The diagram does not show the details of the sub-process. A “plus” sign in the shape’s lower-left corner indicates that the activity is a sub-process with a lower level of

Shared context of information exchange
ELI5-S2: BIM in Practice E1: Shared context of information exchange Introducing the “ELI5-S2 BIM in Practice” Series! Welcome to the first post in our new series, “BIM in Practice,” where
Contractor’s proposals (CP)
Contractor’s proposals (CP) in AEC industry refer to documentation prepared by tenderers for design and build projects or on a traditional contract where the bidder is to design specific parts
BIM Strategic Lead
Responsible for project strategic direction from the tender stage, guides project set up and advises on the project when needed. Typical Lead Appointed Party BIM staff duties include: Development of
Assignment
A request or offer resulting in a Reliable Promise and is ready to be placed on the Weekly Work Plan (WWP) for performance. An assignment must meet the characteristics for
Two Stage Open Book
A procurement method introduced by Constructing Excellence and the Cabinet Office where a client invites prospective integrated teams to bid for a project based on their ability to deliver an outline brief
energy let-through of a device (I2t)
I2t The energy let-through of a device in A2s. The total amount of energy let through by a protective device for a given level of fault current at a stated
Circuit Protective Conductor (CPC)
Acircuit protective conductor (CPC) connects exposed-conductive-parts* of equipment to themain earthing terminal. *Conductive part of equipment,which can be touched and which is not normally live,but which can become live when
Integrated Project Delivery
Integrated Project Delivery (IPD) is a collaboration of all parties, systems and practices to optimize and maximize project success. Defined by the American Institute of Architects, IPD is typically applied
workflow management system
Workflow management systems allow organisations to identify and control activities associated with a business process. Effective workflow management offers the opportunity to measure and analyse the execution of the processes
Gateway (Parallel)
[And] When used to split the sequence flow, all outgoing branches are activated at the same time. When parallel branches are merged, it waits for all incoming branches to complete
cooperation
The interaction of individuals or task teams who work together to achieve a common goal, it demonstrates the ability to learn from each other. Cooperation forms a crucial attribute of

lead appointed party
The term introduced by ISO 19650 typically describes the Tier 1 Main Contractor. For example: : The Lead Appointed Party is a specific entity directly appointed (employed) by the primary
Intermediate Event (Link/Catching)
Paired link events can also be used as “off-page connectors” in order to print a process across multiple pages. Within the process level, they can also be used as generic

Quality Control
Quality control indicates an operational activity within the process, while quality assurance focuses on constructing confidence that quality requirements will be met. Quality is incorporated into production and verified during
Cable k2s2
k2s2 its an Energy withstand of cable in A2s. For example,a cable with a withstand of 12 x 104 A2s, can sustain without permanentdamage,a fault current of 1,000 A for
Specialist BIM Manager / Coordinator
The Specialist BIM Coordinator duties will reflect those for the Project BIM Coordinator but will be specific for discipline or trade-specific models and data deliverables. Responsible for checking, reviewing and
Soil Thermal Resistivity
Relates to the ability of the soil, in which the cable is installed, to conduct heat energy away from the cable. The rating factor Cs is applied in cable sizing
4D Modeling
4D Modelling also referred to as 4D BIM, when supported by existing planning techniques, can improve project delivery times and schedules. To make the gains possible, all project members must
Model Production Delivery Table (MPDT)
An MPDT its old PAS 1192 term, the MPDT defines who produces what, when and to what level of detail. The recent publication of ISO 19650 standards does not include

LTF_Lighting-Fixture Ring
Create unlimited lighting variations with parametric control.
The PD_LTF_Lighting-Fixture_Luminaire-Ring Family is a powerful, fully parametric Revit family that allows users to create limitless lighting fixture configurations.
Ground rating factor (Cc)
The rating factor Cc = 0.9 is applied to cable sizing calculations for cables installed in the ground (Installation Methods 70 to 73). See BS7671:2018,Appendix 4,Sections3,4 and 5.1.1.
Integrated Workplace Management System
Integrated Workplace Management System. Such systems incorporate powerful database capabilities to capture enterprise-level functions and serve as decision support tools at all organizational levels and throughout the whole building lifecycle.
deactivation request
A deactivation request corresponds to a modification of the property. After validating of the deactivation request by the experts, the value of the calculated status of the property changes to
Current carrying capacity of a cable (Iz)
Iz The current carrying capacity of a cable under the defined installation conditions. This is the effective rating of the cable after the relevant rating factors have been applied, i.e.,Ca,
data template
schema providing a data structure used to describe the properties of objects NOTE The relevant scope of the data template should be used together with the term “data template”. E.g.
BS EN ISO 21597-1:2020
Information container for linked document delivery — Exchange specification Part 1: Container
Intermediate Event
An intermediate event is something that occurs between the beginning and end of a process. Triggers can be “caught” or “thrown” by intermediate events. [1] Symbol 1] Silver, B. (2009).
Activity (Task)
A task is an atomic activity that is part of a process. When the work in the process is not broken down to a finer level of process detail, a
BS EN ISO 14004:2016
Environmental management systems General guidelines on implementation
data dictionary
centralized repository of information about data such as meaning, relationships to other data, origin, usage and formatNote 1 to entry: The definition is from IBM Dictionary of Computing BS EN
Last Planner®
The person or group that makes assignments to direct workers. Project Architect and ‘discipline lead’ are common names for last planners in design processes. ‘Superintendent’ or ‘foremen’ are common names
Trigger Event
Trigger Events are the occurrences during the life of an asset that causes new or updated information to be required.There are two types of trigger event: Foreseen – planned for

The importance of Information Requirements to a successful Asset Information Management (AIM) System
Introduction One of the challenges is the Appointing Party’s difficulties with the development of successful Operational Information Requirements in relation to asset management. Understanding the business challenges that define the

Post-COVID 19 pandemic Architecture Engineering and Construction (AEC) Industry
Introduction The COVID19 pandemic has impacted global health and the economy. This report explores the shift in Building Information Modelling (BIM) and associated technology, its impact on health and safety,
Gateway (Exclusive)
[XOR] When splitting, directs the sequence flow to one of the outgoing branches. When merging, it waits for one incoming branch to finish before starting the outgoing flow.[1] Symbol
Point of Adoption
a moment in time where an organisation’s readiness, change into organisational capability/maturity Macro-BIM adoption: Conceptual structures Bilal Succar Mohamad Kassem Tweet The Point of Adoption (PoA) is not to be
naming
The term naming in PAS 1192 is related to information container naming strategy, in ISO 19650 the therm is replaced by term ‘identification’ meaning remains the same

Exchange Information Requirements (EIR)
The Exchange Information Requirements (EIR) term introduced by BS EN 19650 replaces the PAS 1192 term Employer Information Requirements (EIR) on all projects where BS EN ISO 19650 compliance is
International Harmonized Stage Codes
Stages: 00 PRELIMINARY 10 PROPOSAL 20 PREPARATORY 30 COMMITTEE 40 ENQUIRY 50 APPROVAL 60 PUBLICATION 90 REVIEW 95 WITHDRAWAL Substages: 00 REGISTRATION 20 START OF MAIN ACTION 60 COMPLETION OF
Value
What the customer wants from the process, and will pay for. [1] [1] The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and Horizontal Construction.
Integrated Digital Delivery
History History’s Professor, Yuval Noah Harari, in his book Homo Sapiens reached a conclusion that humans developed an ability to transmit information about things that do not really exist (stories),
fragmentation request
A fragmentation request corresponds to the deactivation of the property and the creation of several properties. After validation of the fragmentation request by the experts, the fragmented property is deactivated.
Target Value Design
Target Value Designs (TVD) focus is on reducing the cost of a project without reducing the quality of the end product or extending the timetable. The team sets a cost

The role of management in BIM implementation at a project and organisational level
Introduction While comparing the experience of working in smaller practices fulfilling the combined role of designer shared with BIM leadership position, and the experience of dedicated BIM management role within

The Museum of the Future
Introduction The idea to connect 3D CAD models with construction programs (4th Dimension) was formulated in 1986-87 when Bechtel collaborated with Hitachi Ltd to develop the 4D visual model[1] The
Building Research Establishment Environmental Assessment Method (BREEAM)
It is a UK green building certification system, launched in 1990 by the Building Research Establishment (BRE), similar to LEED. Both systems confirm the level of the sustainability performance of
Existing Conditions Modeling
A process of developing a 3D model of the existing conditions for an asset, or a specific area within a facility.The model can be developed based on laser scanning surveys