Comparison of status codes between UK National Annex (NA) 2018 vs UK NA 2021
BS EN ISO 19650-2 2018 BS EN ISO 19650-2 2018, NA 02/2021 Status Code Suitability Action by Suitability Action by Information State
knowledge model
information model that expresses knowledge in a computer interpretable structure Note 1 to entry: A knowledge model consists of a number of expressions of facts about
Golden thread
The (digital by default) record of predefined documents and building information required to ensure that the original design intent and any subsequent building changes are
Employer’s Information Requirements (EIR)
The PAS 1192 term Employer Information Requirements (EIR) has been replaced by Exchange Information Requirements (EIR) on projects where ISO 19650 standards are applicable. Employer’s
Delivery team
In ISO 19650 the Delivery team term replaces the term ‘ Project Delivery team’ the meaning meant to remain the same, but the change puts
major change
change that affects the meaning, function or intended useNOTE Definition applies to properties and groups of properties.PAS 14191:2020
Virtual Design and Construction
Virtual Design and Construction (VDC) is the use of design models and project information to apply construction processes in a virtual environment to reduce time,
Power factor
Power factor is the ratio of the resistance (R) and impedance (Z) in a circuit, that is:Power factor = cos ∅ =R/Z
Cyber-Physical Systems
Systems that include integrations of computation, networking, and physical processes with feedback loops where physical processes affect computations and vice versa4. An example of a
Semantic Web
The Semantic Web, as defined by Ontotext[1] is the extension of the existing information and data on a network (or Web) to include data descriptors,
security
state of relative freedom from threat (3.13) or harm caused by deliberate, unwanted, hostile or malicious acts [cited from ISO 19650-5:2020(en), 3.7]
Delivery Team context of information exchange
ELI5-S2 BIM in Practice E3 Delivery Team context of information exchange ELI5-S2: BIM in Practice E3: Delivery Team context of information exchange explained Understanding the
Project Information Standards
Project Information standards shall be covered within the BIM Execution Plan (BEP). Standards In line with BIM Goals and Uses to ensure continuity that information
The Centre for Digital Built Britain
The Centre for Digital Built Britain (CDBB) CDBB is a partnership between the University of Cambridge and The Department for Business, Energy and Industrial Strategy
Rated current
Value of current used for specification purposes,established for a specified set of operating conditions.
Dimensionality
A dimension of space, such as width, height, or length. can be zero-dimensional (location point), one-dimensional (e.g. line, curve, path), two-dimensional (e.g. surface, face), or
Subject to Simultaneous Overload
Where circuits are grouped, there are two availablemethods of calculating the rating factor Cg to be applied: [BS7671:2018,Appendix 4,5.1.2:Equation 2] [BS7671:2018,Appendix 4,5.1.2:Equation 3,4]
As-Built Model
Model(s) based on Fabrication Shop Model(s) and installed conditions.1 1 1 The Massachusetts Port Authority, 2015. BIM Guidelines for Vertical and Horizontal Construction.
Business goals
Business goals drive organisational outcomes, helping to keep the focus on the company’s important short and long term priorities. The goals must be defined, understood,
Quality Control
Quality control indicates an operational activity within the process, while quality assurance focuses on constructing confidence that quality requirements will be met. Quality is incorporated