the nominated party, in which case it will be suitable for tender or construction (2D model output only). Such that the ‘Published’ area should be maintained in
Scope
Bid response should include a scope management plan containing all the tasks necessary for successful project delivery. The plan shall define the implementation and verification of workflows. A project should

client
actor (3.2.1) responsible for initiating a project and approving the brief [cited from ISO 19650-1:2018(en), 3.2.5] The UK BIM Alliance, responding to the inconsistency between the current guidance of CIC BIM Protocol,
Supplier
In the construction industry, ‘supplier’ refers to a provider of services or goods. The supplier can provide goods or services directly to the ultimate client or another supplier. The publication

Junction Boxes
Junction Box Requirements in Electrical Installations To ensure compliance with BS 7671:2018+A2:2022, the following requirements apply when using junction boxes in electrical installations: 1. Compliance with BS EN 60670-22 Any
Current-carrying capacity
Themaximum current which can be carried by a conductor under specified conditions (Installation method, temperature,grouping,etc.)without its steady-state temperature exceeding a specified value (for example,90 ºCfor cables with thermosetting insulation).

volume
ELI5-S1: BIM Basics E10: Volume Strategy (spatial) explained a term defined by BS 1192:2007 means a spatial subdivision of a project to allow multiple people to work on Project Information
Royal Institute of British Architects (RIBA)
RIBA Plan Of Work 2020 0 – Strategic Definition is about determining the best means of achieving the client’s requirements. An open mind is required because a building might not
Basic protection
Protection against electric shock under fault-free conditions;use of barriers,placing out of reach,and so forth.
data dictionary
centralized repository of information about data such as meaning, relationships to other data, origin, usage and formatNote 1 to entry: The definition is from IBM Dictionary of Computing BS EN
Construction Manager at Risk
Various key characteristics of CM@Risk include: there are separate contracts for design services and for construction services; the contract for construction services may be entered into at the same time
BS 8536-1:2015
Briefing for design and construction Part 1: Code of practice for facilities management (Buildings infrastructure)
merge request
A merge request corresponds to the creation of one property and the deactivation of several properties. After validation of the merge request by the experts, the merged properties are deactivated.

Comparison of ISO 19650 Part 2 and 3
Workflow comparison First, I constructed an information exchange process diagram based on ISO 19650 Part 2 dedicated to the delivery phase of an asset lifecycle (project delivery). Next, I have
geometrical
This is an ISO 19650 term which replaces the PAS1192 term “graphical”. Geometrical is more appropriate to describe spatial positioning and relationships

BIM Stages
ELI5-S1:BIM Basics: E13_Understanding BIM Stages Understanding BIM Stages: Transitioning from BIM Levels to a Modern Framework In the world of Building Information Modeling (BIM), we often come across terms like

coordination
Coordination goes beyond orderly task execution, it transforms individual perspectives into shared, community-wide actions. It’s not just a subset of collaboration; it’s the engine that makes collaboration more than a patchwork of solo efforts.
Competent person
Aperson who possesses sufficient technical knowledge, relevant practical skills and experience for the nature of the electrical work undertaken and is able at all times to prevent danger and,where appropriate,
Model Production Delivery Table (MPDT)
An MPDT its old PAS 1192 term, the MPDT defines who produces what, when and to what level of detail. The recent publication of ISO 19650 standards does not include
Residual Current Device (RCD)
AResidual Current Device (RCD) is amechanical switching device or association of devices intended to cause the opening of the contacts when the residual current* attains a given value under specified
Business goals
Business goals drive organisational outcomes, helping to keep the focus on the company’s important short and long term priorities. The goals must be defined, understood, tracked, analysed, and measured to
consensus
general agreement, characterized by the absence of sustained opposition to substantial issues by any important part of the concerned interests and by a process that involves seeking to take into
risk appetite
amount and type of risk that an organization is willing to pursue or retain [cited from ISO 19650-5:2020(en), 3.5]
Employer’s Information Requirements (EIR)
The PAS 1192 term Employer Information Requirements (EIR) has been replaced by Exchange Information Requirements (EIR) on projects where ISO 19650 standards are applicable. Employer’s information requirements (EIR) also use

single source of truth
In AEC industry with reference to information systems management, the single source of truth refers to Common Data Environment (CDE) The single source of truth is a method of structuring
Sub-process
A sub-process is a group of activities that are performed as part of a larger process or choreography. It is compound in the sense that it can be broken down

CPR Cable Classification Guide
Since July 2017, all power, control and communication cables permanently installed in buildings must comply with the Construction Products Regulation (CPR).
This guide is your reference for navigating Euroclass ratings, selecting compliant products.
Intermediate Event (Message/Throwing)
A message intermediate event can be used to both send and receive messages. The event marker must be filled when used to “throw” the message (see the upper figure on
Openness
in relation to data and information – also linked to interoperability means that it is provided or made available in a format that can be accessed and used withoutrecourse to
PAS 14191:2020
Built environment – Management and operation of interconnected construction data dictionaries Specification
Post-appointment BEP
Post-appointment BEP confirms and defines the delivery team’s approach to information management in the appointed project. It is a BIM Execution Plan (BEP) which shall be re-submitted by the Lead
Virtual Design and Construction
Virtual Design and Construction (VDC) is the use of design models and project information to apply construction processes in a virtual environment to reduce time, cost, and ensure design intent.
Model
An electronic, three-dimensional representation of built asset or facility elements with associated intelligentattribute data (“Facility Data”). A Model term used in PAS 1192 specification has been replaced by term ‘Information
Fabrication Model
Digital Model(s) created from shop drawings to support fabrication and installation. Fabrication models are reviewed and approved by the A/E for conformance to design specifications.1 1 The Massachusetts Port Authority,

Quality Management and Standards
Most articles start with a definition of quality management and then dive deep into Quality Control (QC) and Quality Assurance (QA). In here I concentrate on the quality, value and
Facility Lifecycle
This refers to the time span stretching from a building’s conception to demolition including the five distinctive phases (Planning, Design, Construction, Operations, and Disposition).1 1 The Massachusetts Port Authority, 2015.
Group
Because a group is not an activity or a flow object, it cannot connect to sequence or message flows. Furthermore, groups are not constrained by pool and lane restrictions. [1]
quantity
property of a phenomenon, body, or substance, where the property has a magnitude that can be expressed by means of a number and a reference. for example a measure with