enumerated type value
data type consisting of a set of named values called elements, members, enumeral, or enumerators ofthe type
Subcommittee (SC)
a Subcommittee (SC), which addresses a specialized area within a TC; https://www.iso.org/glossary.html
System of systems
A system of systems is a collection of many different systems, each with its own characteristics. [1] System theory assumes that certain underlying concepts and principles are applicable to different
k Factor
Factors for conductor materials from BS7671:2018,Table43.1. Different values are given for different types of conductor and insulatingmaterials. k2s2 used in adiabatic calculations gives the short-time withstand of a conductor in

The Museum of the Future
Introduction The idea to connect 3D CAD models with construction programs (4th Dimension) was formulated in 1986-87 when Bechtel collaborated with Hitachi Ltd to develop the 4D visual model[1] The
Fault
Acircuit condition in which current flows through an abnormal or unintended path. The fault current may flow from line to line (phase fault) or line to earth (earth fault).
Federated Information Model
Computer science and IT In the fields of computer science and information technology, a federated information model refers to a structure where data is stored across multiple independent systems but can
Z1
Z1 – That part of the earth fault loop impedance which comprises the impedance under earth fault conditions of the line conductor of the circuit under consideration.

Volume strategy
ELI5-S1: BIM Basics E10: Volume Strategy (spatial) explained Introduction Volume Strategy enables information management, spatial coordination, and concurrent engineering, ultimately fitting together like a complex 3D jigsaw puzzle, where each
Geographic Information System (GIS)
A geographic information system (GIS) is a framework for gathering, managing, and analyzing data. Rooted in the science of geography, GIS integrates many types of data. It analyzes spatial location
third party
person or body that is recognized as being independent of the parties involved with the issues in question [1] Note 1 to entry: “Parties involved” are usually supplier (“first party”) and purchaser (“second party”). 1
Intermediate Event (Link/Throwing) Gateway
A gateway is a device that controls the divergence and convergence of sequence flows in a process or choreography. As a result, it will determine path branching, forking, merging, and
Committee
This could be: a Technical Committee (TC), which develops standards in a certain sector or industry; a Subcommittee (SC), which addresses a specialized area within a TC; a Project Committee
Budget
The tender response for designing, constructing and operating the existing building and the additional extension shall include the project budget’s bid documentation. The budget must incorporate the total amount of
Product Data Template (PDT)
The document aimed to be used by manufacturers and consumers where information about a product, is collated in a standardised and structured way. The information is structured in the form
pre-design process
construction process (3.3.2) determining construction properties (3.5.1) for the built environment (3.1.7) before it is designed[1] 1 Online Browsing Platform (OBP) [WWW Document], n.d. URL https://www.iso.org/obp/ui#search (accessed 4.10.21).
Information Protocol
The First Edition of the Building Information Model (BIM) Protocol published in 2013 identifies and puts into place specific obligations, liabilities and associated limitations on the use of the Building
intrinsic aspect
role that an aspect plays in a relationship with a possessor and that is dependent on the aspect as well as on the possessing object Note 1 to entry: Typically the
Geo-referencing
A BIM is said to be geo-referenced when the BIM is located with respect to one of the standard geographic survey coordinate grids established to represent locations on the Earth’s

SHARED
All project Model Authors’ information for the use of the entire project team. The Federated Model Manager will combine all information for checking against the AIR. All team members should
Text Annotation
Text annotations are a way for a modeller to provide additional information to a BPMN diagram reader. The text annotation object can be associated with a specific object on the

BIM and Lean Construction
Introduction The term referred to as Lean Construction aims to reduce overproduction, minimise handling, storage, transportation, or remove processes that do not add value. The Construction industry recognized the potential
Project Implementation Plan (PIP)
The Project Implementation Plan (PIP) it is a PAS 1192 term that should assist in establishing of the supply chain’s capability. In summary, it consists of the supplier’s: BIM assessment
supply chain
Term used to describe the relationship between organisation that provide materials, products or services for the client. Referring to ISO 19650 Framework the supply chain is synonymous to a ‘delivery
Cyber-Physical Systems
Systems that include integrations of computation, networking, and physical processes with feedback loops where physical processes affect computations and vice versa4. An example of a Cyber-Physical System is a Digital
data template
schema providing a data structure used to describe the properties of objects NOTE The relevant scope of the data template should be used together with the term “data template”. E.g.
Last Planner®
The person or group that makes assignments to direct workers. Project Architect and ‘discipline lead’ are common names for last planners in design processes. ‘Superintendent’ or ‘foremen’ are common names
data aggregation
Data aggregation refers to a process that involves gathering information and expressing it in summary form for statistical analysis or other purposes. In many cases, data aggregation is exclusively done
Residual Current Device (RCD)
AResidual Current Device (RCD) is amechanical switching device or association of devices intended to cause the opening of the contacts when the residual current* attains a given value under specified
4D Modeling
4D Modelling also referred to as 4D BIM, when supported by existing planning techniques, can improve project delivery times and schedules. To make the gains possible, all project members must
Technical Committee (TC)
a Technical Committee (TC), which develops standards in a certain sector or industry; https://www.iso.org/glossary.html
Depth of lay rating Factor (Cd)
The rating factor Cd is applied to cable sizing calculations for cable installed in the ground. Its value varies according to the depth of lay installed. See BS7671:2018,Table4B4. Indicates the

Restricted and Highly Restricted information
Info Below you can find a couple of sample notes intended to be copied and pasted to a transmittal when sharing Restricted and Highly Restricted information. Restricted Information This transmittal
Industrial Internet of Things (IIoT)
The industrial IoT (IIoT) forms an integral part of Industry 4.0, and smart manufacturing refers to interconnected sensors, and other input/output devices linked to manufacturing applications, supporting industrial automation and
Current carrying capacity of a cable (Iz)
Iz The current carrying capacity of a cable under the defined installation conditions. This is the effective rating of the cable after the relevant rating factors have been applied, i.e.,Ca,
Trigger Event
Trigger Events are the occurrences during the life of an asset that causes new or updated information to be required.There are two types of trigger event: Foreseen – planned for
built asset
individual or multiple buildings (e.g. a site or campus) or infrastructure (e.g. roads, railways, pipelines, dams, docks, etc.) built as part of a construction project or where the asset information

Complete information
adjective In Architecture Engineering and Construction (AEC), complete information is information which includes all the necessary and typical parts or elements, lacking nothing. For the information to be deemed complete,
BS EN ISO 19650-2:2018
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) — Information management using building information modelling Part 2: Delivery phase of the assets
BIM collaboration format (BCF)
BIM Collaboration Format (BCF) is an open file format that allows the addition of textual comments, screenshots, and other information on top of the IFC model layer for improved communication
PAS 14191:2020
Built environment – Management and operation of interconnected construction data dictionaries Specification
BS EN ISO 12006-2:2020
Building construction – Organization of information about construction works Part 2: Framework for classification
UK BIM Framework (roadmap)
UK BIM Framework roadmap! Almost three years have passed since the first BS EN ISO19650-1 standard was published.A lot of work has been done; some people are upset about the

BIM Execution Plan (BEP)
The purpose of the BIM Execution Plan (BEP) is to clearly define the actions required of each member of the project team in order to successfully deliver the BIM workflows
attribute
Depending on the technology discussed, the term attribute can be treated as equivalent to a property or as a set of attributes, such as the number of elements in a
business process modelling notation (BPMN)
Business Process Modelling Notation (BPMN) is a flow chart method for modelling the steps of a planned business process from beginning to end. It is a critical component of Business
DWG
DWG (“drawing format”) is a binary file format licensed by Autodesk and used for storing two and limited three-dimensional design data and metadata. It is the native format for several
major change
change that affects the meaning, function or intended useNOTE Definition applies to properties and groups of properties.PAS 14191:2020
Integrated Workplace Management System
Integrated Workplace Management System. Such systems incorporate powerful database capabilities to capture enterprise-level functions and serve as decision support tools at all organizational levels and throughout the whole building lifecycle.
- enumerated type value
- Subcommittee (SC)
- System of systems
- k Factor
- The Museum of the Future
- Fault
- Federated Information Model
- Z1
- Volume strategy
- Geographic Information System (GIS)
- third party
- Intermediate Event (Link/Throwing) Gateway
- Committee
- Budget
- Product Data Template (PDT)
- pre-design process
- Information Protocol
- intrinsic aspect
- Geo-referencing
- SHARED
- Text Annotation
- BIM and Lean Construction
- Project Implementation Plan (PIP)
- supply chain
- Cyber-Physical Systems
- data template
- Last Planner®
- data aggregation
- Residual Current Device (RCD)
- 4D Modeling
- Technical Committee (TC)
- Depth of lay rating Factor (Cd)
- Restricted and Highly Restricted information
- Industrial Internet of Things (IIoT)
- Current carrying capacity of a cable (Iz)
- Trigger Event
- built asset
- non-graphical
- Complete information
- BS EN ISO 19650-2:2018
- BIM collaboration format (BCF)
- PAS 14191:2020
- BS EN ISO 12006-2:2020
- UK BIM Framework (roadmap)
- BIM Execution Plan (BEP)
- attribute
- business process modelling notation (BPMN)
- DWG
- major change
- Integrated Workplace Management System