The Ultimate BIM Knowledge Hub
Your one-stop resource for BIM electrical.
Revit Guides
Data Management
ELI5
identification
The “identification” is ISO 19650 term equivalent to PAS 1192 term ‘naming’

Task Information Delivery Plan (TIDP)
schedule of information containers and delivery dates, for a specific task team [cited from ISO 19650-2:2018(en), 3.1.3.4] The Task Information Delivery Plan (TIDP) is defined by the ISO 19650 framework
enumerated type value
data type consisting of a set of named values called elements, members, enumeral, or enumerators ofthe type
AD Hoc Group (AHG)
AD HOC GROUP (AHG) Group set up within a committee to look into a particular problem and report back to the parent committee at a meeting. The group is disbanded after
Ze
That part of the earth fault loop impedance which is external to the circuit under consideration. For the supply cable it will be the impedance external to the installation. For
IDM standard
BS EN ISO 29481-1 Building information models – Information delivery manual (IDM) PD ISO/TS 12911:201
Facility Lifecycle
This refers to the time span stretching from a building’s conception to demolition including the five distinctive phases (Planning, Design, Construction, Operations, and Disposition).1 1 The Massachusetts Port Authority, 2015.
taxonomy
A system for naming and organizing a set of words or phrases, into groups that share similar qualities, used for organising information and primarily intended for browsing. In BIM contexts
risk register
means a risk register containing the risks associated with the timely delivery of information as may be identified in the Information Particulars and/or provided in accordance with the Information Standard.
People
An element of a BIM strategy which is often overlooked. Clear communication is required as to why and how you intend to implement BIM and gain support by engaging BIM
Assignment matrix
Responsibility matrix [ISO19650] In ISO 19650 there is a principle to develop responsibility matrices to cover information management activities and information delivery. Responsibility matrix [PAS1192] The former is illustrated as
PAS 14191:2020
Built environment – Management and operation of interconnected construction data dictionaries Specification
efficiency
correlation between the outcome and the resources used a measure of the utilization of resources to realize a given objective Note 1 to entry: An activity is efficient if it minimizes
Periodic Model Quality Control Checks
Apart from the weekly model coordination effort that focuses on spatial coordination and clash resolution, the Appointment BIM Manager should review all disciplines project models and ensure compliance with BEP
Product Data Template (PDT)
The document aimed to be used by manufacturers and consumers where information about a product, is collated in a standardised and structured way. The information is structured in the form
delivery phase
part of the life cycle (3.2.10), during which an asset (3.2.8) is designed, constructed and commissioned [cited from ISO 19650-1:2018(en), 3.2.11] ISO 19650-2:2018 Standard dedicated to the delivery phase
Leadership in Energy and Environmental Design
An internationally recognized green building certification system confirms the level of the sustainability performance of an asset. Confirming the level at which the asset was designed and built using strategies
BS EN ISO 29481-1:2017
Building information models – Information delivery manual Part 1: Methodology and format
System of engagement
The System of Engagement is defined as a platform that manages supported digital engagement, of systems like Browsing, Web Chat, Messaging, videos (Facebook, WhatsApp, TEAMS, ZOOM, Signal, Slack, etc.), various
Association
An association is used to link data and artefacts to flow objects. Non-flow objects, such as text and graphics, can be associated with flow objects and flow.[1] Symbol [1] Silver,
workflow
The term ‘workflow’ is used in ISO 19650 instead of the PAS 1192 term ‘process’.
BIM thinking ahead
I decided to challenge myself and explore existing and emerging technologies in order to estimate what could we achieve during the next 30 years. The question is considered in terms

zone indicator
part of indicating equipment which visually indicates the zone of origin of a alarm of fire or faultwarning BS 4422 2005 Zone Indicator in Fire Alarm Systems The zone indicator
plan of work
It is a project-specific “digitally checkable” framework set-up to ensure that the deliverables of all contributors are identified and appropriate to the decisions required at each work stage. The plan
As-Built Model
Model(s) based on Fabrication Shop Model(s) and installed conditions.1 1 1 The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and Horizontal Construction.
Conditions of Satisfaction
An explicit description by a Customer of all the actual requirements that must be satisfied by the Performer in order for the Customer to feel that he or she received

Insurance Backed Alliancing projects under the IPI model
Introduction Martin Davis member of the New Models of Construction Procurement (NMCP) Working Group and the Integrated Project Insurance (IPI) mentor describes the Integrated Project Insurance model (IPI) coupled up

ISO 19650 Framework
The ISO 19650 framework is generally aimed for information management. The individual standards do not cover the whole area of quality management but instead point out to other standards suggesting
BS EN ISO 16739-1:2020
Industry Foundation Classes (IFC) for data sharing in the construction and facility management industries Part 1: Data schema
BS EN ISO 21597-1:2020
Information container for linked document delivery — Exchange specification Part 1: Container
secondary power supply (SPS)
alternative or supplementary electrical energy sources has become more viable, typical secondary power supply (SPS) Photovoltaic (PV) power Wind turbine power standby generator
Fault
Acircuit condition in which current flows through an abnormal or unintended path. The fault current may flow from line to line (phase fault) or line to earth (earth fault).
Resources
In the context of project management, the resources refer to optimizing the use of resources for successful project execution and the management of resources in the project. [1] Therefore, the
Activity
An identifiable chunk of work with recognized prerequisites to begin and a recognized State of Completion – or Conditions of Satisfaction. Another way to look at an activity – establish
Computer aided facility management (CAFM)
Originally coined in the 60s, The acronym has become a catch-all for a wide range of Facilities Management platforms and software. A CAFM system can be broadly defined as a collaborative,

UK Earthing & Bonding Design Reference
UK Earthing & Bonding Design Reference (Edition 2025 – aligned with BS 7671:2018+A2:2022, Amendment 3 (2024), and draft Amendment 4 (2026), also drawing from official UK Power Networks standards) Scope,
BS 7000-4:2013
Design management systemsPart 4: Guide to managing design in construction
Existing Conditions Modeling
A process of developing a 3D model of the existing conditions for an asset, or a specific area within a facility.The model can be developed based on laser scanning surveys
Miller’s law
Argument introduced by Miller, G. A., suggests that the number of objects an average human can hold in short-term memory is 7 ± 2.[1] From a practical standpoint, this means
BS 7000-10:2008
Design management systems Part 10: Vocabulary of terms used in design management
pre-design process
construction process (3.3.2) determining construction properties (3.5.1) for the built environment (3.1.7) before it is designed[1] 1 Online Browsing Platform (OBP) [WWW Document], n.d. URL https://www.iso.org/obp/ui#search (accessed 4.10.21).

Lead Appointed Party context of information exchange
ELI5-S2: BIM in Practice E5: Lead Appointing Party context of information exchange Understanding the Lead Appointed Party (T1) Context of Information Exchange in BIM Welcome to the fifth installment of
Thermal resistivity of the soil rating factor (Cs)
The rating factor Cs is applied to cable sizing calculations for cable installed in the ground. Its value varies according to the thermal resistivity of the soil in which the
data template
schema providing a data structure used to describe the properties of objects NOTE The relevant scope of the data template should be used together with the term “data template”. E.g.
Information Delivery Manual (IDM)
information delivery manual (IDM) Documentation that captures the business process and specifies in detail the information that a user performing a particular role is required to provide at a particular
Trigger Event
Trigger Events are the occurrences during the life of an asset that causes new or updated information to be required.There are two types of trigger event: Foreseen – planned for

The Museum of the Future
Introduction The idea to connect 3D CAD models with construction programs (4th Dimension) was formulated in 1986-87 when Bechtel collaborated with Hitachi Ltd to develop the 4D visual model[1] The