The Ultimate BIM Knowledge Hub
Your one-stop resource for BIM electrical.
Revit Guides
Data Management
ELI5

Delivery Team context of information exchange
ELI5-S2 BIM in Practice E3 Delivery Team context of information exchange ELI5-S2: BIM in Practice E3: Delivery Team context of information exchange explained Understanding the context of information exchange from
Model Upload Workflow
3D models shall be synchronized with the central cloud model after daily work is done to ensure the rest of the project team are coordinating with the latest information. All
agent
…’An agent is just something that acts (agent comes from the Latin agree, to do). Of course, all computer programs do something, but computer agents are expected to do more:

change strategy
Concept of change strategy involves identifying objectives, formulating intervention concepts for change, forming and defining success parameters, and implementing strategies. This includes testing the effectiveness of the changes and their
BIM STRATEGY
a plan of action designed to achieve a long-term or overall aim. Definitions from Oxford Languages Required to define and understand what your company is trying to achieve with BIM.

Cutting Geometry with Nested Void Families in Revit
1. Generic Host in the Face-Based Family When you are in the face-based family, create void, and Cut the Generic Host This setup essentially simulates the cutting action within the
Final Circuit
A circuit connected directly to current-using equipment, or to a socket-outlets or other outlet points for the connection of such equipment.
workflow
The term ‘workflow’ is used in ISO 19650 instead of the PAS 1192 term ‘process’.
information
reinterpretable representation of data in a formalized manner suitable for communication, interpretation or processing [cited from ISO 19650-1:2018(en), 3.3.1]
property
inherent or acquired feature of an item[SOURCE: BS ISO 6707-1:2017, 3.7.1.3] NOTE Examples include thermal efficiency, heat flow, sound reduction index and acoustic power level.PAS 14191:2020

jet reaction
nozzle reactionforce acting in the opposite direction to the water stream leaving the nozzle BS 4422 2005 “Jet reaction,” also known as “nozzle reaction,” is a fundamental concept in fluid
Semantic Web
The Semantic Web, as defined by Ontotext[1] is the extension of the existing information and data on a network (or Web) to include data descriptors, which are intended to allow
BS 7000-10:2008
Design management systems Part 10: Vocabulary of terms used in design management
delta exchange
exchange of only changed information between two synonymous sources PAS 14191:2020
International Harmonized Stage Codes
Stages: 00 PRELIMINARY 10 PROPOSAL 20 PREPARATORY 30 COMMITTEE 40 ENQUIRY 50 APPROVAL 60 PUBLICATION 90 REVIEW 95 WITHDRAWAL Substages: 00 REGISTRATION 20 START OF MAIN ACTION 60 COMPLETION OF
Appointor
UK BIM Alliance responding to the inconsistency between current guidance of CIC BIM Protocol, Second Edition 2018 and ISO 19650 Framework published updated Information protocol to support BS EN
quantity
property of a phenomenon, body, or substance, where the property has a magnitude that can be expressed by means of a number and a reference. for example a measure with
Construction Products Regulation (CPR)
Construction Products Regulation (CPR) https://ec.europa.eu/growth/sectors/construction/product-regulation_en#:~:text=The%20Construction%20Products%20Regulation%20(CPR,the%20performance%20of%20construction%20products.
tension between hope and ambiguity
term coined by Deloitte[1], it is a current situation where whilst businesses conceptually understand the significant changes that information Management (IM) and technology may bring, they have divergent agendas and

Life Safety Generator
Life Safety Generator selection guide Copy If the secondary power supply is provided for firefighter’s lift, it must be capable of operating the firefighter’s lift at its full rated load
Security Management Plan
A document (or part of a document) identified in the Information Particulars setting out the security requirements for carrying out the Works in a security-minded way, including any policies, protocols,
breakdown structure
decomposition of a defined scope into progressively more detailed levels
Openness
in relation to data and information – also linked to interoperability means that it is provided or made available in a format that can be accessed and used withoutrecourse to
consensus
general agreement, characterized by the absence of sustained opposition to substantial issues by any important part of the concerned interests and by a process that involves seeking to take into

Appointed Party context of information exchange
ELI5-S2: BIM in Practice E6: Appointed Party context of information exchange Understanding the Appointed Party (T2-T4) Context of Information Exchange in BIM Welcome to the final instalment of our ELI5-S2
taxonomy
A system for naming and organizing a set of words or phrases, into groups that share similar qualities, used for organising information and primarily intended for browsing. In BIM contexts

Force Relinquish
Tip of the Day (TOD): How to Relinquish Locked Revit Models If you’ve ever been frustrated by locked Revit model elements when a team member is unavailable to relinquish them,
Contractor’s proposals (CP)
Contractor’s proposals (CP) in AEC industry refer to documentation prepared by tenderers for design and build projects or on a traditional contract where the bidder is to design specific parts
PAS 1192-7
The latest message related to PAS 1192-7 is a tweet from Paul Surin is that PAS1192-7 confirming that CPNI and BSI have agreed to cease the development of PAS 1192-7.
BS EN ISO 19650-3:2020
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) – Information management using building information modelling Part 3: Operational phase of the assets
minor change
change that does not affect the meaning, function or intended use NOTE 1 Definition applies to properties and groups of properties.NOTE 2 Examples of this type of change are new
End Event
An end event denotes the point at which a process’s path will come to an end. End events can only result in a “throw” of a result.[1] Symbol 1] Silver,
Project setup
During project setup phase It is essential to establish and analyse a timeline that guides the entire team in delivering the project on time. Thus the prospective Lead Appointed Party
AD Hoc Group (AHG)
AD HOC GROUP (AHG) Group set up within a committee to look into a particular problem and report back to the parent committee at a meeting. The group is disbanded after
PAS 14191:2020
Built environment – Management and operation of interconnected construction data dictionaries Specification
Spacial Asset
A spacial asset can be defined as a specific location such as a zone, boundary, area, floor or room with a known location and extents.For most businesses, spacial assets usually
business process modelling notation (BPMN)
Business Process Modelling Notation (BPMN) is a flow chart method for modelling the steps of a planned business process from beginning to end. It is a critical component of Business

volume
ELI5-S1: BIM Basics E10: Volume Strategy (spatial) explained a term defined by BS 1192:2007 means a spatial subdivision of a project to allow multiple people to work on Project Information
Dimensionality
A dimension of space, such as width, height, or length. can be zero-dimensional (location point), one-dimensional (e.g. line, curve, path), two-dimensional (e.g. surface, face), or three-dimensional (e.g. surface, face) (e.g.

VEAM connector
VEAM connectors refer to a specific type of electrical bayonet type connectors known for their robustness and reliability in harsh environmental conditions. These connectors are commonly used in various industries,
Distribution board
An assembly containing protective devices associated with one or more outgoing circuits fed from an incoming circuit. In the ProDesign software,a distribution board (DB) may be single-phase or three-phase,and can
Built Environment
All forms of buildings (residential, industrial, commercial, hospitals, schools), all economic infrastructure (above and below ground) and the urban space and landscape between and around buildings and infrastructure3, as well
Harmonic rating factor (Ch)
Ch Rating factor used for calculating theminimum required cable size in the presence of harmonic currents.See BS7671:2018,Appendix 4, section 5.5.

Emergency Lighting Standards and Regulations
BS 5266‑1:2025 – whats changed? Status & scope. The new edition was published on 29th and came into effect on 31 October 2025, withdrawing BS 5266-1:2016. It is intended to be
Two Stage Open Book
A procurement method introduced by Constructing Excellence and the Cabinet Office where a client invites prospective integrated teams to bid for a project based on their ability to deliver an outline brief
Grouping rating factor (Cg)
Grouping rating factor used for calculatingminimum required cable size. For cables installed in air, values for this factor are given BS7671:2018,Tables4C1,4C4,4C6.For ground installations, values are given in Table4C2. Grouping a
Integrated Digital Delivery
History History’s Professor, Yuval Noah Harari, in his book Homo Sapiens reached a conclusion that humans developed an ability to transmit information about things that do not really exist (stories),

Please can you confirm if the life system system has to be lidded?
Please can you confirm if the life system system has to be lidded? There is no requirement for the life system to be lidded. A lid is effectively required