The Ultimate BIM Knowledge Hub
Learn the Lingo
Discover a vast dictionary of BIM terms to give you the edge in the industry.
How To Blog Posts
Find helpful tutorials and guides to master the art of BIM.
BIM Best Practices
Stay ahead of the curve with our comprehensive resources and tips.
CONTENT
Contract Particulars
Contract Particulars refer to the document outlining the Framework Agreement’s specific core terms, which may include but are not limited to the Pricing Schedule, Authorised
asset management
coordinated activity of an organization to realize value from assets Note 1 to entry: Realization of value will normally involve a balancing of costs, risks,
Computer aided facility management (CAFM)
Originally coined in the 60s, The acronym has become a catch-all for a wide range of Facilities Management platforms and software. A CAFM system can be
DWG
DWG (“drawing format”) is a binary file format licensed by Autodesk and used for storing two and limited three-dimensional design data and metadata. It is
graphical
The PAS1192 term has been replaced by ISO19650 term ‘geometrical’ Geometrical is more appropriate to describe spatial positioning and relationships
Security Management Plan
A document (or part of a document) identified in the Information Particulars setting out the security requirements for carrying out the Works in a security-minded
Emergency Voice Communication System (EVCS)
An Emergency Voice Communication System (EVCS) or (EVC) is a fixed, monitored and maintained, bidirectional, full duplex voice communication system (Refuge system) designed to facilitate
interoperability
the ability of two or more systems* to exchange information and to use the information that has been exchanged. definition adapted from the one contained
engineer
a person who designs and superintends the carrying out of civil engineering works, structures of buildings, installation of services, or who maintains such civil engineering works, structures or services https://www.iso.org/obp/ui#iso:std:iso:6707:-2:ed-3:v1:en:term:3.8.25
TN system
A system having one or more points of the source of energy directly earthed, the exposedconductive-parts of the installation being connected to that point by
Power factor
Power factor is the ratio of the resistance (R) and impedance (Z) in a circuit, that is:Power factor = cos ∅ =R/Z
Virtual Design and Construction
Virtual Design and Construction (VDC) is the use of design models and project information to apply construction processes in a virtual environment to reduce time,
Competent person
Aperson who possesses sufficient technical knowledge, relevant practical skills and experience for the nature of the electrical work undertaken and is able at all times
Terminology and UK Contract Law
The use of terms such as Lead Appointed Party, Appointed Party and Task Team in lieu of terms: employer, supplier, contractor and subcontractor, require clarification
Budget
The tender response for designing, constructing and operating the existing building and the additional extension shall include the project budget’s bid documentation. The budget must
Voorwaarden scheppen voor Invoeren Standaardisatie ICT in de Infrastructuur-sector (VISI)
VISI acronym for Dutch standard for communication between partners in construction projects translates as Creating conditions for the implementation of ICT standardization for the construction
client
actor (3.2.1) responsible for initiating a project and approving the brief [cited from ISO 19650-1:2018(en), 3.2.5] The UK BIM Alliance, responding to the inconsistency between the current
Operations and Maintenance (O&M)
Describes the functions, duties, and labour associated with the operations of an asset, including repairs, replacement of parts and structural components, and other activities needed
Collaborative Design
Working with different teams is probably the most difficult part of the design process. It is important to note that a collaborative design process is
Existing Conditions Modeling
A process of developing a 3D model of the existing conditions for an asset, or a specific area within a facility.The model can be developed