The Ultimate BIM Knowledge Hub
Your one-stop resource for BIM electrical.
Revit Guides
Data Management
ELI5
rationalise
In construction, to rationalise is to attempt to remove, explain or justify irrational quantities, processes or systems or else adjust unreasonable design decisions by employing logic or reason, (behaviour, attitude),
agent
…’An agent is just something that acts (agent comes from the Latin agree, to do). Of course, all computer programs do something, but computer agents are expected to do more:

Force Relinquish
Tip of the Day (TOD): How to Relinquish Locked Revit Models If you’ve ever been frustrated by locked Revit model elements when a team member is unavailable to relinquish them,
cooperation
The interaction of individuals or task teams who work together to achieve a common goal, it demonstrates the ability to learn from each other. Cooperation forms a crucial attribute of
End Event
An end event denotes the point at which a process’s path will come to an end. End events can only result in a “throw” of a result.[1] Symbol 1] Silver,
Builders work in connection (BWIC)
Coordination of Builders work in connection to services i.e. openings in walls or floors for MEP Services It is anticipated that as a minimum, all builders work openings of 50x50mm

Management of the cyber-security threats in Common Data Environment
The increased reliance of the IT Technology Widely used cloud-based systems with file-sharing protocols have are the way of the future, but the use of such a platforms increase the
Appointed party
The appointed party term introduced in BS EN ISO 19650 it is meant to replace PAS 1192 term ‘Supplier’ Typically it means Tier 2 and below Contractors Who can become
Geo-referencing
A BIM is said to be geo-referenced when the BIM is located with respect to one of the standard geographic survey coordinate grids established to represent locations on the Earth’s
fragmentation request
A fragmentation request corresponds to the deactivation of the property and the creation of several properties. After validation of the fragmentation request by the experts, the fragmented property is deactivated.
Co-Location
Assembling the entire BIM design and construction team in a single location (“Co-location”) enables almost instant and direct communication and coordination among team members. This Co-location of all team members
BS 8541-3:2012
Library objects for architecture, engineering and construction Part 3: Shape and measurement – Code of practice Note: ISO 22014 and ISO 22057 are under development tosupersede BS 8541, parts 1-6.

Information Interoperability
Information overload What makes construction management so challenging is the sheer amount of information available, the volume of the data means that we are often not able to extract or
EXPRESS specification
formal specification is provided in the EXPRESS language. BS EN ISO 23387:2020
expert
person who, through knowledge or experience, has competence to give an opinion in the fields about which he/she is consulted[SOURCE: ISO 13302:2003, 3.10, modified — The domain “” has been
intrinsic aspect
role that an aspect plays in a relationship with a possessor and that is dependent on the aspect as well as on the possessing object Note 1 to entry: Typically the
Sequence Flow (Normal or Uncontrolled)
A sequence flow is used to show the order in which activities in a process or choreography will be performed.[1] Symbol 1] Silver, B. (2009). BPMN Method and Style: A
model validation checklist
The example checklist consists of checks which assure quality within models and information, to eliminate errors and achieve desired project outcomes. Table 1 – Model Validation Checklist Check Definition Project
BS EN ISO 23387:2020
Building information modelling (BIM) — Data templates for construction objects used in the life cycle of built assets Concepts and principles

Common Data Environment (CDE)
ELI5-S1: BIM Basics E2: CDE Explained The purpose of using Common Data Environment (CDE) on a project is to provide the right person with the right information at the right
Semi-enclosed fuse rating factor (Cf)
The rating factor Cf = 0.725 is applied to cable sizing calculations for any circuit protected by a semi-enclosed fuse to BS3036.
Capital delivery phase
Delivery phase [ISO1950] Delivery phase is a simplification of capital/delivery phase without making any assumption about how the project funding is being treated in financial accounting

Function
ELI5-S1 BIM Basics E17_BIM Functions Understanding Functions: A Basic Guide In both everyday life and specialised fields like mathematics, computer science, and even construction, the term “function” is widely used.
Cyber-Physical Systems
Systems that include integrations of computation, networking, and physical processes with feedback loops where physical processes affect computations and vice versa4. An example of a Cyber-Physical System is a Digital
Circuit protective device (CPD)
A fuse or circuit-breaker providing overload and fault current protection.
BS 7799‑3:2017
Information security management systemsPart 3: Guidelines for information security risk management (revision of BS ISO/IEC 27005:2011)
Circuit Protective Conductor (CPC)
Acircuit protective conductor (CPC) connects exposed-conductive-parts* of equipment to themain earthing terminal. *Conductive part of equipment,which can be touched and which is not normally live,but which can become live when

Lead Appointed Party context of information exchange
ELI5-S2: BIM in Practice E5: Lead Appointing Party context of information exchange Understanding the Lead Appointed Party (T1) Context of Information Exchange in BIM Welcome to the fifth installment of
BS EN ISO 12006-3:2016
Building construction — Organization of information about construction works Part 3: Framework for object-oriented information
interoperability
the ability of two or more systems* to exchange information and to use the information that has been exchanged. definition adapted from the one contained in ‘ISO/TS 27790:2009, Health informatics—
supply chain
Term used to describe the relationship between organisation that provide materials, products or services for the client. Referring to ISO 19650 Framework the supply chain is synonymous to a ‘delivery
BS EN ISO 14004:2016
Environmental management systems General guidelines on implementation

BS EN ISO 9001:2015
Quality management systems Requirements ISO 9001 is a set of quality management principles defined by various criteria and standards. It outlines the importance of defining a quality management system (QMS)
reference document
publication that is consulted to find specific information, particularly in a technical or scientific domain EXAMPLE See EN 771-1:2011+A1: 2015.Note 1 to entry: A reference document can be associated with

Young Person
The term “Young Person” in the context of construction, Building Information Modeling (BIM), electrical engineering, or general engineering typically refers to a younger individual, often a recent graduate or entry-level
Data Association
A data association is used to move data between data objects, properties, and activity and process inputs and outputs. The association connector style can be used to visually represent data
Level of information need
The term describes the details and amount of information required. It is a framework which defines the extent and granularity of data to be exchanged. The term related to information
Distributed Ledger Technology
Distributed Ledger Technology (DLT) is an encrypted and distributed database that serves as a register for storing records of transactions. At the core of DLT is a data model that
Information delivery cycle
It is a term introduced first in PAS 1192 and updated in ISO 19650 framework, it depicts the process of specifying and delivery of project and asset information summarised in
Industry Foundation Classes (IFC)
conceptual data schema and exchange file format for building information modelling (BIM) data BS EN ISO 23387:2020 In general, IFC, or “Industry Foundation Classes”, is a standardized, digital description of
Status
Identifier indicating the characteristic of an element of information for which at all times a value can be established. Word status has been included in ISO 19650 Framework meant to
Industry 4.0
Industry 4.0 is more than just manufacturing. Smart, connected technologies transform how we design, manufacture, use and maintain parts, products, and entire buildings. The interconnected technology also changes the way
Conformity Assessment Committee (CASCO)
Committee whose secretariat is provided by ISO/CS that deals with conformity assessment and is responsible for the development of conformity assessment standards. https://www.iso.org/glossary.html
Information model
set of structured and unstructured information containers (3.3.12) [cited from ISO 19650-1:2018(en), 3.3.8] ISO 19650 framework concentrates specifically on the information model concept, a term that contains multiple types of information (geometrical
Project Committee (PC)
a Project Committee (PC), which is created to develop one standard, after which it is disbanded. https://www.iso.org/glossary.html
Design Web Format
Design Web Format (DWF), created by Autodesk. DWF is a compressed, non-editable, vector file format created by CAD and BIM applications. A DWF file can represent sheets for plotting purposes
Pre-contract BEP
On projects where ISO 19650 Framework has implemented a term, Pre-appointment BEP is used instead of the PAS 1192 term Pre-contract BEP. The meaning is the same, it communicates on

Breaking capacity
IWE-S1-IWE- E8_Breaking Capacity of MCCB What is Breaking Capacity (kA) Breaking capacity, often referred to as short-circuit breaking capacity, is one of the most critical specifications of a protective device.