The Ultimate BIM Knowledge Hub
Your one-stop resource for BIM electrical.
Revit Guides
Data Management
ELI5
Parametric behaviour
The parametric behaviour of an object describes whether its shape, position, and orientation are designed to be dependent on other information associated with the object or the context in which
BS EN ISO 19650-2:2018
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) — Information management using building information modelling Part 2: Delivery phase of the assets
unit
standard measurements of physical quantities that require a clear definition to be useful. The International Bureau of Weights and Measures (BIPM) is responsible for ensuring the standardization of the use
BS EN ISO 12006-3:2016
Building construction — Organization of information about construction works Part 3: Framework for object-oriented information
Risk Register
means a risk register containing the risks associated with the timely delivery of information as may be identified in the Information Particulars and/or provided in accordance with the Information Standard.

Common Data Environment (CDE)
ELI5-S1: BIM Basics E2: CDE Explained The purpose of using Common Data Environment (CDE) on a project is to provide the right person with the right information at the right
Current-carrying capacity
Themaximum current which can be carried by a conductor under specified conditions (Installation method, temperature,grouping,etc.)without its steady-state temperature exceeding a specified value (for example,90 ºCfor cables with thermosetting insulation).
National Annex (NA)
With reference to BS EN ISO 19650 Framework, the working group could not conclude on international codification and standardised conventions. Hence Paul Shillcock and David Churcher, the lead authors, came
End Event
An end event denotes the point at which a process’s path will come to an end. End events can only result in a “throw” of a result.[1] Symbol 1] Silver,
Plain Language Questions (PLQ)
The publication of ISO 19650 set of standards replaces use of PLQ and instead introduce the term with exchange information requirements (EIR) and project information requirements (PIR). Project information requirements
BS EN ISO 19650-3:2020
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) – Information management using building information modelling Part 3: Operational phase of the assets
Unified Cloud Platform (UCP)
A unified cloud platform (UCP) has been introduced to facilitate the integration of multiple cloud services into a single cloud environment. The UCP is essentially a cloud management multi-platform that
definition
representation of a concept by a descriptive statement which serves to differentiate it from related concepts Note 1 to entry: A definition may be expressed as natural language text (a textual
Digital Construction
The terminology such as digital built environment and smart asset management, often referred to as Digital Construction, encompasses multiple technologies and processes related to information or project management and the

The future of BIM Managers in the AEC Industry
The future of BIM Manager The ‘BIM Manager’ role is discussed here in broad terms of management, not confined into a specific BIM role.[1] The function of BIM Manager already
Key Performance Indicator (KPI)
KPI is an abbreviation for key performance indicator, which is a quantifiable measure of performance over time for a specific goal. KPIs provide goals for teams to aim for, milestones
Cable k2s2
k2s2 its an Energy withstand of cable in A2s. For example,a cable with a withstand of 12 x 104 A2s, can sustain without permanentdamage,a fault current of 1,000 A for
Assignment
A request or offer resulting in a Reliable Promise and is ready to be placed on the Weekly Work Plan (WWP) for performance. An assignment must meet the characteristics for
Association
An association is used to link data and artefacts to flow objects. Non-flow objects, such as text and graphics, can be associated with flow objects and flow.[1] Symbol [1] Silver,
BS EN ISO 19650-5:2020
Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) Information management using building information modelling Part 5: Security-minded approach to information management
BS EN 17412‑1:2020
Building Information Modelling — Level of Information NeedPart 1: Concepts and principles
Tier 2
In the construction industry, Tier 2 is a Contractor referred in ISO 19650 as the Appointed party with a sub-contract who provide goods or services directly to the Lead Appointed
Geo-referencing
A BIM is said to be geo-referenced when the BIM is located with respect to one of the standard geographic survey coordinate grids established to represent locations on the Earth’s
Construction Products Regulation (CPR)
Construction Products Regulation (CPR) https://ec.europa.eu/growth/sectors/construction/product-regulation_en#:~:text=The%20Construction%20Products%20Regulation%20(CPR,the%20performance%20of%20construction%20products.
Code of Conduct
Set of principles to be followed by people involved in ISO work, e.g. working within an international framework, upholding consensus, being ethical. https://www.iso.org/glossary.html

Post-COVID 19 pandemic Architecture Engineering and Construction (AEC) Industry
Introduction The COVID19 pandemic has impacted global health and the economy. This report explores the shift in Building Information Modelling (BIM) and associated technology, its impact on health and safety,
Information Controller
Responsible for setup and management of the Common Data Environment (CDE), document submission, RFI and other project document transactions. [Appointment: Lead Appointed Party Information Controller, site-based/office based.] [source] PDE 4301

Selectivity
Resolving Selectivity Issues in Electrical Design Free Trimble ProDesign Introduction Training Course Click the button below for more details: ProDesign Course Selectivity is achieved where,under overcurrent conditions, the protective device
domain
area of activity covering a science, a technique, a material, etc.Note 1 to entry: A domain can be associated with a group to which the property […] applies. BS EN

PAS 1192 vs ISO 19650 terms
Quick reference guide In here you can find a quick reference guide with PAS1192 and ISO 19650 terminology comparison. PAS references (superseded) ISO References (current) Pre-contract BEP Pre-appointment BEP Post-contract
Level of detail (LOD)
Level of detail (LOD) it is a term introduced by PAS 1192, used in relation with management of the progression and uses of information. Typically referred to geometrical information There

Management of the cyber-security threats in Common Data Environment
The increased reliance of the IT Technology Widely used cloud-based systems with file-sharing protocols have are the way of the future, but the use of such a platforms increase the
Mobilization Plan
A plan for the Mobilization of the Delivery Team’s resources in accordance with the Information Standard which is contained in the Appointment or, if no Mobilization Plan is contained in
Facility management (FM)
Facility management (FM) is an organizational function that integrates people and processes within the built environment to improve the functionality, comfort, safety, and efficiency of the core business.
cost plan
statement showing an apportionment of an estimate (3.7.9) or of an agreed budget between cost (3.7.1) headingsNote 1 to entry: For example, the cost plan might be broken down into building elements. [1] 1 Online Browsing Platform (OBP)
replacement request
A replacement request corresponds to the creation of the property and the deactivation of the property it replaces. After validation of the replacement request by the experts, the replaced property
Dimensionality
A dimension of space, such as width, height, or length. can be zero-dimensional (location point), one-dimensional (e.g. line, curve, path), two-dimensional (e.g. surface, face), or three-dimensional (e.g. surface, face) (e.g.
BS EN ISO 29481-2:2016
Building information models — Information delivery manual Part 2: Interaction framework
Ambient temperature
The temperature of the free air surrounding a cable,or in the case of cables installed in the ground, the temperature of the surrounding soil.For an enclosed method such as ‘In
Permitted Purpose
A submittal state defining the intent or suitability. Permitted Purpose means any purpose related to the Works (and/or (without limitation) the construction, refurbishment, extension, operation, management and/or maintenance of the
validation
confirmation, through the provision of objective evidence, that the requirements for a specific intendeduse or application have been fulfilled [SOURCE: BS EN 17412‑1:2020] For example, it is the process of
Gross Internal Area (GIA)
The total area of buildings owned, occupied, or maintained, measured to the internal face of the perimeter walls at each floor level, is referred to as GIA (i.e. the footprint

Function
ELI5-S1 BIM Basics E17_BIM Functions Understanding Functions: A Basic Guide In both everyday life and specialised fields like mathematics, computer science, and even construction, the term “function” is widely used.
Responsibility matrix
a chart that describes the participation by various functions in completing tasks or deliverables [cited from ISO 19650-1:2018(en), 3.1.1] Responsibility matrix shall be developed to cover information management activities and
merge request
A merge request corresponds to the creation of one property and the deactivation of several properties. After validation of the merge request by the experts, the merged properties are deactivated.
smart building
The term “smart building” was originally introduced by the European Union in the Energy Performance of Buildings Directive (EPBD)[1] as one of the main enablers of the future of the built environment,
Start Event (Message)
A message is received from a participant, which initiates the process. The actual recipient of the message can be identified by connecting the event to a participant via a message
built asset
individual or multiple buildings (e.g. a site or campus) or infrastructure (e.g. roads, railways, pipelines, dams, docks, etc.) built as part of a construction project or where the asset information

Complete information
adjective In Architecture Engineering and Construction (AEC), complete information is information which includes all the necessary and typical parts or elements, lacking nothing. For the information to be deemed complete,

BS EN ISO 19650-2 UK National Annex (NA) 2021 status and suitability reference table
BS EN ISO 19650-2 2018, NA 02/2021 Status Code Suitability Action by Information State (at any project stage): Work in progress (WIP) S0 Information developed within a task team [C],