The Ultimate BIM Knowledge Hub
Your one-stop resource for BIM electrical.
Revit Guides
Data Management
ELI5
Final Circuit
A circuit connected directly to current-using equipment, or to a socket-outlets or other outlet points for the connection of such equipment.
major change
change that affects the meaning, function or intended useNOTE Definition applies to properties and groups of properties.PAS 14191:2020
Value Stream
Includes all the processes and activities used to design, produce and deliver the product or service to the Customer.[1] [1] The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and
Post-contract BEP
This PAS 1192 term has been superseded by ISO 19650 term Post-appointment BEP. It is a BIM Execution Plan (BEP) which shall be re-submitted by the Lead Appointed Party and

jet reaction
nozzle reactionforce acting in the opposite direction to the water stream leaving the nozzle BS 4422 2005 “Jet reaction,” also known as “nozzle reaction,” is a fundamental concept in fluid
Power factor
Power factor is the ratio of the resistance (R) and impedance (Z) in a circuit, that is:Power factor = cos ∅ =R/Z
Last Planner System®
The collaborative, commitment-based planning system that integrates “should-canwill-did planning” (pull planning, make-ready look-ahead planning with constraint analysis, weekly work planning based upon reliable promises, and learning based upon analysis of
UML diagram
provides the data structure for data templates using objects, collections and relationships between them. The multiplicities in the UML diagram specify the range of allowablecardinality values, giving a specification of

Young Person
The term “Young Person” in the context of construction, Building Information Modeling (BIM), electrical engineering, or general engineering typically refers to a younger individual, often a recent graduate or entry-level
Crown Commercial Services (CCS)
The Crown Commercial Service (CCS) is an administrative agency and trading fund of the Cabinet Office of the UK Government, responsible for the supervision of the procurement of common goods
Association
An association is used to link data and artefacts to flow objects. Non-flow objects, such as text and graphics, can be associated with flow objects and flow.[1] Symbol [1] Silver,

Organizational Drivers
The Organizational Driver is a term used to describe the initial component in the information exchange sequence. It represents the steps and actions involved in initiating the exchange process.
Facility Data
The non-graphical information attached to objects in the Model that defines various characteristics of the object. Facility Data can include properties such as parametric values that drive physical sizes, material
fragmentation request
A fragmentation request corresponds to the deactivation of the property and the creation of several properties. After validation of the fragmentation request by the experts, the fragmented property is deactivated.
ISO/TS 12911:2012
Framework for building information modelling (BIM) guidance STANDARDS BY ISO/TC 59/SC 13
American Society of Heating, Refrigerating, and Air Conditioning Engineers (ASHRAE)
American Society of Heating, Refrigerating, and Air Conditioning Engineers (ASHRAE) is a professional organization that develops and promulgates system, measurement, and product engineering standards to the industry.1 1 The Massachusetts
Conformance Class
Conformance class allows establishing relations from the information model of BS EN 82045-2 to any other object of relevance available information model. For example, the Project Information Model (PIM) Conformance
merge request
A merge request corresponds to the creation of one property and the deactivation of several properties. After validation of the merge request by the experts, the merged properties are deactivated.
quantity
property of a phenomenon, body, or substance, where the property has a magnitude that can be expressed by means of a number and a reference. for example a measure with
breakdown structure
decomposition of a defined scope into progressively more detailed levels
Master Schedule
The purpose of a project schedule is to define how the project should be delivered and maintained based on the available resources. The development of a timetable is the first
Management of duplicates
The procedure to remove duplicate properties shall be carried out on the relevant attributes. The management of duplicates cannot be fully automated. BS EN ISO 23386:2020
cost plan
statement showing an apportionment of an estimate (3.7.9) or of an agreed budget between cost (3.7.1) headingsNote 1 to entry: For example, the cost plan might be broken down into building elements. [1] 1 Online Browsing Platform (OBP)

Organizational Information Requirements (OIR)
ELI5-S1: BIM Basics E7: OIR explained information requirements in relation to organizational objectives BS EN ISO 19650‑1:2018 (3.3.3)

CDE area
ELI5-S1: BIM Basics E5: CDE areas and states Area and section imply moving information from one place to another. This is not necessary in a CDE. It is the state

metadata
ELI5-S1: BIM Basics E6: Metadata explained Understanding Metadata in Building Information Modeling (BIM) Metadata provides critical information about an item’s content, making it easier to locate and work with specific
BS 7000-4:2013
Design management systemsPart 4: Guide to managing design in construction
replacement request
A replacement request corresponds to the creation of the property and the deactivation of the property it replaces. After validation of the replacement request by the experts, the replaced property

Force Relinquish
Tip of the Day (TOD): How to Relinquish Locked Revit Models If you’ve ever been frustrated by locked Revit model elements when a team member is unavailable to relinquish them,
Current-carrying capacity
Themaximum current which can be carried by a conductor under specified conditions (Installation method, temperature,grouping,etc.)without its steady-state temperature exceeding a specified value (for example,90 ºCfor cables with thermosetting insulation).
BS 7799‑3:2017
Information security management systemsPart 3: Guidelines for information security risk management (revision of BS ISO/IEC 27005:2011)
Status
Identifier indicating the characteristic of an element of information for which at all times a value can be established. Word status has been included in ISO 19650 Framework meant to
BIM thinking ahead
I decided to challenge myself and explore existing and emerging technologies in order to estimate what could we achieve during the next 30 years. The question is considered in terms

The role of management in BIM implementation at a project and organisational level
Introduction While comparing the experience of working in smaller practices fulfilling the combined role of designer shared with BIM leadership position, and the experience of dedicated BIM management role within
Workset
A workset is a collection of elements in a work shared Revit project. The purpose of worksets is to enable multiple users to work on the same project and facilitate

Management of the cyber-security threats in Common Data Environment
The increased reliance of the IT Technology Widely used cloud-based systems with file-sharing protocols have are the way of the future, but the use of such a platforms increase the
model validation checklist
The example checklist consists of checks which assure quality within models and information, to eliminate errors and achieve desired project outcomes. Table 1 – Model Validation Checklist Check Definition Project
Circuit protective device (CPD)
A fuse or circuit-breaker providing overload and fault current protection.
data dictionary
centralized repository of information about data such as meaning, relationships to other data, origin, usage and formatNote 1 to entry: The definition is from IBM Dictionary of Computing BS EN
Appointment
Equivalent to PAS1192 term ‘Contract’ The more generic term appointment has been used in ISO 19650 instead of contract. This means one term can be used for both external contracts
Post-appointment BEP
Post-appointment BEP confirms and defines the delivery team’s approach to information management in the appointed project. It is a BIM Execution Plan (BEP) which shall be re-submitted by the Lead

LTF_Lighting-Fixture Rectangular
LTF_Lighting Fixture_Generic Rectangular Light v22.1.3 Family For: Electrical Engineers, Bim Managers, Electrical Designers Setup: 10-30 minutes View Details Technical Details Released: Feb 2, 2025 Updated: Jul 5, 2025 Regional Variants:

Separation Gap for Primary and Secondary Life Safety Cable Trays Roof Installation)
UK electrical and fire safety standards do not prescribe a fixed minimum separation distance for roof-mounted life-safety cable trays. However, BS 7671, BS 8519, and BS 5839 collectively establish that life-safety circuits must be installed on dedicated containment and be either separated by barriers or adequately distanced to ensure circuit independence.
tertiary power source
A Uninterruptible Power Supply (UPS) or standby generator connected to dedicated final circuits of the distribution infrastructure. Enhance the infrastructure resilience and can improve maintenance opportunities and business continuity for
International Harmonized Stage Codes
Stages: 00 PRELIMINARY 10 PROPOSAL 20 PREPARATORY 30 COMMITTEE 40 ENQUIRY 50 APPROVAL 60 PUBLICATION 90 REVIEW 95 WITHDRAWAL Substages: 00 REGISTRATION 20 START OF MAIN ACTION 60 COMPLETION OF

Please can you confirm if the life system system has to be lidded?
Please can you confirm if the life system system has to be lidded? There is no requirement for the life system to be lidded. A lid is effectively required
risk register
means a risk register containing the risks associated with the timely delivery of information as may be identified in the Information Particulars and/or provided in accordance with the Information Standard.
Facility Lifecycle
This refers to the time span stretching from a building’s conception to demolition including the five distinctive phases (Planning, Design, Construction, Operations, and Disposition).1 1 The Massachusetts Port Authority, 2015.