The Ultimate BIM Knowledge Hub
Your one-stop resource for BIM electrical.
Revit Guides
Data Management
ELI5

Junction Boxes
Junction Box Requirements in Electrical Installations To ensure compliance with BS 7671:2018+A2:2022, the following requirements apply when using junction boxes in electrical installations: 1. Compliance with BS EN 60670-22 Any
Look Ahead Plan
A short interval plan, based on the pull/phase plan, that identifies all the activities to be performed in the next 6 (or other) weeks. The 6W Look-Ahead Schedule (LAS) is
Assignment
A request or offer resulting in a Reliable Promise and is ready to be placed on the Weekly Work Plan (WWP) for performance. An assignment must meet the characteristics for
Conditions of Satisfaction
An explicit description by a Customer of all the actual requirements that must be satisfied by the Performer in order for the Customer to feel that he or she received
property
inherent or acquired feature of an item[SOURCE: BS ISO 6707-1:2017, 3.7.1.3] NOTE Examples include thermal efficiency, heat flow, sound reduction index and acoustic power level.PAS 14191:2020

The Level of and Progression Management systems
The ISO 19650 set of standards introduces a new term: ‘Level of information need’ which is designed to replace the terms used in BS EN 1192 such as Level of
Design Web Format
Design Web Format (DWF), created by Autodesk. DWF is a compressed, non-editable, vector file format created by CAD and BIM applications. A DWF file can represent sheets for plotting purposes
BS 11000‑2:2017
Collaborative business relationship management systemsPart 2: Guide to implementing BS ISO 44001

VADs
Guide to Visual Alarm Devices (VADs) in Fire Safety In high-noise workspaces or locations requiring hearing protection, Visual Alarm Devices (VADs) play a critical role in fire safety. They ensure
Team’s Capability and Capacity
The competence and understanding of BIM, of the consultants and delivery team partners to be involved in the project, shall be assessed and results included in Post-Contract BEP. The assessment

Volume strategy
ELI5-S1: BIM Basics E10: Volume Strategy (spatial) explained Introduction Volume Strategy enables information management, spatial coordination, and concurrent engineering, ultimately fitting together like a complex 3D jigsaw puzzle, where each
System of engagement
The System of Engagement is defined as a platform that manages supported digital engagement, of systems like Browsing, Web Chat, Messaging, videos (Facebook, WhatsApp, TEAMS, ZOOM, Signal, Slack, etc.), various
International Harmonized Stage Codes
Stages: 00 PRELIMINARY 10 PROPOSAL 20 PREPARATORY 30 COMMITTEE 40 ENQUIRY 50 APPROVAL 60 PUBLICATION 90 REVIEW 95 WITHDRAWAL Substages: 00 REGISTRATION 20 START OF MAIN ACTION 60 COMPLETION OF
smart asset management
The terminology such as digital built environment and smart asset management, often referred to as Digital Construction, encompasses multiple technologies and processes related to information or project management and the

CPR Cable Classification Guide
Since July 2017, all power, control and communication cables permanently installed in buildings must comply with the Construction Products Regulation (CPR).
This guide is your reference for navigating Euroclass ratings, selecting compliant products.
BS ISO 55002:2018
Asset management — Management systems Guidelines for the application of ISO 55001
knowledge model
information model that expresses knowledge in a computer interpretable structure Note 1 to entry: A knowledge model consists of a number of expressions of facts about a concept, each of which

Appointing Party context of information exchange
ELI5-S2: BIM in Practice E4: Appointing Party context of information exchange Understanding the Appointing Party (T0) Context of Information Exchange in BIM Welcome to the fourth installment of our ELI5-S2
Industrial Internet of Things (IIoT)
The industrial IoT (IIoT) forms an integral part of Industry 4.0, and smart manufacturing refers to interconnected sensors, and other input/output devices linked to manufacturing applications, supporting industrial automation and
pre-design process
construction process (3.3.2) determining construction properties (3.5.1) for the built environment (3.1.7) before it is designed[1] 1 Online Browsing Platform (OBP) [WWW Document], n.d. URL https://www.iso.org/obp/ui#search (accessed 4.10.21).

Post-COVID 19 pandemic Architecture Engineering and Construction (AEC) Industry
Introduction The COVID19 pandemic has impacted global health and the economy. This report explores the shift in Building Information Modelling (BIM) and associated technology, its impact on health and safety,
Rated current
Value of current used for specification purposes,established for a specified set of operating conditions.
Ze
That part of the earth fault loop impedance which is external to the circuit under consideration. For the supply cable it will be the impedance external to the installation. For
breakdown structure
decomposition of a defined scope into progressively more detailed levels
AD Hoc Group (AHG)
AD HOC GROUP (AHG) Group set up within a committee to look into a particular problem and report back to the parent committee at a meeting. The group is disbanded after
PAS 14191:2020
Built environment – Management and operation of interconnected construction data dictionaries Specification
Current-carrying capacity
Themaximum current which can be carried by a conductor under specified conditions (Installation method, temperature,grouping,etc.)without its steady-state temperature exceeding a specified value (for example,90 ºCfor cables with thermosetting insulation).

information delivery milestone
scheduled event for a predefined information exchange [cited from ISO 19650-2:2018(en), 3.1.3.2] Milestones act as signposts through the course of a project. An information delivery milestone is a point in
BS 8541-2:2011
Library objects for architecture, engineering and construction Part 2: Recommended 2D symbols of building elements for use in building information modelling Note: ISO 22014 and ISO 22057 are under development
capability
a measure of ability to perform and function [cited from ISO 19650-1:2018(en), 3.3.18]
PAS1192-2_2015
The Publicly Available Specification (PAS) 1192 part two was published in February 2013; the specification was based on existing Code of practice BS 1192 dated 2007 amended in October 2015
Information model
set of structured and unstructured information containers (3.3.12) [cited from ISO 19650-1:2018(en), 3.3.8] ISO 19650 framework concentrates specifically on the information model concept, a term that contains multiple types of information (geometrical
fragmentation request
A fragmentation request corresponds to the deactivation of the property and the creation of several properties. After validation of the fragmentation request by the experts, the fragmented property is deactivated.
Openness
in relation to data and information – also linked to interoperability means that it is provided or made available in a format that can be accessed and used withoutrecourse to
quantity
property of a phenomenon, body, or substance, where the property has a magnitude that can be expressed by means of a number and a reference. for example a measure with
BS EN ISO 16739-1:2020
Industry Foundation Classes (IFC) for data sharing in the construction and facility management industries Part 1: Data schema
data aggregation
Data aggregation refers to a process that involves gathering information and expressing it in summary form for statistical analysis or other purposes. In many cases, data aggregation is exclusively done

Restricted and Highly Restricted information
Info Below you can find a couple of sample notes intended to be copied and pasted to a transmittal when sharing Restricted and Highly Restricted information. Restricted Information This transmittal
Master Information Delivery Plan (MIDP)
The Master Information Delivery Plan (MIDP) is the primary plan for the preparation of project information (from the supplier’s perspective), which is set out as being required in the Exchange
Integrated Project Insurance (IPI)
The integrated Project Insurance model (IPI) coupled up with Insurance Backed Alliancing is a framework which encourages and empowers project teams to work together. The procurement method introduced by Constructing Excellence
Contract Particulars
Contract Particulars refer to the document outlining the Framework Agreement’s specific core terms, which may include but are not limited to the Pricing Schedule, Authorised Officer, Contract Manager, Key Personnel,
graphical
The PAS1192 term has been replaced by ISO19650 term ‘geometrical’ Geometrical is more appropriate to describe spatial positioning and relationships
Lean construction
Lean Construction is the method of project management aiming to reduce waste on a project and improving the efficiency and quality of produced work [1]. The aim to reduce overproduction,
Circuit protective device (CPD)
A fuse or circuit-breaker providing overload and fault current protection.

PUBLISHED
Information accepted by the nominated party, in which case it will be suitable for tender or construction (2D model output only). Such that the ‘Published’ area should be maintained in
Contractor’s proposals (CP)
Contractor’s proposals (CP) in AEC industry refer to documentation prepared by tenderers for design and build projects or on a traditional contract where the bidder is to design specific parts
area of competence
area of an expert’s […] proficiency and knowledge associated to one or several groups of properties BS EN ISO 23386:2020

Breaking capacity
IWE-S1-IWE- E8_Breaking Capacity of MCCB What is Breaking Capacity (kA) Breaking capacity, often referred to as short-circuit breaking capacity, is one of the most critical specifications of a protective device.
Project Committee (PC)
a Project Committee (PC), which is created to develop one standard, after which it is disbanded. https://www.iso.org/glossary.html
BS ISO 44001:2017
Collaborative business relationship management systems Requirements and framework