The Ultimate BIM Knowledge Hub
Your one-stop resource for BIM electrical.
Revit Guides
Data Management
ELI5
Industry 4.0
Industry 4.0 is more than just manufacturing. Smart, connected technologies transform how we design, manufacture, use and maintain parts, products, and entire buildings. The interconnected technology also changes the way

How to respond to request for proposal (RFP)
Introduction It can be said that the digitalization of construction began with designers moving from drawing boards to computers. [1] In Architecture, Engineering, Construction and Operation (ACEO), the focus has
Computer aided facility management (CAFM)
Originally coined in the 60s, The acronym has become a catch-all for a wide range of Facilities Management platforms and software. A CAFM system can be broadly defined as a collaborative,
delivery phase
part of the life cycle (3.2.10), during which an asset (3.2.8) is designed, constructed and commissioned [cited from ISO 19650-1:2018(en), 3.2.11] ISO 19650-2:2018 Standard dedicated to the delivery phase

BS ISO 55000:2014
Asset management Overview principles and terminology The ISO 55000 standard integrates with other essential management systems by outlining definitions and terminologies for asset management. Published under the International Organization for

CDE state
ELI5-S1: BIM Basics E5: CDE areas and states This term replaces the ‘CDE area’ PAS 1192 term, the idea is the location of the information (container) is not important but
deactivation request
A deactivation request corresponds to a modification of the property. After validating of the deactivation request by the experts, the value of the calculated status of the property changes to
Additive manufacturing
Additive manufacturing (AM), also known as 3D printing, is the process of creating products by layering materials until a complete 3D object is created. The process can transform digital design
Virtual Design and Construction
Virtual Design and Construction (VDC) is the use of design models and project information to apply construction processes in a virtual environment to reduce time, cost, and ensure design intent.
National BIM Standard
National BIM Standard (NBIMS) – United States Version 2 is sponsored by National Institute of Building Sciences (NIBS) under its BuildingSMART Alliance Council. [1] [1] The Massachusetts Port Authority, 2015.

CPR Cable Classification Guide
Since July 2017, all power, control and communication cables permanently installed in buildings must comply with the Construction Products Regulation (CPR).
This guide is your reference for navigating Euroclass ratings, selecting compliant products.

The role of management in BIM implementation at a project and organisational level
Introduction While comparing the experience of working in smaller practices fulfilling the combined role of designer shared with BIM leadership position, and the experience of dedicated BIM management role within
Appointee
UK BIM Alliance responding to the inconsistency between current guidance of CIC BIM Protocol, Second Edition 2018 and ISO 19650 Framework published updated Information protocol to support BS EN
BS EN ISO 12006-3:2016
Building construction — Organization of information about construction works Part 3: Framework for object-oriented information
American Society of Heating, Refrigerating, and Air Conditioning Engineers (ASHRAE)
American Society of Heating, Refrigerating, and Air Conditioning Engineers (ASHRAE) is a professional organization that develops and promulgates system, measurement, and product engineering standards to the industry.1 1 The Massachusetts

Shared context of information exchange
ELI5-S2: BIM in Practice E1: Shared context of information exchange Introducing the “ELI5-S2 BIM in Practice” Series! Welcome to the first post in our new series, “BIM in Practice,” where
Post-contract BEP
This PAS 1192 term has been superseded by ISO 19650 term Post-appointment BEP. It is a BIM Execution Plan (BEP) which shall be re-submitted by the Lead Appointed Party and
Tier 2
In the construction industry, Tier 2 is a Contractor referred in ISO 19650 as the Appointed party with a sub-contract who provide goods or services directly to the Lead Appointed
efficiency
correlation between the outcome and the resources used a measure of the utilization of resources to realize a given objective Note 1 to entry: An activity is efficient if it minimizes

Volume strategy
ELI5-S1: BIM Basics E10: Volume Strategy (spatial) explained Introduction Volume Strategy enables information management, spatial coordination, and concurrent engineering, ultimately fitting together like a complex 3D jigsaw puzzle, where each

Mimic Panels for Life-Safety Generators
Mimic Panels for Life-Safety Generators – UK-Specific Designer’s Guide Key takeaway: Indicator for generators and smoke-control systems (commonly referred to as ‘mimic panel’, often marked “ESP – Emergency Stand-by Power
Final Circuit
A circuit connected directly to current-using equipment, or to a socket-outlets or other outlet points for the connection of such equipment.
Plain Language Questions (PLQ)
The publication of ISO 19650 set of standards replaces use of PLQ and instead introduce the term with exchange information requirements (EIR) and project information requirements (PIR). Project information requirements
Openness
in relation to data and information – also linked to interoperability means that it is provided or made available in a format that can be accessed and used withoutrecourse to
Post-appointment BEP
Post-appointment BEP confirms and defines the delivery team’s approach to information management in the appointed project. It is a BIM Execution Plan (BEP) which shall be re-submitted by the Lead
Subcommittee (SC)
a Subcommittee (SC), which addresses a specialized area within a TC; https://www.iso.org/glossary.html
consensus
general agreement, characterized by the absence of sustained opposition to substantial issues by any important part of the concerned interests and by a process that involves seeking to take into

Level of information need
Ever feel like you’re drowning in BIM data you don’t need, or scrambling for details that should’ve been there? Enter the concept of Level of Information Need. It’s a straightforward idea buried behind a not-so-straightforward name (looking at you, BS EN ISO 7817-1:2024). In plain English, a Level of Information Need defines exactly what information should be delivered – no more, no less – for a given BIM use case or project stage.
Project Information Standards
Project Information standards shall be covered within the BIM Execution Plan (BEP). Standards In line with BIM Goals and Uses to ensure continuity that information containers are structured, coordinated, managed
Information Delivery Manual (IDM)
information delivery manual (IDM) Documentation that captures the business process and specifies in detail the information that a user performing a particular role is required to provide at a particular
Facility management (FM)
Facility management (FM) is an organizational function that integrates people and processes within the built environment to improve the functionality, comfort, safety, and efficiency of the core business.
Appointment
Equivalent to PAS1192 term ‘Contract’ The more generic term appointment has been used in ISO 19650 instead of contract. This means one term can be used for both external contracts
Asset Information Model (AIM)
The Asset Information Model or AIM is a term used to define the set of information gathered from all sources that support the continuing management of an asset
risk appetite
amount and type of risk that an organization is willing to pursue or retain [cited from ISO 19650-5:2020(en), 3.5]

Management of the cyber-security threats in Common Data Environment
The increased reliance of the IT Technology Widely used cloud-based systems with file-sharing protocols have are the way of the future, but the use of such a platforms increase the
macro diffusion dynamics
adoption model which identifies three diffusion dynamics top-down, bottom-up and middle-out Macro-Diffusion Dynamics model v1.1 (full size, current version). Macro-BIM adoption: Conceptual structures http://bit.ly/BIMPaperA8
systems thinking
System thinking is an approach to integration based on the idea that each component or part of a system acts differently when isolated from its environment and other parts of
rationalise
In construction, to rationalise is to attempt to remove, explain or justify irrational quantities, processes or systems or else adjust unreasonable design decisions by employing logic or reason, (behaviour, attitude),
Lean construction
Lean Construction is the method of project management aiming to reduce waste on a project and improving the efficiency and quality of produced work [1]. The aim to reduce overproduction,
Two Stage Open Book
A procurement method introduced by Constructing Excellence and the Cabinet Office where a client invites prospective integrated teams to bid for a project based on their ability to deliver an outline brief
Navisworks file format (NWF)
When saving to a “Navisworks file format (NWF), only a list with pointers to the files currently loaded is saved, along with the scene’s environment, the current view, clash results,
exchange requirement (ER)
defined set of information units that needs to be exchanged to support a particular business requirementat a particular process phase (or phases)/stage (or stages) BS EN ISO 29481-1:2017
Cyber-Physical Systems
Systems that include integrations of computation, networking, and physical processes with feedback loops where physical processes affect computations and vice versa4. An example of a Cyber-Physical System is a Digital

coordination
Coordination goes beyond orderly task execution, it transforms individual perspectives into shared, community-wide actions. It’s not just a subset of collaboration; it’s the engine that makes collaboration more than a patchwork of solo efforts.

Restricted and Highly Restricted information
Info Below you can find a couple of sample notes intended to be copied and pasted to a transmittal when sharing Restricted and Highly Restricted information. Restricted Information This transmittal
Architecture, Engineering and Construction (AEC) integration with Industry 4.0
The meaning of the term Industry 4.0 has not been concluded. There is a level of ambiguity of what it means for the construction industry[1] According to Jim Mansfield,
BS 7799‑3:2017
Information security management systemsPart 3: Guidelines for information security risk management (revision of BS ISO/IEC 27005:2011)
International Harmonized Stage Codes
Stages: 00 PRELIMINARY 10 PROPOSAL 20 PREPARATORY 30 COMMITTEE 40 ENQUIRY 50 APPROVAL 60 PUBLICATION 90 REVIEW 95 WITHDRAWAL Substages: 00 REGISTRATION 20 START OF MAIN ACTION 60 COMPLETION OF

Document Naming Strategy
DOCUMENT NAMING STRATEGY All information in the PD Revit Template follows PROJECT DESIGN (IO) standards. the For one-page drawing naming strategy, please refer to free download E-5161 OnePage Naming Strategy
BIM STRATEGY
a plan of action designed to achieve a long-term or overall aim. Definitions from Oxford Languages Required to define and understand what your company is trying to achieve with BIM.